IR 05000293/202340131 August 2023NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only)Affidavit
IR 05000293/20230024 August 2023NRC Inspection Report No. 05000293/2023002Grab sample
Offsite Dose Calculation Manual
IR 05000293/195700126 May 2023635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077
IR 05000293/202200415 February 2023NRC Inspection Report No. 05000293/2022004High Radiation Area
Coatings
Fire Protection Program
IR 05000293/202200318 November 2022NRC Inspection Report No. 05000293/2022003High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
IR 05000293/202200212 August 2022NRC Inspection Report No. 05000293/2022002Fire Barrier
Fire Protection Program
IR 05000293/202200111 May 2022NRC Inspection Report No. 05000293/2022001High Radiation Area
Locked High Radiation Area
IR 05000293/20210049 February 2022NRC Inspection Report No. 05000293/2021004Hydrostatic
COVID-19
IR 05000293/202100312 November 2021NRC Inspection Report No. 05000293/2021003Fire Barrier
Hydrostatic
COVID-19
Fire Protection Program
IR 05000293/202100210 August 2021NRC Innspection Report No. 05000293/2021002Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
COVID-19
ML21187A27012 July 2021NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401Coronavirus
IR 05000293/202140212 July 2021Security Decommissioning Inspection Report 05000293/2021402Coronavirus
COVID-19
IR 05000293/202100113 May 2021NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power StationCOVID-19
IR 05000293/202140127 April 2021Security Decommissioning Inspection Report 05000293/2021401Coronavirus
COVID-19
IR 05000293/202000422 February 2021NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, MassachusettsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
COVID-19
IR 05000293/202040117 December 2020Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only)COVID-19
Affidavit
ML20335A00930 November 2020NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, MassachusettsHydrostatic
Locked High Radiation Area
Spent Fuel Pool Instrumentation
COVID-19
Liquid penetrant
Fire Protection Program
IR 05000293/202000230 November 2020NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, MassachusettsHydrostatic
Locked High Radiation Area
Spent Fuel Pool Instrumentation
COVID-19
Liquid penetrant
Fire Protection Program
ML20070P33410 March 2020NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, MassachusettsEarthquake
IR 05000293/19820013 January 2020David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184
IR 05000293/201900224 July 2019Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter
IR 05000293/201900113 May 2019Integrated Inspection Report 05000293/2019001
IR 05000293/20180064 March 2019Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure
IR 05000293/201800413 February 2019Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201Safe Shutdown
Reactor Vessel Water Level
Internal Flooding
Enforcement Discretion
Temporary Modification
Squib
Functionality Assessment
Operability Determination
Fire Protection Program
Downpower
IR 05000293/201801323 January 2019Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013Foreign Material Exclusion
Operability Determination
IR 05000293/20185016 December 2018Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501
IR 05000293/201801521 November 2018Triennial Fire Protection Inspection Report 05000293/2018015Safe Shutdown
Fire Barrier
Hydrostatic
Fire impairment
Multiple Spurious Operation
Emergency Lighting
FLEX
B.5.b
Job Performance Measure
Exemption Request
Fire Protection Program
IR 05000293/201800313 November 2018Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001Safe Shutdown
Ultimate heat sink
Mission time
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
IR 05000293/20180121 November 2018Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012Operability Determination
Power change
IR 05000293/20180119 October 2018Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011Operability Determination
IR 05000293/201841124 September 2018Baseline Security Inspection Report 05000293/2018411Affidavit
IR 05000293/201800528 August 2018Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005)
IR 05000293/201800214 August 2018Integrated Inspection Report 05000293/2018002Time of Discovery
Fitness for Duty
High Radiation Area
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
IR 05000293/201841020 June 2018Baseline Security Inspection Report 05000293/2018410 (Letter Only)Affidavit
IR 05000293/201801013 June 2018Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010Functionality Assessment
Condition Adverse to Quality
Operability Determination
IR 05000293/201800114 May 2018Integrated Inspection Report 05000293/2018001Time to boil
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
IR 05000416/201701412 March 2018Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021Enforcement Discretion
Exemption Request
IR 05000293/201700628 February 2018Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501)Fitness for Duty
IR 05000293/201700414 February 2018Integrated Inspection Report 05000293/2017004Fire Barrier
Internal Flooding
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Siren
Failure to Scram
IR 05000293/20170101 February 2018Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010Functionality Assessment
Operability Determination
IR 05000293/201700921 December 2017Problem Identification and Resolution Inspection Report 05000293/2017009Time of Discovery
Mission time
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Operability Assessment
IR 05000293/201720121 November 2017NRC Security Inspection Report 05000293/2017201Affidavit
IR 05000293/201700314 November 2017Integrated Inspection Report 05000293/2017003Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Large early release frequency
Operability Determination
Downpower
Flow Induced Vibration
Operability Assessment
IR 05000293/201740417 October 2017Material Control and Accounting Program Inspection Report 05000293/2017404 (Letter Only)Affidavit
IR 05000293/201740312 October 2017Baseline Security Inspection Report 05000293/2017403, (Letter Only)Affidavit
IR 05000293/201700728 September 2017Design Bases Assurance Inspection Report 05000293/2017007Safe Shutdown
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Anchor Darling
Significance Determination Process
Large early release frequency
Weak link
IR 05000293/20174055 September 2017Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only)Affidavit
IR 05000293/201700528 August 2017Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005)
IR 05000293/201700214 August 2017Integrated Inspection Report 05000293/2017002Time of Discovery
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Fire Barrier
Water Inventory Control
Internal Flooding
Enforcement Discretion
Temporary Modification
VT-2
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Process Control Program
Operability Determination
License Renewal
Fuel cladding
Fire Watch
Dissimilar Metal Weld
Scaffolding
Power change
Coast down
IR 05000293/20170089 August 2017Final Significance Determination for a Green Finding and Results of Regulatory Conference - Inspection Report 05000293/2017008