Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23249A18418 September 2023Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06Liquid penetrant
ML22082A25329 March 2022Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27Incorporated by reference
ML22012A29721 January 2022Proposed Alternative to Use ASME OM Code Case OMN-27Incorporated by reference
L-20-256, Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI28 September 2020Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML20223A01420 August 2020Issuance of Relief Request SSR-1, Revision 0, from the Requirements of the ASME Code (EPID L-2020-LLR-0050 (COVID-19))Incorporated by reference
Pandemic
Coronavirus
ML20206K8657 August 2020Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19))VT-2
Pandemic
Coronavirus
Pressure Boundary Leakage
Pressure boundary leak
Through-Wall Leak
ML20145A0003 June 2020Relief from the Requirements of the ASME Code for Requests VRR6 and VRR5 (EPID L-2020-LLR-0049 and EPID L-2020-LLR-0051 (COVID-19))Safe Shutdown
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
Pandemic
Coronavirus
Grace period
ML20100N3229 April 2020Verbal Relief for Penetration Evaluation and Hot Leg Nozzles - Delivered 4/9/2020 at 10:00 AmVT-2
Pandemic
COVID-19
ML20099B2578 April 2020Verbal Relief Unit 2 CIVIncorporated by reference
Coronavirus
ML20098F3017 April 2020Verbal Relief for Appendix I Safety Relief ValvesIncorporated by reference
Coronavirus
Grace period
ML20095J2194 April 2020Email Beaver Valley Power Station, Unit 2 - Verbal Relief for MOVs - Delivered 4/4/2020 at 4:00 PmProbabilistic Risk Assessment
Incorporated by reference
COVID-19
Grace period
ML20095J0994 April 2020Email Beaver Valley Power Station, Unit 2 - Verbal Relief for Snubbers - Delivered 4/4/2020 at 4:00 P.MIncorporated by reference
COVID-19
L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections3 April 202010 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle InspectionsPandemic
COVID-19
Pressure Boundary Leakage
Through-Wall Leak
Dissimilar Metal Weld
L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing3 April 2020CFR 50.55a Request Number SRR-1, Revision 0, Snubber TestingPandemic
COVID-19
L-20-060, CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency2 April 2020CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test FrequencyPandemic
COVID-19
L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency1 April 2020CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test FrequencyProbabilistic Risk Assessment
Pandemic
COVID-19
Grace period
ML20079F81626 March 2020Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection IntervalBoric Acid
VT-2
Incorporated by reference
Through-Wall Leak
ML19275E29416 October 2019Issuance of Relief Request Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in Lieu of Specific ASME Code RequirementsHigh Radiation Area
Incorporated by reference
Earthquake
Through-Wall Leak
L-19-107, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements27 August 2019Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination RequirementsVT-2
Through-Wall Leak
Through Wall Leak
Scaffolding
ML19051A10820 February 2019Request Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds (Request 2-TYP-4-RV-05, Revision 0)
ML18227A73327 August 2018Request for Relief from the Requirements of the ASME CodeHydrostatic
Nondestructive Examination
Incorporated by reference
ML18004A12222 January 2018FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088)Through-Wall Leak
L-17-317, Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01)15 November 2017Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 1-TYP-4-BN-01)
L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2)25 October 201710 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2)Dissimilar Metal Weld
ML17167A06726 June 2017Requests for Alternatives and Requests for Relief Fourth 10-Year Inservice Test Program Interval (CAC Nos. MF8333-MF8356). Note: Correction Safety Evaluation See ML17255A526Boric Acid
Stroke time
Incorporated by reference
Surveillance Frequency Control Program
Grace period
ML17159A44226 June 2017Requests for Alternatives and Requests for Relief Fifth 10-Year Inservice Testing Program Interval (CAC Nos. MF8332 Through MF8357). Note: Correction Safety Evaluation See ML17255A508Boric Acid
Stroke time
Probabilistic Risk Assessment
Temporary Modification
Incorporated by reference
Scaffolding
Grace period
ML17047A6102 March 2017Relief from the Requirements of the American Society of Mechanical Engineers Code
ML17041A1852 March 2017Relief from the Requirements of the ASME Code
ML17048A0042 March 2017Relief from the Requirements of the ASME CodePower-Operated Valves
Grace period
ML16328A12523 January 2017Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783)Grace period
ML16190A13327 December 2016Relief from the Requirements of the ASME CodeProbabilistic Risk Assessment
Incorporated by reference
ML16319A0571 December 2016Acceptance of Requested Licensing Action Relief Request for Proposed Alternative to Perform As-Found Set-Pressure Test
ML16257A62121 November 2016Relief Request BV2-PZR-01, Regarding Alternative to Requirements for Components Connected to the Steam Side of the PressurizerLoop seal
ML16228A40821 October 2016Correction to Relief Request 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove Welds
ML16147A36217 June 2016Relief Request No. 2-TYP-3-RV-04, Revision 0, Regarding Repair Activities for Reactor Vessel Head Penetration Nozzles and Associated J-Groove WeldsIncorporated by reference
ML14363A40928 January 2015Relief Request No. 1-TYP-4-RV-04 Regarding the Examination Requirements of Code Case N-729-1Boric Acid
VT-2
ML1202702987 February 2012Relief Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification FrequencyStroke time
ML11313042822 November 2011Relief Request VRR5 Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency for the 10-Year Inservice Testing Program Interval
ML11264041220 September 2011Acceptance Review Results for VC Summer Relief Request (ME6879)
ML11077055126 April 2011Relief Request VRR2 Regarding the 10-Year Inservice Testing Program IntervalBoric Acid
ML11047055725 February 2011Relief Request Regarding an Alternative Weld Repair Method for Reactor Vessel Head Penetrations J-Groove WeldsWeld Overlay
Nondestructive Examination
Incorporated by reference
ML10068078112 March 2010Third 10-Year ISI Interval Relief Request (ME2608)Non-Destructive Examination
Weld Overlay
Incorporated by reference
L-08-362, Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements2 December 2008Beaver, Units 1 and 2, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Paragraph IWA-5244 Examination Requirements
L-08-207, Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement24 September 2008Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inspection Period Extension Requirement
L-08-069, Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3)9 April 2008Impractical American Society of Mechanical Engineers Code Section XI Weld Examination Requirements (Request Nos. 1-TYP-3-RA-1, 1-TYP-3-RA-2, 1-TYP-3-RA-3)VT-2
Liquid penetrant
Through-Wall Leak
ML07205048817 September 2007Relief Request No. BV1-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle WeldsWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML07059055530 April 2007Relief, Relief Request No. BV2-PZR-01 Regarding Weld Overlay Repairs on Pressurizer Nozzle WeldsWeld Overlay
Hydrostatic
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
DM weld
L-07-056, Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year Update28 March 2007Requests Approval of Proposed Alternatives and Relief for Inservice Testing Program Ten-Year UpdateSafe Shutdown
Boric Acid
Stroke time
Temporary Modification
Incorporated by reference
Cold shutdown justification
Power-Operated Valves
Pressure Boundary Leakage
Scaffolding
ML0625801202 October 2006(BVPS-1 and 2), Inservice Inspection (ISI) Program, Alternative Examination of Reactor Coolant Pipe Welds, Request for Relief No. BV3-RV-2Dissimilar Metal Weld
L-06-042, Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements7 April 2006Proposed Alternative to American Society of Mechanical Engineers Code Section XI Examination Requirements