MONTHYEARML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 “Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 IR 05000382/20230042024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment 2024-08-08
[Table view] |
Text
December 21, 2011 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
SUBJECT:
ASSESSMENT FOLLOWUP LETTER
- WATERFORD STEAM ELECTRIC STATION, UNIT 3
Dear Ms. Jacobs:
On November 17, 2011, the NRC staff completed, as part of our continuous review, an updated assessment of Waterford Steam Electric Station, Unit 3 performance. The NRC's evaluation consisted of a review of performance indicators and inspection results.
This letter informs you of the NRC's assessment of the fourth quarter of 201 1 and its plans for a future inspection at your facility.
This letter supplements, but does not supersede, the mid
-cycle letter issued on September 1, 201
- 1. Overall, Waterford Steam Electric Station, Unit 3, operated in a manner that preserved the public's health and safety and fully met cornerstone objectives. O n November 17, 2011, the NRC forwarded a letter that stated the final significance determination of a White inspection finding in the Occupational Radiation Safety Cornerstone.
This finding involved the failure to use effective engineering controls as part of pre
-job planning to reduce contamination and subsequent exposure associated with leaking reactor coolant pump seals. The NRC determined the performance at Waterford Steam Electric Station to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning on July 1, 2011. As a result of the Regulatory Response performance, a supplemental inspection will be performed in accordance with Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." The objectives of this supplemental inspection are to provide assurance that the root causes and contributing causes of risk
-significant performance issues are understood, provide assurance that the extent of condition and extent of cause of risk
-significant performance issues are identified, and provide assurance that your corrective actions for risk
-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. We will not schedule the supplemental inspection until you notify us of your readiness for the inspection.
U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511 Entergy Operations Inc. In accordance with 10 CFR 2.390 of the NRC' s "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room
). Please contact Ray Azua at (817) 860
-8 4 4 5 with any questions you may have regarding this letter. Sincerely, /RA/ Kriss M. Kennedy Director, Division of Reactor Projects Docket: 50
-382 License: NPF-38
Enclosures:
Electronic Distribution Distribution via: Electronic Distribution
Entergy Operations Inc. Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov
) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov
) DRS Deputy Director (Tom.Blount@nrc.gov
) Senior Resident Inspector (Marlone.Davis@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov)
Acting Branch Chief, DRP/E (Ray.Azua@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov
) Project Engineer (Jim.Melfi@nrc.gov
) WAT Administrative Assistant (Linda.Dufrene@nrc.gov
) Public Affairs Officer (Victor.Dricks@nrc.gov
) Public Affairs Officer (Lara.Uselding@nrc.gov
) Project Manager (Kaly.Kalyanam@nrc.gov)
Acting DRS/TSB Branch Chief (Ryan.Alexander@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov
) Regional Counsel (Karla.Fuller@nrc.gov
) Congressional Affairs Officer (Jenny.Weil@nrc.gov
) OEMail Resource ROPreports RSLO (Bill.Maier@nrc.gov
) NSIR (Robert.Kahler@nrc.gov
) NSIR/DPR/EP (Eric.Schrader@nrc.gov)
OEDO RIV Coordinator (Mark.Franke@nrc.gov)
R:\_REACTORS\WAT SUNSI Rev Compl.
Yes No ADAMS Yes No Reviewer Initials JFM1 Publicly Avail Yes No Sensitive Yes No Sens. Type Initials JFM1 PE:DRP/E C:DRP/E SHP:PSB2 C:DRS/PSB2 RIV/PAO JMelfi RAzua LRicketson GWerner VDricks /RA/ /ASanchez for/
/RA/ /RA/ /RA/ 12/12/11 12/12/11 12/12/11 12/13/11 12/9/11 DD:DRS D:DRS D:DRP TBlount AVegel KKennedy 12/11/11 12/13/11 12/21/11 OFFICIAL RECORD COPY T=Telephone E=E
-mail F=Fax