EPID:L-2019-LLE-0006, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (Approved, Closed) |
|
MONTHYEARCNRO-2018-00031, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E2018-07-0303 July 2018 Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E Project stage: Request ML19056A1922019-02-18018 February 2019 Attachment 2: Calculation No. PNPS-EC-81416-M1418, Adiabatic Heatup Analysis for Drained Spent Fuel Pool Project stage: Request ML19088A1272019-03-25025 March 2019 (PNPS) - Request for Exemption from 10 CFR 140.11 (a)(4) Project stage: Request ML19088A0502019-03-25025 March 2019 (PNPS) - Request for Exemption from Portions of 10 CFR 50.54(w)(1) Project stage: Request ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance Project stage: Acceptance Review ML19161A0332019-06-10010 June 2019 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel Project stage: Request 05000293/LER-2019-003, Condition Prohibited by Technical Specifications Involving the Mechanical Vacuum Pump2019-06-10010 June 2019 Condition Prohibited by Technical Specifications Involving the Mechanical Vacuum Pump Project stage: Request ML19211B5092019-07-30030 July 2019 Supplement to Requests for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance and from 10 CFR 140.11(a)(4), Concerning Primary and Secondary Liability Insurance Project stage: Supplement ML18347A7172019-08-0909 August 2019 SECY-19-0078: Request by Entergy Nuclear Operations, Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station Project stage: Request ML19281D7422020-01-0606 January 2020 Exemption from the Requirements of 10 CFR 50.54(w)(1)Concerning Onsite Property Damage Insurance Project stage: Approval ML19281D7402020-01-0606 January 2020 Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance Project stage: Approval ML19281D7432020-01-0909 January 2020 FRN, Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance Project stage: Approval 2019-06-10
[Table View] |
Text
~ Entergy.
2.19.035 June 10, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President 1 OCFR50.82(a)(1)
SUBJECT:
Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel Pilgrim Nuclear Power Station NRG Docket No. 50-293 Renewed Facility Operating License No. DPR-35 In accordance with Title 1 O Code of Federal Regulations (CFR) 50.82(a)(1 )(i), Entergy hereby certifies to the NRG that power operations ceased at Pilgrim Nuclear Power Station (PNPS) on May 31, 2019. Per 1 O CFR 50.82(a)(1 )(ii), Entergy also certifies that the fuel was permanently removed from the PNPS reactor vessel and placed in the spent fuel pool on June 9, 2019.
Entergy understands and acknowledges that upon docketing these certifications, the PNPS 1 O CFR Part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel.
Should you have any questions regarding this submittal, please contact Mr. Peter J. Miner at (508) 830-7127.
This letter contains no new regulatory commitments.
I declare under penalty of perjury, the foregoing is true and correct. Executed on June 10, 2019.
Sincerely, Brian R. Sullivan BRS/rjm
2.19.035 Page 2 of 2 cc: NRC Region I, Regional Administrator NRC Senior Resident Inspector - Pilgrim NRC NRR Project Manager - Pilgrim Planning and Preparedness Section Chief - Massachusetts Emergency Management Agency Director - Massachusetts Department of Public Health