Issue date | Title | Topic | |
---|---|---|---|
IR 05000293/2023401 | 31 August 2023 | NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) | Affidavit |
IR 05000293/2023002 | 4 August 2023 | NRC Inspection Report No. 05000293/2023002 | Grab sample Offsite Dose Calculation Manual |
IR 05000293/1957001 | 26 May 2023 | 635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077 | |
IR 05000293/2022004 | 15 February 2023 | NRC Inspection Report No. 05000293/2022004 | High Radiation Area Coatings Fire Protection Program |
IR 05000293/2022003 | 18 November 2022 | NRC Inspection Report No. 05000293/2022003 | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
IR 05000293/2022002 | 12 August 2022 | NRC Inspection Report No. 05000293/2022002 | Fire Barrier Fire Protection Program |
IR 05000293/2022001 | 11 May 2022 | NRC Inspection Report No. 05000293/2022001 | High Radiation Area Locked High Radiation Area |
IR 05000293/2021004 | 9 February 2022 | NRC Inspection Report No. 05000293/2021004 | Hydrostatic COVID-19 |
IR 05000293/2021003 | 12 November 2021 | NRC Inspection Report No. 05000293/2021003 | Fire Barrier Hydrostatic COVID-19 Fire Protection Program |
IR 05000293/2021002 | 10 August 2021 | NRC Innspection Report No. 05000293/2021002 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 |
ML21187A270 | 12 July 2021 | NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401 | Coronavirus |
IR 05000293/2021402 | 12 July 2021 | Security Decommissioning Inspection Report 05000293/2021402 | Coronavirus COVID-19 |
IR 05000293/2021001 | 13 May 2021 | NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station | COVID-19 |
IR 05000293/2021401 | 27 April 2021 | Security Decommissioning Inspection Report 05000293/2021401 | Coronavirus COVID-19 |
IR 05000293/2020004 | 22 February 2021 | NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 |
IR 05000293/2020401 | 17 December 2020 | Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only) | COVID-19 Affidavit |
ML20335A009 | 30 November 2020 | NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Hydrostatic Locked High Radiation Area Spent Fuel Pool Instrumentation COVID-19 Liquid penetrant Fire Protection Program |
IR 05000293/2020002 | 30 November 2020 | NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Hydrostatic Locked High Radiation Area Spent Fuel Pool Instrumentation COVID-19 Liquid penetrant Fire Protection Program |
ML20070P334 | 10 March 2020 | NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Earthquake |
IR 05000293/1982001 | 3 January 2020 | David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 | |
IR 05000293/2019002 | 24 July 2019 | Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter | |
IR 05000293/2019001 | 13 May 2019 | Integrated Inspection Report 05000293/2019001 | |
IR 05000293/2018006 | 4 March 2019 | Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure | |
IR 05000293/2018004 | 13 February 2019 | Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 | Safe Shutdown Reactor Vessel Water Level Internal Flooding Enforcement Discretion Temporary Modification Squib Functionality Assessment Operability Determination Fire Protection Program Downpower |
IR 05000293/2018013 | 23 January 2019 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013 | Foreign Material Exclusion Operability Determination |
IR 05000293/2018501 | 6 December 2018 | Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501 | |
IR 05000293/2018015 | 21 November 2018 | Triennial Fire Protection Inspection Report 05000293/2018015 | Safe Shutdown Fire Barrier Hydrostatic Fire impairment Multiple Spurious Operation Emergency Lighting FLEX B.5.b Job Performance Measure Exemption Request Fire Protection Program |
IR 05000293/2018003 | 13 November 2018 | Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001 | Safe Shutdown Ultimate heat sink Mission time Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000293/2018012 | 1 November 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012 | Operability Determination Power change |
IR 05000293/2018011 | 9 October 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011 | Operability Determination |
IR 05000293/2018411 | 24 September 2018 | Baseline Security Inspection Report 05000293/2018411 | Affidavit |
IR 05000293/2018005 | 28 August 2018 | Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) | |
IR 05000293/2018002 | 14 August 2018 | Integrated Inspection Report 05000293/2018002 | Time of Discovery Fitness for Duty High Radiation Area Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000293/2018410 | 20 June 2018 | Baseline Security Inspection Report 05000293/2018410 (Letter Only) | Affidavit |
IR 05000293/2018010 | 13 June 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010 | Functionality Assessment Condition Adverse to Quality Operability Determination |
IR 05000293/2018001 | 14 May 2018 | Integrated Inspection Report 05000293/2018001 | Time to boil Past operability Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000416/2017014 | 12 March 2018 | Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 | Enforcement Discretion Exemption Request |
IR 05000293/2017006 | 28 February 2018 | Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) | Fitness for Duty |
IR 05000293/2017004 | 14 February 2018 | Integrated Inspection Report 05000293/2017004 | Fire Barrier Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Siren Failure to Scram |
IR 05000293/2017010 | 1 February 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010 | Functionality Assessment Operability Determination |
IR 05000293/2017009 | 21 December 2017 | Problem Identification and Resolution Inspection Report 05000293/2017009 | Time of Discovery Mission time Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Operability Assessment |
IR 05000293/2017201 | 21 November 2017 | NRC Security Inspection Report 05000293/2017201 | Affidavit |
IR 05000293/2017003 | 14 November 2017 | Integrated Inspection Report 05000293/2017003 | Packing leak Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Enforcement Discretion Functionality Assessment Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Large early release frequency Operability Determination Downpower Flow Induced Vibration Operability Assessment |
IR 05000293/2017404 | 17 October 2017 | Material Control and Accounting Program Inspection Report 05000293/2017404 (Letter Only) | Affidavit |
IR 05000293/2017403 | 12 October 2017 | Baseline Security Inspection Report 05000293/2017403, (Letter Only) | Affidavit |
IR 05000293/2017007 | 28 September 2017 | Design Bases Assurance Inspection Report 05000293/2017007 | Safe Shutdown Stroke time Internal Flooding Probabilistic Risk Assessment Anchor Darling Significance Determination Process Large early release frequency Weak link |
IR 05000293/2017405 | 5 September 2017 | Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) | Affidavit |
IR 05000293/2017005 | 28 August 2017 | Quarterly Assessment and Updated Inspection Plan for Pilgrim Nuclear Power Station (Report 05000293/2017005) | |
IR 05000293/2017002 | 14 August 2017 | Integrated Inspection Report 05000293/2017002 | Time of Discovery Reactor Vessel Water Level High Radiation Area Non-Destructive Examination Fire Barrier Water Inventory Control Internal Flooding Enforcement Discretion Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Process Control Program Operability Determination License Renewal Fuel cladding Fire Watch Dissimilar Metal Weld Scaffolding Power change Coast down |
IR 05000293/2017008 | 9 August 2017 | Final Significance Determination for a Green Finding and Results of Regulatory Conference - Inspection Report 05000293/2017008 |