Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20140B1671997-06-0303 June 1997 Proposed Tech Specs,Modifying Action Requirements for TS 3/4.3.2 for SI Sys Sump Recirculation Actuation Signal ML20148G6631997-06-0303 June 1997 Proposed Tech Specs,Requesting Minimum Required Level in Condensate Storage Pool Be Increased from 82% to 91% to Account for Vortexing & Instrumentation Measurement Uncertainties ML20141K1741997-05-24024 May 1997 Proposed Tech Specs 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1, Removing Cycle Dependent Boron Concentration ML20141K1951997-05-24024 May 1997 Proposed Tech Specs 3/4.7.4 Modifying Ultimate Heat Sink, Table 3.7-3,by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20140H0831997-05-0606 May 1997 Proposed Tech Specs Modifying Wording of SR 4.5.2.j by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water ML20140C8881997-04-17017 April 1997 Proposed Tech Specs,Replacing Attachment to Waterford 3 Submittal W3F1-97-0067,dtd 970407,correcting Oversight ML20137T4051997-04-11011 April 1997 Proposed Tech Specs,Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4541997-04-11011 April 1997 Proposed Tech Specs Making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04
[Table view] |
Text
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ ._
INSTRUMENTATION .
I FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 As a minimum, the fire detection instrumentation for each fire detec-tion zone shown in Table 3.3-11 shall be OPERABLE.
APPLICA8ILITY: Whenexer equipment protected by the fire detection instrument is required to be OP'.RA8tf.
ACTION: 4.
- a. With av, but not more than one-half the total in any fire zone Functio A fire detection instruments shown in Table 3.3-11 inoperable I except-h the annulus, restore the inoperable instrument (s) to OPER-A8LE status within 14 days or within the next I hour establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per hour at the locations listed in Specification 4.6.1.5.
- b. With more than one-half of the Function A fire detection instruments in av fire zone shown in Table 3.3-11 inoperable except M the annulus, or with any Function 8 fire detection instruments shown in Table 3.3-11 inoperable, or with any two or more adjacent fire detec-tion instruments shown in Table 3.3-11 inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (s) with the inoper-able instrument (s) at least once per hour, unless the instrument (s) is located fr. side the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per ku j
- c. With1=g*h=ag == o gc s,Hste,pgJy,gf),
' ===^^~ak cation 4.6.1.5.
e ia the :: 6 0, restore at least 1 .
Me4a- sene to operable status or within the next I hour establish a fire watch patrol to inspect the zone at least once per eight hours.*
- d. The provisions of Specification 3.0.3 and 3.0.4 are not applicable. j ;
SURVEILLANCE REQUIREMENTS ,
l 4.3.3.8.1 Each of the above required fire detection instruments. which are I accessible during plant operation shall be demonstrated OPERA 8LE at least once per 6 months by perfomance of a CHANNEL FUNCTIONAL TEST. Fire detectors which are not accessible during plant operation shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST.during each COLD SHUT 00WN I exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.
4.3.3.8.2 The NFPA Standard 720 supervised circuits supervision associated with the detector alarms of each of the above required fire detection instruments which are accessible during plant operation shall be demonstrated OPERA 8LE at least once per 6 months. Circuits which are not accessible during plant opera-tion shall be demonstrated OPERA 8LE during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.
" Fire watch patrol may be temporarily suspended during performance of Specification 4.6.6.1.a. -
-se0 N 0Y I 87i35 -2 3/4 3-49 AMENDMENT NO. 15 ADOCK 0500 gDR _
9 INSTRUMENTATION FIRE DETECTION INSTRUMENTATION I SURVE!LLANCE REQUIREMENTS (Continued)
{
4.3.3.8.3 The nonsupervised circuits associated with detector alarms bet'veen I i
the instrument and the control room shall be demonstrated OPERA 8LE at least once per 31 days. '
4.3.3.8.4 Each of the resistor wires required by Table 3.3-11 shall be -
demonstrated OPERA 8LE at least once per 6 months by verifying the proper wire resistance.
i 9
e
, 'dATERFORD - UNIT 3 3/4 3 50 . .
TABLE 3.3-11(Continued)
FIRE DETECTION INSTRUMENTS TOTAL NUMBER OF INSTRUMENTS
- ELEVATION HEAT FLAME SMOKE ZONE ROOM NAME/ NUMBER (ft) .(x(y), [x/y) (x/y) i _ t'e s pa aNakb IV4 ,_
A0l Pd'11 A$M1 N/ \f \/NE'Ji\ X\M%
RCB 2 Electrical Penetration prea A +21 24/0 RCB 3 Electrical Penetration A-ea B +21 21/0 RCB 4 Reactor Cable Trays +46 16/0 CT 1&3 Wet & Dry Cooling Tower "A" Cable Tray 1/0 CT 2&4 Wet & Ory Cooling Tower "B" Cable Tray 1/0
- 3. FUEL HANDLING BUILDING FHB 2 Purification Pump Room /8155, Fuel Pool +1 10/0 Pump "A"/8157, Fuel Pool' Pump "B"/ ,
B156, Fuel Pool Heater Exchanger /
B158 and Access Area /*~ el Emergency Filter Train b...t/8152 +1 6/0 Emergency Elect. Equip. Room /8151 +1 1/0
, FHB 4 Operating Floor /361 . +46 15/0
- 4. CHARC0AL AIR FILTER UNITS E-35 (3A-SA) FfB Emergency Filter Train "A" +1 1/0 E-35 (3B-SB) FHB' Emergency Filter Train "B" +1 1/0 E-17 (3A-SA) Shield Building Ventilation
+46 1/0 l Systes Filter Train "A" E-17 (3B-58) Shield Building Ventilation +46 1/0 l Systes Filter Train "B" l E-23 (3A-SA) Cor. trolled Ventilation Area
+46 1/0 System Filter Train "A" E-23 (3A-SB) Controlled Ventilation Area +46 1/0 System Filter Train "B" )
S-8 (3A-SA) Control Room Emergency Filter +46 1/0 Train "A" S-B (33-58) Control Room Emergency Filter +46 1/0 Train "B" TABLE NOTATIONS
- (x/y): x is the number of Function A (early warning fire detection and notification only) instruments, y is the number of Function 8 (actuation of fire suppression systems and early warning and notification) instruments.
- The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests.
snt W 'A
+w}is
+tecw~ tklzw n ,+- - - '
g,, .
- - - FfRE DETECTION IN57RUMENTS 70TAL NUMBEli CF INSTRUMFNT5" ELEVAi!0N HEAT FLAME SMOKE ZONE ROOM NAME/ NUMBER (ft) gfyj, @'g
. 1. REACTOR AUXILIARY 8UILDING (Continued)
RA8 25 Equip. Access Area /226 (wing area) +21 15/0 RA8 27A H&V Room /124 +7 0/6 RA8 278 Electrical Area and Health Physics +7 0/35 offices /122 RA8 27C I&C Room /120 +7 0/6 RA8 270 Cossunications Equip. Room /133 +7 }/0 RA8 31 Corridors and Passageways 4 0/24 Corridors oc eastside - -4 0/21 RA8 32 Wing Area westside - Auxiliary Coe- -35 32/0 ponent Cocling Water Pump "A"/853 &
- and Pipe Penetration Aras/8100 -4 Wing Area Center /853 and 8100 -35 & 28/0
-4 Wing Aree 'eastside-Cemponent Cooling -35 31/0 Water Puso *8"/853 and Pipe .
Penetration Area /8100 :4 RA8 33 5/0 Cooling Heat Exchangers A&8/820 -35 0/18
& 848 RA8 34 Valve Operating Erelosure 8ay Roca -15.5 2/0 "A"/854 Valve operating Enclosure Bay Room -15.5 4/0 "B" B55A RA8 35 Safety Injection Pump Roos 8/816 -35 10/0 RAB 36 Safe ty Injection Pump Roos A/815 -35 10/0 RA6 37 Motor-criven Emergency Feedpump -35 0/1 "A"/849A RA8 38 Motor-Driven Emergency Feedpump -35 1/0 "8"/8498 -
RA8 39 General, Equipment Area /85, 12, 13.- -35 0/10
& 49 Corr.idors & Ceneral Equip. Areas /85, -35 0/28 1, 2, 3, 4, 39, 40, 41, 42, 44 & 46 East Corridor & General Equip. Areas / -35 0/15 817, 23 & 25 8A Make-up Tank "A"/838 -35 4/0 8A Make-up 7ank "8"/853A -35 4/0 RA8 40 Ofesel Storage Tank "A"/850 -35 3/0 RA8 41 Olesel Storage Tank "8"/852 -35 3/0 WATERFORO - UNIT 3 3/4 3-52 Amendment No. 3
FfRE DETECTf0N INSTRUMENTS TOTAL NUMBER OF
_ INSTRuetENTS*
1.
E ZONE,, ROOM NMIE/ NUMBER ELEVATION
_ (ft) _ @ @E g HEAT FLAM SMOKE REACTOR AUXILIARY 8UILDING -
RAS 1A Main Control Pans 1s 1,2,3,4,6,7,,8,35,36 +46 l
RAB 1A Control Room Proper /J04 10/0
+45 20/0 RAB 18 Emergency Equip. H&V Room /314 +46 0/12 RAB 1D Computer Room (above raised floor)/306 +46 Computer Room (bolow raised floor)/306 +46 5/0.
RAB 2 Ventilation Equip. Rooe/299 0/ 7'
+46 0/36 RAB 3 RA8 Corridor to Relay Room /.261 +35 0/1(3) 4/0 RAB HVAC Switchgear Equip, Room /323 +46 RAB 3A RAB Battery Exhaust Fan Room /406 0/10
+69 0/2 RA8 4 Cable Yault/260 RAS 5 +35 0/2?
RAB 6 Electrical Penetration Area "A"/263 +35 0/13 RA8 7 Electrical Penetration Area "B"/263A +35 0/14 Relay Rooa/262 Isolation Panels (9 Compartments
+35 (3) 12/0
+35 2/0
- 2 per comp. ) .
RAB 8A High Voltage Switchgear Roos "A"/212A RAB 88 +21 0/1(1) 13/0 Electrical Equip. Room /2258 and High +21 0/1(2) 28/0 Voltage Switchgear Roos "8"/212 480V Switchgear 3A32 Room RAB BC High Voltage Switchgear Room
+21 (2) 2/0 "A-8"/2128
+21 (1) 8/0 RAB BE CEA M/G Set Room /216 +21 2/0 RAB 9 Remote Shutdown Panel Room /217 +21 1/0 RAB 11 Battery Roos "8"/213 +21 RAB 12 Battery Room "A8"/214A 2/0
+21 2/0 RAB 13 Battery Room "A"/214 -
+21 RAB 15 (mergency Diesel Gen. "B" Room /222 2/0 RAB 15A Emergency Olesel Gen. "B" Feed TK
+21 0/1 Room /328A *
+46 0/1 l RAB 16 Emergancy Ofesel Gen. "A" Room /221 RAB 16A. Emergency Olesel Gen. "A" Feed Tk.
+21 0/1
, Room 328A ,
+46 0/1 RAB 17 CCW Heat Exchanger "B"/236 +21 0/4 RAS 16 CCW heat Exchanger "A"/220 +21 0/4 RAB 19 CCW Pump "A"/235
+21 0/2 l RAS 20 CCW Pump "AB"/234
+21 0/2 RAB 21 CCW Pump "B"/233
+21 1/0 RAB 23 Corridor to CCW Pumps /218, Ccrridor +21 0/39 l to CCW Heat Exchangers/219 and Corridor to Emergency Ofesel l Gen./22bn (1) Common Resistor Wire l
' (2)Comeon Resistor Wire (3) Common Resistor Wire .
WATERFORD - UWIT 3 3/4 3-51 AMEN 0 MENT NO. 15,24
_ - - _ _ _ _ _ - - - _ - _ - - - - - - - - - - - -