MONTHYEARIR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 IR 05000293/19570012023-05-26026 May 2023 635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077 IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 IR 05000293/20210042022-02-0909 February 2022 NRC Inspection Report No. 05000293/2021004 IR 05000293/20210032021-11-12012 November 2021 NRC Inspection Report No. 05000293/2021003 IR 05000293/20210022021-08-10010 August 2021 NRC Innspection Report No. 05000293/2021002 ML21187A2702021-07-12012 July 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401 IR 05000293/20214022021-07-12012 July 2021 Security Decommissioning Inspection Report 05000293/2021402 IR 05000293/20210012021-05-13013 May 2021 NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station IR 05000293/20214012021-04-27027 April 2021 Security Decommissioning Inspection Report 05000293/2021401 IR 05000293/20200042021-02-22022 February 2021 NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/20204012020-12-17017 December 2020 Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only) ML20335A0092020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/20200022020-11-30030 November 2020 NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts ML20070P3342020-03-10010 March 2020 NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts IR 05000293/19820012020-01-0303 January 2020 David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 IR 05000293/20190022019-07-24024 July 2019 Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter IR 05000293/20190012019-05-13013 May 2019 Integrated Inspection Report 05000293/2019001 IR 05000293/20180062019-03-0404 March 2019 Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure IR 05000293/20180042019-02-13013 February 2019 Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 IR 05000293/20180132019-01-23023 January 2019 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013 IR 05000293/20185012018-12-0606 December 2018 Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501 IR 05000293/20180152018-11-21021 November 2018 Triennial Fire Protection Inspection Report 05000293/2018015 IR 05000293/20180032018-11-13013 November 2018 Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001 IR 05000293/20180122018-11-0101 November 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012 IR 05000293/20180112018-10-0909 October 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011 IR 05000293/20184112018-09-24024 September 2018 Baseline Security Inspection Report 05000293/2018411 IR 05000293/20180052018-08-28028 August 2018 Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) IR 05000293/20180022018-08-14014 August 2018 Integrated Inspection Report 05000293/2018002 IR 05000293/20184102018-06-20020 June 2018 Baseline Security Inspection Report 05000293/2018410 (Letter Only) IR 05000293/20180102018-06-13013 June 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010 IR 05000293/20180012018-05-14014 May 2018 Integrated Inspection Report 05000293/2018001 IR 05000416/20170142018-03-12012 March 2018 Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 IR 05000293/20170062018-02-28028 February 2018 Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) IR 05000293/20170042018-02-14014 February 2018 Integrated Inspection Report 05000293/2017004 IR 05000293/20170102018-02-0101 February 2018 Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010 IR 05000293/20170092017-12-21021 December 2017 Problem Identification and Resolution Inspection Report 05000293/2017009 IR 05000293/20172012017-11-21021 November 2017 NRC Security Inspection Report 05000293/2017201 IR 05000293/20170032017-11-14014 November 2017 Integrated Inspection Report 05000293/2017003 IR 05000293/20174042017-10-17017 October 2017 Material Control and Accounting Program Inspection Report 05000293/2017404 (Letter Only) IR 05000293/20174032017-10-12012 October 2017 Baseline Security Inspection Report 05000293/2017403, (Letter Only) IR 05000293/20170072017-09-28028 September 2017 Design Bases Assurance Inspection Report 05000293/2017007 IR 05000293/20174052017-09-0505 September 2017 Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) IR 05000293/20170052017-08-28028 August 2017 Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) IR 05000293/20170022017-08-14014 August 2017 Integrated Inspection Report 05000293/2017002 IR 05000293/20170082017-08-0909 August 2017 Final Significance Determination for a Green Finding and Results of Regulatory Conference - Inspection Report 05000293/2017008 2023-08-04
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Inspection Report - Pilgrim - 2021002 |
---|
|
|
Text
August 10, 2021
SUBJECT:
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT NO. 05000293/2021002
Dear Ms. Cowan:
On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shutdown Pilgrim Nuclear Power Station (PNPS). An on-site inspection was performed from June 7 - 11, 2021. Additional inspection activities (in office reviews) were conducted remotely as a consequence of the COVID-19 public health emergency (PHE) during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The results of the inspection were discussed with Mr. John Moylan, Site Vice President, and other members of the PNPS staff on July 14, 2021, and are described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if any, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's Website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Harold (Harry) Anagnostopoulos at 610-337-5322 if you have any questions regarding this matter.
Sincerely, Digitally signed by Anthony M. Anthony M. Dimitriadis Date: 2021.08.10 Dimitriadis 14:33:16 -04'00'
Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security Docket No. 05000293 License No. DPR-35 Enclosure: Inspection Report 05000293/2021002 w/Attachment cc w/encl: Distribution via ListServ
EXECUTIVE SUMMARY
Holtec Decommissioning International, LLC (HDI)
Pilgrim Nuclear Power Station (PNPS)
NRC Inspection Report No. 05000293/2021002 An announced routine decommissioning inspection of Pilgrim Nuclear Power Station (PNPS)was completed on June 30, 2021. An on-site focused topical inspection using three inspection procedures was conducted from June 7 - 11, 2021. Additional inspection activities were conducted remotely during the inspection period as a consequence of the COVID-19 public health emergency (PHE). The inspection included a review of the results of routine radiological effluent and environmental monitoring, inspection of radioactive waste processing and storage equipment & areas, changes to the Offsite Dose Calculation Manual (ODCM), inspection of the 10 CFR Part 37 security program, and an observation of Onsite Safety Review Committee activities. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The U.S Nuclear Regulatory Commissions (NRC's) program for overseeing the safe operation of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,
Decommissioning Power Reactor Inspection Program."
Based on the results of this inspection, no violations of NRC requirements were identified.
ii Inspection Report No. 05000293/2021002
REPORT DETAILS
1.0 Background On June 10, 2019, Entergy Nuclear Operations, Inc. (ENOI) certified cessation of power operations and the permanent removal of fuel from the PNPS reactor vessel (ADAMS Accession Number: ML19161A033). This met the requirements of 10 CFR 50.82(a)(1)(i)and 50.82(a)(1)(ii). On June 11, 2019, the NRC notified PNPS that the NRC would no longer perform its oversight activities in accordance with the Operating Reactor Assessment Program and that oversight would be conducted under the provisions outlined in IMC 2561 Decommissioning Power Reactor Inspection Program (ADAMS Accession No. ML19162A033). On August 27, 2019 an amendment was issued transferring the license from ENOI to Holtec International, LLC., (HDI) (ADAMS Accession No. ML19235A050). PNPS is in the active decommissioning phase with fuel in the spent fuel pool as described in IMC 2561.
2.0 Decommissioning Performance and Status Review
a. Inspection Scope
[Inspection Procedures 84750, 86750, 87137]
The inspector performed a walk-down of selected waste processing systems to verify that the system configurations and operations were in agreement with the descriptions in the Decommissioning Safety Analysis Report (DSAR), the Offsite Dose Calculation Manual (ODCM), and the Process Control Program (PCP).
The inspector reviewed the most recent radiological surveys of radioactive waste storage and processing areas to assess their radiological conditions, and then entered a selection of these areas to observe their material condition.
The inspector reviewed any changes made to the ODCM, PCP, and the radioactive waste system design and operation.
The inspector observed the condition of the liquid effluent radioactive waste radiation monitor, its associated valves, and walked-down the exposed portions of the discharge piping. The inspector reviewed the results of a recent pressure-drop test of the liquid radioactive waste discharge line, which was performed to verify the integrity of the piping and its connections.
The inspector selected a sample of effluent radiation monitors and to determine if they were appropriately calibrated.
The inspector performed a walk-down of the Reactor Building and Turbine Building roof areas. The inspector toured the accessible portions of the reactor containment (drywell 23 foot elevation), and observed the storage of control rod drive mechanisms in a storage area of the main turbine deck. The inspector performed direct observations of the conditions of the turbine building air effluent radiation monitors.
The inspector reviewed the Annual Radioactive Effluent Release Report and the Annual Radiological Environmental Operating Report for any anomalous results to verify that reported doses were below regulatory requirements.
Inspection Report No. 05000293/2021002
The inspector observed a selection of environmental sampling stations to evaluate their location, placement, and material condition. The inspector reviewed the implementation of the Groundwater Protection Initiative program, attended a meeting of the Onsite Safety Review Committee to observe management processes, and reviewed the results of the Phase 1 site characterization effort.
Using inspection procedure 86750 (and portions of 87137 as a technical reference), the inspector evaluated implementation of the licensees security plan associated with 10 CFR 37, walked-down the storage areas, and discussed the security strategies for these areas with the Security Manager.
b. Observations and Findings
The inspector verified that HDI had identified problems associated with radioactive waste storage, processing, and transportation activities, entered them into the corrective action program, and had implemented appropriate corrective actions.
The inspector determined that recent changes to the Radiological Environmental Monitoring Program (REMP) were appropriate to the change in plant status and plant conditions following permanent cessation of operations (and the associated decay of short-lived radionuclides).
The inspector determined that the air effluents from the turbine building were minimal (following permanent cessation of operations) and appropriately accounted for by the reactor building ventilation monitor. The turbine building gaseous effluent monitoring system has been removed from service.
The inspector observed the wind-related damage to the turbine building roof membrane and verified that the damage was not likely to cause any immediate challenge to the ability to manage water infiltration or the safe storage of radioactive materials. The planned timeline for repairs was determined to be adequate.
The inspector determined the Onsite Safety Review Committees activities to be intrusive, challenging, and an effective management tool to ensure safe and compliant decommissioning activities.
c. Conclusions
Based on the results of this inspection, no violations of NRC requirements were identified.
3.0
Exit Meeting Summary
On July 14, 2021, the inspector presented the inspection results to Mr. John Moylan, Site Vice President, and other members of the HDI staff. No proprietary information was retained by the inspector or documented in this report.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Inspection Report No. 05000293/2021002
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
- J. Moylan, Site Vice President
- J. McDonough, Operations Manager
- D. Noyes, Senior Compliance Manager
- M. Lawson, Radiation Protection Manager
- F. McGinnis, Regulatory Assurance Specialist
J. ODonnel - Operations Shift Manager
- M. Thornhill, Certified Health Physicist
ITEMS OPEN, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED
CFR Part 37 Security Plan
CFR Part 37 security program annual reviews for 2019 and 2020
Air Station Location Study at the Pilgrim Nuclear Power Station Based on 2016 - 2019
Meteorological Data, Holian Environmental, LLC, May 2020
Annual Radioactive Effluent Release Report, January 1 through December 31, 2020, dated
5/6/2021
Annual Radiological Environmental Operating Report, January 1 through December 31, 2020,
dated 5/6/2021
Comparison Study of Meteorological Data from the 220-Foot Primary and 160-Foot Backup
Towers at the Pilgrim Nuclear Power Station, Holian Environmental, LLC, August 2019.
EN-NS-101, Unescorted Access Authorization Program, Revision 26
EN-NS-101-03, Processing Individuals for UAA/UA and SGI Access, Revision 4
EN-NS-101-06, Terminating, Denial and Appeal of Unescorted Access
Authorization/Unescorted Access, Revision 4
EN-NS-224, SOCA Access Controls, Revision 3
EN-RW-105, Process Control Program, Revision 6
Issue Reports PIL-01595, 01907, 01915, 02301, 02312, 02397, 02425, 02512, 02600, 02636,
2783, 02877, 03165
Photographs, overboard discharge line effluent flange
Procedure 2.01, Station Access Control, Revision 54
Process Radiation Monitor Calibration Package, RBV A, dated 7/28/2020
Process Radiation Monitor Calibration Package, RBV B, dated 3/19/2020
Process Radiation Monitor Calibration Package, Liquid Radwaste, dated 6/12/2019
Pilgrim Nuclear Power Station Defueled Safety Analysis Report, Revision 1
PNPS Groundwater Tritium Results, spreadsheet
PNPS-ODCM, Pilgrim Nuclear Power Station Offsite Dose Calculation Manual, Revision 14.
PNPS Radiological Support Group 1st Half 2020 Self Assessment Report, dated 7/31/2020
Presentation, Amended Environmental Site Assessment Work Plan Briefing, dated 5/24/2021
Radiological Evaluation 21-051, Basis for Removing the Turbine Building GEMS from Service
and Removing it from the ODCM in Revision 14, Revision 0
Radiological survey map #100, dated 10/30/2020
Radiological survey map #100, dated 6/8/2021
Radiological survey map #103A, dated 4/26/2021
Inspection Report No. 05000293/2021002
Radiological survey map #113, dated 10/6/2020
Radiological survey map #115, dated 4/20/2021
Radiological survey map #117, dated 6/2/2021
Radiological survey map #118, dated 6/2/2021
Radiological survey map #118, dated 6/16/2021 at 0900
Radiological survey map #118, dated 6/16/2021 at 1400
Radiological survey map #125, dated 9/11/2019
Radiological survey map #125, dated 2/7/2020
Radiological survey of the monitor pump room, dated 8/22/2019
Radiological survey of the treated water pump and tank rooms, dated 8/22/2019
Radiological survey PNP-1709-0152
Radiological survey PNP-1711-0112
Radiological survey PNP-1906-00089
Report, PNPS Waste Focus Meeting, dated 6/10/2021
Work order PIL-WR-2869-15, Confirm buried portion of liquid radwaste discharge piping
between valve 20-HO-316 and discharge canal outlet diffuser is leak tight.
LIST OF ACRONYMS USED
ADAMS Agency-wide Document and Access Management System
CFR Code of Federal Regulations
DOE U.S. Department of Energy
DSAR Decommissioning Safety Analysis Report
ENOI Entergy Nuclear Operations, Inc
GPO Government Printing Office
HDI Holtec Decommissioning International, LLC
IMC Inspection Manual Chapter
IP Inspection Procedure
IR Issue Report
NRC U.S. Nuclear Regulatory Commission
ODCM Offsite Dose Calculation Manual
PHE Public Health Emergency
PCP Process Control Program
PNPS Pilgrim Nuclear Power Station
REMP Radiological Environmental Monitoring Program
SFP Spent Fuel Pool
SNM Special Nuclear Material
TI Transport Index
Inspection Report No. 05000293/2021002