Termination of Reactor Oversight Process for Pilgrim Nuclear Power Station and Commencement of Decommissioning Inspection Program
ML19162A033
Person / Time
Site: Pilgrim
Issue date: 06/11/2019
From: Racquel Powell
Decommissioning Branch I
To: Brian Sullivan
Entergy Nuclear Operations
References
Download: ML19162A033 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 June 11, 2019 Mr. Brian R. Sullivan Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR PILGRIM NUCLEAR POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM

Dear Mr. Sullivan:

This letter is to inform you that oversight activities by the U.S. Nuclear Regulatory Commission (NRC) at the Pilgrim Nuclear Power Station (PNPS) will no longer be performed in accordance with our operating power reactor inspection program. The NRCs oversight of your future activities at PNPS will be conducted in accordance with our decommissioning power reactor inspection program and will be led by our Region I Division of Nuclear Materials Safety (DNMS).

On November 10, 2015, Entergy Nuclear Operations, Inc. (Entergy) notified the NRC of their intent to permanently shut down PNPS (ADAMS Accession Number: ML15328A053). On June 10, 2019, Entergy certified cessation of power operations and the permanent removal of fuel from the PNPS reactor vessel (ADAMS Accession Number: ML19161A033). The NRC will no longer use Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, IMC 0608, Performance Indicator Program, and IMC 2515, Light-Water Reactor Inspection Program when conducting oversight activities and assessing site performance. Therefore, it is also no longer necessary to report Reactor Oversight Process performance indicator data for PNPS. The results of inspection activities completed under IMC 2515 will be provided in future correspondence. Although the inspection program for NRC oversight at your facility has changed, all license commitments remain in effect until altered by formal action from the NRC.

The NRCs oversight of your licensed activities as you progress through decommissioning will be conducted under the provisions in IMC 2561, Decommissioning Power Reactor Inspection Program. The objectives of the decommissioning inspection program are to verify that decommissioning activities are being conducted safely, that spent fuel is safely being stored, and that site operations and license termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.

As defined in IMC 2561, PNPS is currently in the Post-Operation Transition Phase of decommissioning and the inspections as detailed in IMC 2561, Appendix A, Core Inspection Procedures for that phase will be conducted at PNPS. In addition, the inspection procedures listed in IMC 2561, Appendix B, Discretionary Procedures for Decommissioning Power Reactors could be performed based on site activities and conditions.

B. Sullivan 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC wesite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-6967 or Harry Anagnostopoulos, Senior Health Physicist, at (610) 337-5322 with any questions you may have regarding this letter.

Sincerely,

/RA JNick for/

Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Docket No: 05000293 License No: DPR-35 cc w/encl: Distribution via ListServ

B. Sullivan 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC wesite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-6967 or Harry Anagnostopoulos, Senior Health Physicist, at (610) 337-5322 with any questions you may have regarding this letter.

Sincerely,

/RA JNick for/

Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Docket No: 50-293 License No: DPR-35 cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DIRHP\Pilgrim\Pilgrim Transition Letter_DRAFT_10JUN2019.docx ML19162A033 SUNSI Review Complete: After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: C = Copy w/o attach/encl E = Copy w/ attach/encl N = No copy OFFICE DRP/RI DNMS/RI DNMS/RI NAME ADimitriadis/sh for HAnagnostopoulos/ha RPowell/jn for DATE 6/10/19 6/10/19 6/11/19 OFFICIAL RECORD COPY