December 6, 2018
SUBJECT:
PILGRIM NUCLEAR POWER STATION - EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000293/2018501
Dear Mr. Sullivan:
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Pilgrim Nuclear Power Station and the NRC inspectors discussed the results of this inspection with you and members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety
Docket Number: 50-293 License Number: DPR-35
Enclosure:
Inspection Report 05000293/2018501
Inspection Report
Docket Number:
50-293
License Number:
Report Number:
Enterprise Identifier: I-2018-501-0039
Licensee:
Entergy Nuclear Operations, Inc. (Entergy)
Facility:
Pilgrim Nuclear Power Station
Location:
Plymouth, Massachusetts
Inspection Dates:
November 6 - November 8, 2018
Inspectors:
J. Ambrosini, Senior Emergency Preparedness Inspector, Division of
Reactor Safety (DRS)
J. DeBoer, Emergency Preparedness Inspector, DRS
B. Fuller, Senior Operations Engineer, DRS
J. Lilliendahl, Senior Emergency Response Coordinator, DRS
Approved By:
Raymond R. McKinley, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at Pilgrim Nuclear Power Station, by conducting an evaluated emergency preparedness exercise inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or more-than-minor violations were identified.
INSPECTION SCOPES
The inspectors conducted the inspection using the appropriate portions of the inspection procedures in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors determined the following samples were complete when the inspection procedure requirements were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation (1 sample)
The inspectors evaluated the adequacy of Entergys conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14).
71114.08 - Exercise Evaluation - Scenario Review (1 sample)
The inspectors reviewed and evaluated the proposed scenario for a biennial emergency plan exercise on October 4.
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below for the period from October 2017 through September 2018.
- (1) Drill and Exercise Performance
- (2) Emergency Response Organization Drill Participation
- (3) Alert and Notification System
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On November 8, the inspectors presented the inspection results to Mr. Brian Sullivan, Site Vice President, and other members of the Pilgrim staff.
DOCUMENTS REVIEWED
71114.01 - Exercise Evaluation
Pilgrim Emergency Preparedness Plan
Pilgrim Emergency Preparedness Plan Implementing Procedures
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim Drill Reports 2016-2018
Condition Reports
CR-PNP-2018-05075
CR-PNP-2018-05327
CR-PNP-2018-08850
CR-PNP-2018-08867
CR-PNP-2018-08876
71114.08 - Exercise Evaluation - Scenario Review
Pilgrim Emergency Preparedness Plan
Pilgrim Emergency Preparedness Plan Implementing Procedures
Pilgrim November 7, 2018 Evaluated Exercise Scenario Package
Pilgrim Drill Reports 2016-2018
71151 - Performance Indicator Verification
DEP PI data, October 2017 - September 2018
ERO Drill Participation PI data, October 2017 - September 2018