IR 05000293/2018012

From kanterella
Jump to navigation Jump to search
Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012
ML18305A834
Person / Time
Site: Pilgrim
Issue date: 11/01/2018
From: Anthony Dimitriadis
NRC/RGN-I/DRP/PB5
To: Brian Sullivan
Entergy Nuclear Operations
Dimitriadis A
References
EA-17-086 IR 2018012
Download: ML18305A834 (20)


Text

November 1, 2018

SUBJECT:

PILGRIM NUCLEAR POWER STATION - CONFIRMATORY ACTION LETTER (EA-17-086) FOLLOW-UP INSPECTION REPORT 05000293/2018012

Dear Mr. Sullivan:

On September 14, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site team inspection at Pilgrim Nuclear Power Station (PNPS). The NRC inspectors discussed the results of this inspection with you and other members of your staff during an onsite debrief on September 14, 2018, and via teleconference exit on October 17, 2018. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed PNPSs progress in implementing the actions from the PNPS Recovery Plan that were committed to in the Confirmatory Action Letter (CAL) dated August 2, 2017 (NRCs Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17214A088) (EA-17-086). Specifically, for this inspection the team reviewed the adequacy of the corrective actions PNPS completed to address 45 individual CAL items in the Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management Area Action Plans. The team also reviewed site performance to determine whether the actions completed for these plans, in aggregate, achieved the safety performance improvement objectives stated in the PNPS Recovery Plan for those seven Area Action Plans.

Finally, the team conducted a targeted site safety culture assessment to properly assess individual CAL items with actions tied to safety culture and gather preliminary information for the final CAL follow-up inspection.

The team determined that all 45 individual CAL items reviewed and the 7 associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and the Area Action Plans for Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management are closed.

No findings or violations of NRC requirements were identified during this inspection. In accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, PNPS will remain within the Multiple/Repetitive Degraded Cornerstone column of the NRCs Reactor Oversight Process Action Matrix pending completion of all actions needed to close the CAL. To review the remaining CAL actions and Area Action Plans, the NRC currently plans to complete one additional quarterly CAL follow-up inspection in addition to the four already completed. The NRC staff will assess the effectiveness of Entergys implementation of these corrective actions and evaluate whether the safety performance of PNPS has demonstrated sustained improvement warranting transition of PNPS out of Column 4 in accordance with Inspection Manual Chapter 0305, Section 10.02d, paragraph 7. The final on-site CAL follow-up inspection is currently scheduled to be completed in December 2018, and the report documenting the results of that inspection to be issued shortly thereafter.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket No. 50-293 License No. DPR-35

Enclosure:

Inspection Report 05000293/2018012 w/Attachment: Confirmatory Action Letter Item Status

Inspection Report

Docket Number:

50-293

License Number:

DPR-35

Report Number:

05000293/2018012

Enterprise Identifier: I-2018-012-0014

Licensee:

Entergy Nuclear Operations, Inc. (Entergy)

Facility:

Pilgrim Nuclear Power Station (PNPS)

Location:

Plymouth, MA

Inspection Dates:

09/10/2018 - 09/14/2018

Team Lead:

S. Rutenkroger, PhD, Senior Resident Inspector

Inspectors:

L. Cline Jr., Senior Project Engineer

Z. Hollcraft, Senior Resident Inspector

J. Krafty, Senior Resident Inspector

M. Keefe-Forsyth, Human Factors Specialist

S. Morrow, Human Factors Engineer

J. Dolecki, Resident Inspector

M. Hardgrove, Project Engineer

C. Roettgen, Resident Inspector

C. Safouri, Project Engineer

Approved By:

Anthony Dimitriadis, Chief

Reactor Projects Branch 5

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at PNPS by conducting the fourth confirmatory action letter (CAL) follow-up inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

The team reviewed 45 of the 156 items that Entergy committed to complete in the PNPS CAL (EA-17-086). The items reviewed were associated with the Corrective Action Program (CAP),

Operations Standards and Site Leadership (OPS), Risk Recognition and Decision Making (RRDM), Procedure Quality (PQ), Engineering Programs (EP), Equipment Reliability (ER), and Work Management (WM) Area Action Plans. The team determined that all 45 individual CAL items reviewed and the associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and these 7 Area Action Plans are closed.

No findings or more-than-minor violations were identified.

Additional Tracking Items

Type Issue number Title Report Section Status CAL

EA-17-086 PNPS Confirmatory Action letter Inspection Results 92702 Discussed

INSPECTION SCOPES

This inspection was conducted using the appropriate portions of the applicable inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the NRC website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Entergys performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT, AND ABNORMAL

92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders

The inspectors reviewed the status of the corrective actions that Entergy had reported complete for 45 of the 156 items listed on Enclosure 2 of the PNPS CAL (EA-17-086)

(ADAMS Accession No. ML17214A088). The inspectors also conducted a targeted safety culture assessment to review the current status of PNPS corrective actions intended to improve site safety culture in these areas.

All 45 items reviewed for this inspection are identified in the Confirmatory Action Letter Item Status summary table included as an Attachment to this report. The inspectors also reviewed the status of the Area Action Plans associated with these 45 items, which in accordance with Enclosure 2 of the PNPS CAL included the CAP, OPS, RRDM, PQ, EP, ER, and WM Area Action Plans. Entergy had reported these seven Area Action Plans were complete and effective.

The inspectors evaluated these items to determine if:

(1) CAL item corrective actions were completed in a timely manner consistent with their safety significance.
(2) Area Action Plans were effective at addressing the performance issues identified in the CAL.
(3) CAL performance metrics were appropriate and accurate.
(4) Closure of each CAL item and Area Action Plan was completed in accordance with established PNPS procedural guidance.
(5) PNPS corrected NRC-identified problems in PNPS implementation of actions taken for PQ-1.1 and PQ-5.2 (see NRC Inspection Report (IR) 05000293/2017010 (ADAMS Accession No. ML18032A463)), and the adverse impact of these problems on the effectiveness of the PQ Area Action Plan.
(6) PNPS safety culture actions to date had caused a sustained positive change in safety culture, specifically related to the CAP (see NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and RRDM Area Action Plans.

During this review, the inspectors completed the following specific activities:

(1) Reviewed Entergys closure packages for each of the CAL action items.
(2) Reviewed Entergys closure reports for each of the Area Action Plans.
(3) Reviewed Entergys interim and final effectiveness reviews and self-assessments completed for the Area Action Plans.
(4) Reviewed Entergys performance indicators and recovery metrics for the Area Action Plans through August 2018.
(5) Overall, conducted 72 individual interviews, 8 focus group panel discussions, and multiple as-needed follow-up discussions with 117 PNPS staff, supervisors, managers, and directors from Plant Operations, Engineering, Maintenance, Production, Training, Security, Human Resources, Regulatory and Performance Improvement, Chemistry, Radiation Protection, and Recovery (including contract personnel such as Subject Matter Experts and Mentors in operations, corrective actions, and risk decision making).
(6) Reviewed Organizational Health Index survey results, Nuclear Safety Culture Leadership Team and Monitoring Panel meeting minutes, Nuclear Safety Culture Advocate reports, and CAP subject matter expert assessment reports from 2016 through 2018.
(7) Performed numerous walk-downs and independent field observations of the conduct of operations, in-progress training, and maintenance planning.
(8) Observed site meetings associated with engineering reviews, work planning (multiple T-weeks), and daily/weekly production.
(9) Reviewed procedures, procedure change requests and revisions, training presentations, case study presentations, training attendance records, critical decision making documents, what it looks like (WILL) sheets, backlog status reports, self-assessments, operating crew training performance and feedback records, final written and simulator examinations, operating crew event critiques, individual targeted performance improvement plans, coaching feedback records, work planning man-hour estimates, timesheets, critical and non-critical corrective and deficient backlog records, critical preventive maintenance deferred (and/or in grace) records, single-point and aging vulnerability assessments and records, and work orders.

INSPECTION RESULTS

Observation 92702 CAL Items Closed The team closed all of the following 45 CAL items (a narrative description of each item is listed in Enclosure 1 to the PNPS CAL (ADAMS Accession No. ML17214A088):

Corrective Action Program (CAP) - 1.3 and 1.8

Operations Standards and Site Leadership (OPS) - 1.1, 1.2, 1.4, 1.6, 1.7, 2.2, 3.1, 3.2, 4.1, 4.2, and 5.3

Risk Recognition and Decision Making (RRDM) - 1.1, 1.2, 1.3, 2.1, 3.1, 3.2, 3.3, 4.8, and 4.9

Procedure Quality (PQ) - 1.1 and 5.2

Engineering Programs (EP) - 1.2, 2.1, 2.2, 2.3, 2.4, 3.1, and 4.1

Equipment Reliability (ER) - 1.3, 2.1, 2.2, 3.1, 3.2, and 3.3

Work Management (WM) - 1.1, 1.2, 1.3, 2.1, 2.2, 3.1, 3.3, and 4.2

CAL Area Action Plan Summary Review The inspectors concluded that the individual CAL items described above and the associated Area Action Plans were adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

Therefore, the following Area Action Plans listed in Enclosure 2 to the PNPS CAL are closed based on the reviews completed during this inspection:

Operations Standards and Site Leadership (OPS)

Risk Recognition and Decision Making (RRDM)

Engineering Programs (EP)

Equipment Reliability (ER)

Work Management (WM)

Actions associated with the PQ and CAP Area Action Plans were reviewed during previous inspections and these Area Action Plans were held open because additional action and review was required as documented in NRC IR 05000293/2017010 (ADAMS Accession No.

ML18032A463) and NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039).

The basis for closure for these two Area Action Plans, considering the problems described in these resports, is described below:

PQ Area Action Plan:

The inspectors determined that PNPSs WILL sheet revisions, PQ training presentation, and extent of condition corrective actions adequately corrected the problems the inspectors previously identified with PNPS implementation of PQ-1.1 and PQ-5.2 per NRC IR 05000293/2017010. Combined with the adequate completion of the other PQ Area Action Plan CAL items per NRC IR 05000293/2017010, the inspectors concluded that the PQ Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

CAP Area Action Plan:

The inspectors concluded that based on the adequate completion of the CAP Area Action Plan CAL items documented in NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and the results of safety culture assessment activities conducted during the onsite week of this inspection (described below), the CAP Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

Targeted Safety Culture Assessment The inspectors conducted interviews and focus groups with 72 staff, first line supervisors, and managers, which represented about 14% of the workforce. The eight focus groups conducted were representative of the major departments at PNPS, including maintenance, operations, security, and engineering. The focus group discussions and interviews conducted as part of the scope of this inspection focused on the traits of a positive safety culture, with emphasis on leadership safety values and actions, problem identification and resolution, decision making, and work processes. Insights were also gathered by reviewing various subject matter expert reports, contractor-conducted surveys, and PNPS nuclear safety culture monitoring panel meeting minutes.

During the focus groups, PNPS staff indicated work management process changes had improved interdepartmental coordination and communication and had increased the recognition of the risk impact of planned work activities; while CAP changes had improved feedback to staff who initiate condition reports, increased the focus on taking timely action to correct safety concerns, and increased accountability at all levels of the organization for completing corrective actions.

The results of the focus group discussions indicated that most PNPS staff believe management places an appropriate level of emphasis on safety and makes conservative decisions that appropriately consider risk. PNPS staff also stated that they feel free to raise safety concerns without fear of retaliation and believe management would support stopping work to resolve safety concerns.

Based on the targeted scope of this assessment and the employee perceptions communicated during the interviews and focus groups, the inspectors noted a marked improvement in safety culture since the previous round of focus groups and interviews conducted in February 2017 and confirmed a sustained positive change in safety culture.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On September 14, 2018, the inspectors presented a debrief of the CAL follow-up inspection results to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.

On October 17, 2018, inspectors conducted a telephonic exit meeting and presented the final results for the CAL follow-up inspection items documented in this report to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.

DOCUMENTS REVIEWED

CAL Item Closure Packages

CAP-1.3

CAP-1.8

OPS-1.1

OPS-1.2

OPS-1.4

OPS-1.6

OPS-1.7

OPS-2.2

OPS-3.1

OPS-3.2

OPS-4.1

OPS-4.2

OPS-5.3

RRDM-1.1

RRDM-1.2

RRDM-1.3

RRDM-2.1

RRDM-3.1

RRDM-3.2

RRDM-3.3

RRDM-4.8

RRDM-4.9

PQ-1.1

PQ-5.2

EP-1.2

EP-2.1

EP-2.2

EP-2.3

EP-2.4

EP-3.1

EP-4.1

ER-1.3

ER-2.1

ER-2.2

ER-3.1

ER-3.2

ER-3.3

WM-1.1

WM-1.2

WM-1.3

WM-2.1

WM-2.2

WM-3.1

WM-3.3

WM-4.2

Procedures

1.13.2, Vendor and Technical Information Review, Revision 1

1.3.142, Critical Decision Process, Revision 7

1.3.142, Critical Decision Process, Revision 8

1.3.142, PNPS Risk Review and Disposition, Revision 6

1.3.145, PNPS Recovery Procedure, Revision 3

1.3.145, PNPS Recovery Procedure, Revision 4

1.3.145, PNPS Recovery Procedure, Revision 5

1.3.34, Operations Administration Policies and Processes, Revision 162

1.4.80, PNPS Monthly Performance Review Meeting, Revision 0

2.1.14, Station Power Changes, Revision 120

3.M.3-47, Load Shed Relay Operational/Functional Test - Critical Maintenance, Revision 94

3.M.3-47.1, "A" Train Functional Test of Individual Load Shed Components - Critical

Maintenance, Revision 41

3.M.3-47.2, "B" Train Functional Test of Individual Load Shed Components - Critical

Maintenance, Revision 38

3.M.3-61.3, Emergency Diesel Generator Quarterly Preventative Maintenance - Critical

Maintenance, Revision 32

3.M.4-14.2, Salt Service Water Pumps: Routine Maintenance, Revision 69

3.M.4-9, Inspection of the Drywell and Suppression Chamber, Revision 22

8.5.2.13, RHR Keepfill Valve Leak Test, Revision 8

8.9.8.4, 125 Vdc Station 650 Primary Battery Acceptance, Performance, or Service Test -

Critical Maintenance, Revision 13

8.C.40, Seasonal Weather Surveillance, Revision 38

8.C.40, Seasonal Weather Surviellance, Revision 42

8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System "Q" Instrument Calibration

and Functional Test, Revision 15

8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System Q Instrument Calibration

and Functional Test, Revision 15

8.F.38.1, Diesel Generator Instrumentation Calibration and Functional Test - Critical

Maintenance, Revision 47

8.I.11.3, Residual Heat Removal A Loop Valve Cold Shutdown Operability, Revision 10

8.M.2-2.10.12, HPCI High Water Trip Logic, Revision 22

8.M.2-2.10.8.6, Diesel Generator B Initiation by Loss of Offsite Power Logic - Critical

Maintenance, Revision 53

EN-DC-329, Engineering Programs Control and Oversight, Revision 6

EN-DC-351, Inservice Inspection Program, Revision 3

EN-FAP-DC-003, Fleet Engineering Morning Call, Revision 16

EN-FAP-OM-016, Performance Management Processes and Practices, Revision 9

EN-FAP-OM-021, Critical Decision Procedure, Revision 6

EN-FAP-OM-023, Entergy Nuclear Change Management, Revision 7

EN-FAP-WM-002, Critical Evolutions, Revision 5

EN-FAP-WM-011, Work Planning Standard, Revision 4

EN-OP-115, Conduct of Operations, Revision 25

EN-OP-116, Infrequently Performed Tests or Evolutions, Revision 14

EN-OP-117, Operations Assessment Resources, Revision 14

EN-WM-100, Work Request (WR) Generation, Screening and Classification, Revision 14

EN-WM-101, Online Work Management Process, Revision 16

EN-WM-104, On Line Risk Assessment, Revision 18

Audits/Self Assessments/Surveillances

CR-PNP-2016-09147 CA09, Project Plan for: Preventive Maintenance Program Improvements,

Revision 1, 6/2017

CR-PNP-2016-2054 CA-88, Final Effectiveness Review of Decision Making / Risk Recogntion

for July 2017 to April 2018, 05/18

LO-PNPLO-2016-00039 CA-01, Pre-NRC Preventive Maintenance Program Implementation

Self-Assessment, 12/16/2016

LO-PNPLO-2016-0031, Perform Assessment of Core Business Expectations Execution,

6/16/2016

LO-PNPLO-2016-0093,Snapshot Assessment Core Business Staffing, Man Hours, 9/28/2016

LO-PNPLO-2018-0035, Focused Self-Assessment - Pre-NRC / Engineering Programs AAP

LO-PNPLO-PNP-2016-00002 CA-21, Decision Making / Risk Recognition Fundamental

Problem Area, CR-PNP-2016-2054 Effectiveness Review for January 2017 to July 2017,

8/25/17

Pilgrim Periodic Maintenance Effectiveness Assessment, A Requirement of 10CFR50.65 (a)(3),

Operating Cycle 21

Pre-NRC / Risk Recognition & Decision-Making (RRDM) AAP Self-Assessment Report, 7/16/18

Condition Reports

CR-PNP-2014-01990

CR-PNP-2016-02054

CR-PNP-2016-02056

CR-PNP-2016-02057

CR-PNP-2016-02061

CR-PNP-2016-07115

CR-PNP-2016-07486

CR-PNP-2016-08957

CR-PNP-2016-09147

CR-PNP-2016-09805

CR-PNP-2016-09844

CR-PNP-2016-10130

CR-PNP-2016-10148

CR-PNP-2017-00403

CR-PNP-2017-02785

CR-PNP-2017-05075

CR-PNP-2017-05861

CR-PNP-2017-09271

CR-PNP-2017-11505

CR-PNP-2017-11506

CR-PNP-2017-11989

CR-PNP-2017-12124*

CR-PNP-2017-12160

CR-PNP-2017-12166

CR-PNP-2017-12188

CR-PNP-2017-12193

CR-PNP-2017-12194

CR-PNP-2017-12212

CR-PNP-2017-12230

CR-PNP-2017-12299

CR-PNP-2018-00800

CR-PNP-2018-01734

CR-PNP-2018-02195

CR-PNP-2018-03017

CR-PNP-2018-03230

CR-PNP-2018-03392

CR-PNP-2018-03531

CR-PNP-2018-03711

CR-PNP-2018-03881*

CR-PNP-2018-03943*

CR-PNP-2018-04204

CR-PNP-2018-04234

CR-PNP-2018-05156

CR-PNP-2018-05401

CR-PNP-2018-05752

CR-PNP-2018-05887

CR-PNP-2018-05893

CR-PNP-2018-06160

CR-PNP-2018-06216

CR-PNP-2018-06309

CR-PNP-2018-06922

CR-PNP-2018-06964

CR-PNP-2018-06998

CR-PNP-2018-07211*

CR-PNP-2018-07234*

CR-PNP-2018-07245*

CR-PNP-2018-07257*

CR-PNP-2018-07262*

CR-PNP-2018-07262*

CR-PNP-2018-07266*

CR-PNP-2018-07271*

CR-PNP-2018-07286*

CR-PNP-2018-07299*

CR-PNP-2018-07305*

CR-PNP-2018-07311*

CR-PNP-2018-07314*

CR-PNP-2018-07337*

CR-PNP-2018-07339*

CR-PNP-2018-07340*

CR-PNP-2018-07428*

CR-PNP-2018-07493*

Work Orders

00013084

00092887

259360

286314

00313485

00313485

00329669

00329669

00403797

00403797

00412785

00427869

00443044

00443925

00448923

00459539

00461042

00466738

00466738

00467103

00467210

00468499

00468499

00471446

00473476

00474060

00475406

00475817

00475818

00475836

00477494

00479744

00479744

00484413

00485527

00490635

00490636

00490727

00490730

00490732

00490733

00490734

00491994

00491994

00496992

00497735

00504777

00507282

51531885

2374132

2580453

2649098

2649105

2653058

2653058

2662931

2662931

2664405

2676925

2696125

2696125

2696239

2696239

2711773

2790888

2800356

2814878

Miscellaneous

2016 General Supervisor Training Plan

2017 General Supervisor Training Plan

2018 General Supervisor Training Plan

Backlog Estimate Spreadsheet and Estimate Scope Summary Sheet

Comprehensive Recovery Plan (CRP) Equipment Reliability Area Action Plan Closure Report,

8/10/2018

CR-PNP-2016-2061, Supervisor Workload Analysis Time Estimates for Recurring and Non-

Recurring Tasks, 9/29/2016

EC-73073, Marotta Scientific Controls Pressure Reducer Valves, Revision 3

EC-72119, Evaluation of Acceptability of Level Selector Switch 640-302

Entergy 3/16/2017 Fleet Memo, 3/16/2017

Entergy Employee Handbook Achieving and Sustaining Excellence, 4/2018

GBM22591, ABB Induced Voltage Test April 2017 Entergy Three Phase Transformer, Revision 1

GSU Transformer Test Report, 5/2015 and 4/2017

INPO 15-011, Principles for Excellence in Integrated Risk Management, Revision 0

LO-PNPLO-2015-0020

LO-PNPLO-2015-0097

LO-PNPLO-2016-0002

LO-PNPLO-2017-0009

LO-PNPLO-2018-0034

LO-PNPLO-2018-0034

LO-PNPLO-2018-0049

Maintenance Backlog Performance Indicator May 2017 through August 2018

Mentor Report of 01/15/18 to 02/15/18

Mentor Report of 02/16/18 to 03/31/18

Mentor Report of 04/01/18 to 05/15/18

Mentor Report of 05/16/18 to 06/30/18

Mentor Report of 09/24/16

Mentor Report of 10/7/16

Mentor Report of 11/30/16

Mentor Report of April 2017

Mentor Report of July 2017

Mentor Report of May 2017

Observation Database, March through August 2018

OFM Meeting Observation 05/30/17

One-on-One Spreadsheets, January through July 2018

PCBT-ADM-PROCTECHREV2018, Procedure Quality Technical Review

PDCR 81-38, HPCI/RCIC Self-Contained Type Pressure Regulating Valves, 10/14/1981

Performance indicators for Scope Survival, Schedule Completion, and Critical Preventive

Maintenance September 2017 through August 2018

Pilgrim NSP Organization Chart, 9/12/2016

Pilgrim Nuclear Power Plant Work Order Backlog, 8/28/2018

Pilgrim Nuclear Power Station Comprehensive Recovery Plan, Revision 0

Pilgrim Nuclear Safety Culture Performance Improvement Risk Recognition, Decision Making

and Corrective Action Program, 9/9/2018

PLP-ESPP-RISK2016, PNP 1.3.142 Risk Review & Disposition, Revision 1

PLP-SUPC-DECISION RISK, Risk Recognition and Decision Making Leadership Training

(2017) and Instructor Documents

PM 50079951, 8.C.40 (Sec 8.1) Cold Weather Surv, 2017

PM 50079953, 8.C.40 (Sec 8.3) Warm Weather Surv, 2017

PNP-ENG-All, Email, Engineering Document NE16-007, Assignment of Corrective Actions,

6/13/2016

PNPS 95003 Recovery Metrics, 7/2018

Procedure Quality Briefing Sheet, December 19, 2017, CR-2017, 21117, CA 6

Q2-2017, Program Health Report, Pilgrim Nuclear Station, AOV (KPI) - Air Operated Valve

Program

Q2-2017, Program Health Report, Pilgrim Nuclear Station, APP-J (KPI) - Containment Leakage

Rate and Testing Program (Appendix J)

Q2-2017, Program Health Report, Pilgrim Nuclear Station, FAC - Flow Accelerated Corrosion

Program

Q2-2017, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Inspection Program

(ASME Section XI)

Q2-2017, Program Health Report, Pilgrim Nuclear Station, MOV (KPI) - Motor Operated Valve

Program

Q2-2018, Program Health Report, Pilgrim Nuclear Station, EQ (KPI) - Equipment Qualification

Program

Q2-2018, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Testing Program

Q4-2017, Program Health Report, Pilgrim Nuclear Station, BPT (KPI) - Buried Piping and Tank

Program

Risk to generation work orders week of 2/26/2018

Roster of Entergy Maintenance technicians 10/2017 and 9/2018

Scope Survival, Scope Completion, Critical PMs deferred, late, and in second half of grace,

January through August 2018

SEP-ISI-PNPS-002, PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan,

Revision 5

SES-2010-09, Simulator Scenario, Revision 4

SES-2014-03, Simulator Scenario, Revision 3

Supply and Demand Model for Maintenance Technicians, 2016 through 2018

SUT CCVT PM Evaluation, September 13, 2018

Targeted Performance Improvement Plans for 14 Managers and Supervisors

Technical Conscience Mentor Weekly Summary Report, Week Ending 2/2/2018

Technical Conscience Mentor Weekly Summary Report, Week Ending 2/9/2018

Technical Conscience Mentor Weekly Summary Report, Week Ending 8/11/2017

Technical Conscience Mentor Weekly Summary Report, Week Ending 8/4/2017

Template for 0705 Engineering Manager Meeting Agenda

Timesheets for contract technicians for the week of August 13, 2018

WT-WTPNP-2016-0207

Confirmatory Action Letter Item Status

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

Nuclear Safety Culture

NSC-1.1

Nuclear Safety Culture

NSC-1.2

Nuclear Safety Culture

NSC-1.3

Nuclear Safety Culture

NSC-1.4

Nuclear Safety Culture

NSC-1.5

Nuclear Safety Culture

NSC-1.6

Nuclear Safety Culture

NSC-1.7

Nuclear Safety Culture

NSC-1.8

Nuclear Safety Culture

NSC-1.10

Nuclear Safety Culture

NSC-2.2

Nuclear Safety Culture

NSC-2.3

Nuclear Safety Culture

NSC-3.1

Nuclear Safety Culture

NSC-3.2

Nuclear Safety Culture

NSC-3.3

Nuclear Safety Culture

NSC-3.4

Nuclear Safety Culture

NSC-3.5

Nuclear Safety Culture

NSC-3.6

Nuclear Safety Culture

NSC-3.7

Nuclear Safety Culture

NSC-3.8

Nuclear Safety Culture

NSC-4.1

Nuclear Safety Culture

NSC-4.2

Nuclear Safety Culture

NSC-5.1

Nuclear Safety Culture

NSC-5.2

Nuclear Safety Culture

NSC-5.3

Nuclear Safety Culture

NSC-5.4

Nuclear Safety Culture

NSC-6.1

Nuclear Safety Culture

NSC-7.1

Nuclear Safety Culture

NSC-8.1

Nuclear Safety Culture

NSC-8.6

Nuclear Safety Culture

NSC-8.8

Nuclear Safety Culture

NSC-8.9

Nuclear Safety Culture

NSC-8.10

Nuclear Safety Culture

NSC-8.21

Nuclear Safety Culture

NSC-8.22

Nuclear Safety Culture

NSC-8.25

Nuclear Safety Culture

NSC-8.26

Nuclear Safety Culture

NSC-8.27

Nuclear Safety Culture

NSC-8.28

Nuclear Safety Culture

NSC-8.29

Corrective Action Program

CAP-1.1

05000293/2017010

Y

Corrective Action Program

CAP-1.2

05000293/2018011

Y

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

Corrective Action Program

CAP-1.3

Reviewed - 05000293/2018011

And 05000293/2018012

Y

Corrective Action Program

CAP-1.4

05000293/2018011

Y

Corrective Action Program

CAP-1.5

05000293/2018011

Y

Corrective Action Program

CAP-1.7

05000293/2018011

Y

Corrective Action Program

CAP-1.8

Reviewed - 05000293/2018011

And 05000293/2018012

Y

Corrective Action Program

CAP-1.9

05000293/2018011

Y

Corrective Action Program

CAP-1.10

05000293/2018011

Y

Corrective Action Program

CAP-1.11

05000293/2018011

Y

Corrective Action Program

CAP-2.1

05000293/2018011

Y

Corrective Action Program

CAP-2.2

05000293/2018011

Y

Corrective Action Program

CAP-2.3

05000293/2018011

Y

Corrective Action Program

CAP-3.1

05000293/2018011

Y

Corrective Action Program

CAP-3.2

05000293/2018011

Y

Corrective Action Program

CAP-4.2

05000293/2018011

Y

Corrective Action Program

CAP-4.3

05000293/2018011

Y

Procedure Use and

Adherence

PUA-1.1

05000293/2017010

Y

Procedure Use and

Adherence

PUA-1.2

05000293/2017010

Y

Procedure Use and

Adherence

PUA-1.3

05000293/2017010

Y

Procedure Use and

Adherence

PUA-1.4

05000293/2017010

Y

Procedure Use and

Adherence

PUA-1.6

05000293/2018011

Y

Procedure Use and

Adherence

PUA-2.2

05000293/2018011

Y

Procedure Use and

Adherence

PUA-2.3

05000293/2018011

Y

Procedure Use and

Adherence

PUA-2.4

05000293/2018011

Y

Procedure Use and

Adherence

PUA-2.5

05000293/2018011

Y

Procedure Use and

Adherence

PUA-3.1

05000293/2018011

Y

Procedure Use and

Adherence

PUA-3.2

05000293/2018011

Y

Procedure Use and

Adherence

PUA-3.3

05000293/2018011

Y

Procedure Use and

Adherence

PUA-3.4

05000293/2018011

Y

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

Procedure Use and

Adherence

PUA-4.1

05000293/2018011

Y

Procedure Use and

Adherence

PUA-4.2

Reviewed - 05000293/2018011

N

Procedure Use and

Adherence

PUA-4.3

05000293/2018011

Y

Procedure Use and

Adherence

PUA-5.1

05000293/2018011

Y

Procedure Use and

Adherence

PUA-5.2

05000293/2018011

Y

Procedure Use and

Adherence

PUA-5.7

05000293/2018011

Y

Procedure Use and

Adherence

PUA-5.8

05000293/2018011

Y

Procedure Use and

Adherence

PUA-5.9

05000293/2018011

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.1

05000293/2017010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.2

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.3

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.4

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.5

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

1.6

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

2.2

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

3.1

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.1

05000293/2018010

Y

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

Operability Determinations

and Functionality

Assessments

ODFA-

5.2

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.3

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.4

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.5

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.6

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.7

05000293/2018010

Y

Operability Determinations

and Functionality

Assessments

ODFA-

5.8

05000293/2018010

Y

Operations Department

Standards and Leadership

OPS-1.1

05000293/2018012

Y

Operations Department

Standards and Leadership

OPS-1.2

05000293/2018012

Y

Operations Department

Standards and Leadership

OPS-1.4

05000293/2018012

Y

Operations Department

Standards and Leadership

OPS-1.6

05000293/2018012

Y

Operations Department

Standards and Leadership

OPS-1.7

05000293/2018012

Y

Operations Department

Standards and Leadership

OPS-2.2

05000293/2018012

Y

100

Operations Department

Standards and Leadership

OPS-3.1

05000293/2018012

Y

101

Operations Department

Standards and Leadership

OPS-3.2

05000293/2018012

Y

2

Operations Department

Standards and Leadership

OPS-4.1

05000293/2018012

Y

103

Operations Department

Standards and Leadership

OPS-4.2

05000293/2018012

Y

104

Risk Recognition and

Decision Making

RRDM-

1.1

05000293/2018012

Y

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

105

Risk Recognition and

Decision Making

RRDM-

1.2

05000293/2018012

Y

106

Risk Recognition and

Decision Making

RRDM-

1.3

05000293/2018012

Y

107

Risk Recognition and

Decision Making

RRDM-

2.1

05000293/2018012

Y

108

Risk Recognition and

Decision Making

RRDM-

3.1

05000293/2018012

Y

109

Risk Recognition and

Decision Making

RRDM-

3.2

05000293/2018012

Y

110

Risk Recognition and

Decision Making

RRDM-

3.3

05000293/2018012

Y

111

Risk Recognition and

Decision Making

RRDM-

4.3

05000293/2018012

Y

2

Risk Recognition and

Decision Making

RRDM-

4.8

05000293/2018012

Y

113

Risk Recognition and

Decision Making

RRDM-

4.9

05000293/2018012

Y

114

Procedure Quality

PQ-1.1

Reviewed - 05000293/2017010

And 05000293/2018012

Y

115

Procedure Quality

PQ-2.1

05000293/2017010

Y

116

Procedure Quality

PQ-2.2

05000293/2017010

Y

117

Procedure Quality

PQ-3.1

05000293/2017010

Y

118

Procedure Quality

PQ-3.2

05000293/2017010

Y

119

Procedure Quality

PQ-3.3

05000293/2017010

Y

20

Procedure Quality

PQ-5.1

05000293/2017010

Y

21

Procedure Quality

PQ-5.2

Reviewed - 05000293/2017010

And 05000293/2018012

Y

2

SRV White Finding

SRV-1.1

05000293/2018010

Y

23

SRV White Finding

SRV-1.2

05000293/2018010

Y

24

SRV White Finding

SRV-1.3

05000293/2017010

Y

25

SRV White Finding

SRV-2.1

05000293/2017010

Y

26

SRV White Finding

SRV-3.1

05000293/2018010

Y

27

SRV White Finding

SRV-3.2

05000293/2018010

Y

28

SRV White Finding

SRV-3.3

05000293/2018010

Y

29

SRV White Finding

SRV-3.4

05000293/2018010

Y

130

SRV White Finding

SRV-4.1

05000293/2018010

Y

131

SRV White Finding

SRV-5.1

05000293/2018010

Y

2

SRV White Finding

SRV-5.2

05000293/2018010

Y

133

Engineering Programs

EP-1.1

05000293/2017010

Y

134

Engineering Programs

EP-1.2

05000293/2018012

Y

135

Engineering Programs

EP-2.1

05000293/2018012

Y

136

Engineering Programs

EP-2.2

05000293/2018012

Y

137

Engineering Programs

EP-2.3

05000293/2018012

Y

Line

Item

Area Action Plan

CAL Item

Inspection Report Number

Closed

138

Engineering Programs

EP-2.4

05000293/2018012

Y

139

Engineering Programs

EP-3.1

05000293/2018012

Y

140

Engineering Programs

EP-4.1

05000293/2018012

Y

141

Equipment Reliability

ER-1.1

05000293/2017010

Y

2

Equipment Reliability

ER-1.2

05000293/2017010

Y

143

Equipment Reliability

ER-1.3

05000293/2018012

Y

144

Equipment Reliability

ER-2.1

05000293/2018012

Y

145

Equipment Reliability

ER-2.2

05000293/2018012

Y

146

Equipment Reliability

ER-3.1

05000293/2018012

Y

147

Equipment Reliability

ER-3.2

05000293/2018012

Y

148

Equipment Reliability

ER-3.3

05000293/2018012

Y

149

Work Management

WM-1.1

05000293/2018012

Y

150

Work Management

WM-1.2

05000293/2018012

Y

151

Work Management

WM-1.3

05000293/2018012

Y

2

Work Management

WM-2.1

05000293/2018012

Y

153

Work Management

WM-2.2

05000293/2018012

Y

154

Work Management

WM-3.1

05000293/2018012

Y

155

Work Management

WM-3.3

05000293/2018012

Y

156

Work Management

WM-4.2

05000293/2018012

Y