September 24, 2018
SUBJECT:
PILGRIM NUCLEAR POWER STATION - BASELINE SECURITY INSPECTION REPORT 05000293/2018411
Dear Mr. Sullivan:
On August 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. Inspection results are documented in the enclosed report.
NRC inspectors did not identify any finding or violation of more than minor significance.
This letter and the enclosed report will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response containing Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-293 License No. DPR-35
Enclosure:
Inspection Report 05000293/2018411
REGION I==
Docket Number:
50-293
License Number:
Report Number:
Enterprise Identifier:
I-2018-411-0016
Licensee:
Entergy Nuclear Northeast (Entergy)
Facility:
Pilgrim Nuclear Power Station
Location:
Plymouth, MA
Dates:
August 27 - August 30, 2018
Inspectors:
D. Caron, Senior Physical Security Inspector
K. Hussar, Physical Security Inspector
S. McCarver, Physical Security Inspector
Approved By:
Raymond R. McKinley, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at Pilgrim Nuclear Power Station by conducting the baseline security inspections described in this report in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or more-than-minor violations were identified.
INSPECTION SCOPE
Unless otherwise noted, baseline security inspections were conducted using guidance in the appropriate inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.05 Protective Strategy
NRC inspectors evaluated the licensees protective strategy through completion of the following IP elements:
Tier I All Requirements Tier II 18 Requirements (02.05 a, 02.06 a, c, d, f - n, 02.07 a - e)
Tier III 4 Requirements (02.09 b, c, 02.10 a, 02.11 a)
71130.14 Review of Power Reactor Target Sets
NRC inspectors evaluated the licensees target set program through completion of all elements in the IP.
EXIT MEETINGS AND DEBRIEFS
On August 30, 2018, the inspectors presented the inspection results to Mr. Brian Sullivan, Site Vice President, and other members of the licensees staff. Inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
EN-NS-215, Conduct of Security Force Exercises and Drills, Revision 18
EN-NS-216, Controller Responsibility Guidelines, Revision 11
Pilgrim Nuclear Power Station Integrated Response Plan, 8/30/13
Calc. No. C15.0.3271, Enercon Services, Inc., Revision 2, 10/17/04
Security Procedure No 1.06, Security Patrols and Equipment Inspections, Revision 20
Security Procedure No 2.03, Bullet Resistant Enclosures (BRE), Revision 5
Security Procedure No 5.01, CAS/SAS/SOCA Alarm Station Operations, Revision 18
EN-NS-220, Managing the Safety/Security Interface, Revision 4
EN-NS-306, Development and Maintenance of Target Sets, Revision 5
Procedure 5.3.14, Security Incidents, Revision 43
QA-16-2017-PNP-1, Quality Assurance Audit Report, October 16 - December 7, 2017