Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20155J4961988-10-19019 October 1988 Forwards Order Terminating License R-127,per 861110 Request. Amend 4 to Indenmity Agreement E-59,SER & Environ Assessment Also Encl IR 05000538/19880011988-08-0909 August 1988 Discusses Verification Survey Results as Suppl to Insp Rept 50-538/88-01 Re Termination of License R-127.Based on Radiological Surveys Facilities & Equipment Contamination Less than Limit & Exposure Measurements Less than Limit ML20151R9701988-07-29029 July 1988 Forwards Insp Rept 50-538/88-01 on 880623-24.No Violations or Deviations Noted ML20207B9161988-07-26026 July 1988 Forwards Corrected Page 4 of to G Kuzo,Correcting Error in Table of Smearable Surface Contamination ML20148G4481988-03-24024 March 1988 Submits Request for Verification of Final Survey & Issuance of Order to Terminate License R-127 Per 880126 Order. Certificate of Calibration Encl ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20234F3531988-01-0606 January 1988 Lists Necessary Steps & Precautions Planned for Disassembly & Release of AGN-201 Reactor,Per 871221 Request ML20234F3881988-01-0505 January 1988 Informs of Awareness of NRC Requirements Re Possession & Assembly & Disposition of Component Parts of Reactor. Certification of Listed Items Under Oath Included ML20237D8271987-12-21021 December 1987 Forwards Request for Addl Info Re 861110 Application to Dismantle Facility & Dispose of Component Parts.Response Requested within 30 Days of Ltr Date ML20237K8561987-08-21021 August 1987 Forwards Tech Specs for Ludlum Model 3 Geiger Counters & Model 42-4,43-5 & 44-9 Detectors for Further Clarification of 870522 Response to NRC .B Leonard Will Be Representing Institute for Resource Mgt.Resume Encl ML20215A6761987-06-11011 June 1987 Informs of Name Change Due to NRR Reorganization & Appointment of a Adams as Facility Project Manager ML20214L1201987-05-22022 May 1987 Responds to 870422 Questions Re Licensee Decommissioning Plan.Diagram of Facility Organization for Decommissioning Provided.Rr Riley Resume & Radiation Control & Safety Manual Encl ML20213A6441987-04-22022 April 1987 Forwards Request for Addl Info Re Decommissioning Plan Supporting Application for Authorization to Decommission Facility.Response Requested within 30 Days ML20211C7001987-02-0606 February 1987 Forwards Fr Notice of Proposed Decommissioning of Memphis State Univ Reactor,Per 861112 Supplemented Application ML20207M9491987-01-0505 January 1987 Forwards Legible Pages of Request for Decommissioning Reactor ML20214C3701986-11-12012 November 1986 Forwards Request for Termination Survey,Application for Decommissioning & Decommissioning Plan.Qa Plan for Shipment of Reactor Fuel Will Be Sent to C Macdonald,Transportation Certification Branch,As Soon as Possible ML20214C4011986-11-10010 November 1986 Forwards Request for NRC Termination Survey of AGN-201, License R-127.Reactor Placed in Safstor Status & Awaits Final Removal by Inst for Resource Mgt After NRC & EPA Approval of Reactor Possession ML20214C4351986-11-10010 November 1986 Requests Decommissioning of AGN-201,License R-127.Fuel Removed & Placed in Safstor Status.Electrical Connections Between Reactor & Control Panel Disconnected & Drive Rod Assemblies & Core Tank Removed,Surveyed & Stored ML20154R3731986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20127J1861985-06-17017 June 1985 Forwards Amend 5 to License R-127 & Safety Evaluation. Amend Authorizes Possession,But Not Operation,Of Nuclear Reactor Located at Memphis State Univ in Memphis,Tn ML20099L1551985-03-15015 March 1985 Forwards Application for Amend to License R-127,authorizing possession-only in Safstor Status.Approval of Request Will Assure Protective Storage of Reactor & Reactor Fuel While Plans for Decommissioning Finalized ML20099H8411985-03-15015 March 1985 Forwards Upgraded Physical Security Plan Supporting Proposed Amend to License R-127,authorizing Safstor Status for Reactor & Reactor Fuel.Plan Withheld (Ref 10CFR73.21) ML20113F9691985-01-18018 January 1985 Requests Extension Until 850301 to Implement Revised Emergency Plan ML17298A6041983-08-0505 August 1983 FOIA Request for Agency Records Relevant to &/Or Generated in Connection W/Nrc Investigations,Insp or Repts on Allegations Made by R Gunderson & W Royce Re Facilities ML20080T5021983-07-14014 July 1983 Requests Review of NRC Serious Mishandling of Investigation of Worker Allegations Re Deficiencies in Electrical Work & Startup Testing Program at Facilities,On Behalf of R Gunderson & W Royce.Related Matl Encl ML20077H1131983-07-13013 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-538/83-01.Corrective Actions:Proper Planning & Priorities for Emergency Plan Audits Will Be Discussed W/Reactor Safety Committee at Future Meetings ML17298A4271983-06-23023 June 1983 Submits Required Data to Demonstrate That Line Voltage Regulators Perform as Acceptable Isolation Device by Limiting Primary Current Under Short Circuit Conditions to full-load Primary Current,Per SER (NUREG-0857) ML20069B0801983-03-0909 March 1983 Forwards Nuclear Reactor Operations Annual Rept for 1982 ML20028A1631982-10-26026 October 1982 Forwards Public Version of Revised Preliminary Draft Emergency Plan ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML19312A5641982-05-14014 May 1982 Provides Clarification to Amend 1 to License R-127 Re Resolution of Operating Conditions.Amend Authorizes Licensee to Operate Reactor at steady-state Power Levels ML20051L6581982-05-0505 May 1982 Forwards Annual Rept of Nuclear Reactor Operations. ML20010B6111981-05-27027 May 1981 Forwards Endorsement 6 to Nelia Policy NF-251 & Amend 2 to Indemnity Agreement E-59,per 800924 Request ML20003G0391981-04-20020 April 1981 Forwards Revised Page 25 to Physical Security Plan for SNM of Low Strategic Significance.Plan Withheld (Ref 10CFR2.790) ML19352A2801981-04-0303 April 1981 Forwards Revised Pages 13 & 14 for Physical Security Plan. Encls Withheld (Ref 10CFR2.790) ML19350C1461981-03-27027 March 1981 Forwards Ctr for Nuclear Studies,Memphis State Univ,1980 Annual Rept,Nuclear Reactor Operations. ML19321B1621980-07-23023 July 1980 Forwards Physical Security Plan for SNM of Low Strategic Significance.Plan Withheld (Ref 10CFR2.790) ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19296D1591980-02-0505 February 1980 Forwards 1979 Annual Rept of Nuclear Reactor Operations. ML19211A9101979-12-14014 December 1979 Forwards Executed Amend 3 to Indemnity Agreement E-59 Defining in Course of Transportation. ML19290B7371979-11-26026 November 1979 Forwards Followup Rept to RO-79-3 ML19249B4321979-08-28028 August 1979 Corrects Typographical Errors & Omissions in Application for Amend 1 to License R-127 Submitted in 790803 Ltr ML19248D3741979-08-0303 August 1979 Forwards Amend 1 to License R-127 ML19282C6191979-03-23023 March 1979 Requests Amend to License R-127 to Allow Power Operation at 20 Watt Levels Continuously & 1,000 Watt Levels Intermittantly ML19273B3461979-03-13013 March 1979 Forwards Followup Rept to Reportable Event on 790305 ML19276E8791979-01-29029 January 1979 Submits Followup Rept to Occurrence at AGN-201 Reactor Facility on 790125 Per Section 6.9.2 of App a to License R-127.Electrical Power Outage Occurred During Reactor Operation.Svc Restored in 3-h ML19259B2761978-12-22022 December 1978 DD Ebert Has Satisfactorily Completed 781218-21 Program in AGN-201 Reactor Operations Training.Recommends Individual for Operator License 1991-06-18
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARIR 05000538/19880011988-08-0909 August 1988 Discusses Verification Survey Results as Suppl to Insp Rept 50-538/88-01 Re Termination of License R-127.Based on Radiological Surveys Facilities & Equipment Contamination Less than Limit & Exposure Measurements Less than Limit ML20151R9701988-07-29029 July 1988 Forwards Insp Rept 50-538/88-01 on 880623-24.No Violations or Deviations Noted ML20237D8271987-12-21021 December 1987 Forwards Request for Addl Info Re 861110 Application to Dismantle Facility & Dispose of Component Parts.Response Requested within 30 Days of Ltr Date ML20215A6761987-06-11011 June 1987 Informs of Name Change Due to NRR Reorganization & Appointment of a Adams as Facility Project Manager ML20213A6441987-04-22022 April 1987 Forwards Request for Addl Info Re Decommissioning Plan Supporting Application for Authorization to Decommission Facility.Response Requested within 30 Days ML20211C7001987-02-0606 February 1987 Forwards Fr Notice of Proposed Decommissioning of Memphis State Univ Reactor,Per 861112 Supplemented Application ML20154R3731986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20127J1861985-06-17017 June 1985 Forwards Amend 5 to License R-127 & Safety Evaluation. Amend Authorizes Possession,But Not Operation,Of Nuclear Reactor Located at Memphis State Univ in Memphis,Tn ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl 1988-08-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20155J4961988-10-19019 October 1988 Forwards Order Terminating License R-127,per 861110 Request. Amend 4 to Indenmity Agreement E-59,SER & Environ Assessment Also Encl IR 05000538/19880011988-08-0909 August 1988 Discusses Verification Survey Results as Suppl to Insp Rept 50-538/88-01 Re Termination of License R-127.Based on Radiological Surveys Facilities & Equipment Contamination Less than Limit & Exposure Measurements Less than Limit ML20151R9701988-07-29029 July 1988 Forwards Insp Rept 50-538/88-01 on 880623-24.No Violations or Deviations Noted ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20237D8271987-12-21021 December 1987 Forwards Request for Addl Info Re 861110 Application to Dismantle Facility & Dispose of Component Parts.Response Requested within 30 Days of Ltr Date ML20215A6761987-06-11011 June 1987 Informs of Name Change Due to NRR Reorganization & Appointment of a Adams as Facility Project Manager ML20213A6441987-04-22022 April 1987 Forwards Request for Addl Info Re Decommissioning Plan Supporting Application for Authorization to Decommission Facility.Response Requested within 30 Days ML20211C7001987-02-0606 February 1987 Forwards Fr Notice of Proposed Decommissioning of Memphis State Univ Reactor,Per 861112 Supplemented Application ML20154R3731986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20127J1861985-06-17017 June 1985 Forwards Amend 5 to License R-127 & Safety Evaluation. Amend Authorizes Possession,But Not Operation,Of Nuclear Reactor Located at Memphis State Univ in Memphis,Tn ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility 1989-06-08
[Table view] |
Text
, _ - _ . - - _ . _ _- -- . _. - -. ..
April 22, 1987 Docket No. 50-538 Mr. Robert R. Riley. Jr.
Radiation Safety Officer ,
- Memphis State University '
j Safety Services l Pemphis Tennessee 30152
Dear Mr. Riley:
SUBJECT:
NRC REVIEW OF MEMPHIS STATE UNIVERSITY RESEARCH REACTOR DECOMMISSIONING PLAN We are continuing our review of the Decommissioning Plan that has been ,
submitted in support of your application for authorization to decommission your research reactor. During our review of your Decomissioning Plan, several questions have arisen for which we require answers. You are requested to document responses to the enclosed questions within 30 days of the date of this letter. Following receipt of the infonnation we will complete our evaluation of your plans for decommissioning. If you have questions regarding this review. Please contact ene at (301) 492-8707.
l Sincerely, l original signed by Alexander Adams, Jr. Project Manager Standardization and Non Power Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects Office of Nuclear Reactor Regulation Enclosuret
- i As stated cc: See next page D 'S"R DilTION:
50C1104 FHe.
Local PDR i NRC PDR PDSNP Reading EHylton l AAdams HBerkow PD PDSNP8/ PD 'J EH on AAdams:cw HB r w l 04/ 07 04/JI/87 04/>>/87
$[0 hob l8 l P
- - . - . - . . - - _ . - . - - - - - . . ~ . - . . _ , _ - - - - . . - - - - . _. .
p Mo m'*,
i e t ' 's UNITED STATES
=
l NUCLEAR REGUL ATORY COMMISSION
,,,,,,) WASHING TON, D. C. 205$5 APR 221997 ocket No. 50-538 Mr. Robert R. Riley, Jr.
Radiation Safety Officer M:mphis State University Safety Services M mphis, Tennessee 38152
@ ear Mr. Riley:
O SS 0 N LA S STATE UNIVERSITY RESEARCH REACTOR ubmitted ur research reactor. in support of your application as been for authorization pveral questions have arisen for which ecomission we require answersDuring ou bisdocument letter. responses to the enclosed questions .
You are re,withi quested aluation ofFollowingyour plansreceipt of the infonnationp ewe for decomissioning. e ourwill com l tn 30 days of the dat is review, please contact me at (301) 492 8207If you have questions regarding Sincerely, h6 'Lch- <
Alexander Adams, Standardfration and Non-Powerr . Project Manager Reactor Project Ofrectorate Division of Reactor Y and Special Projects Projects !!!, IV.
losure: Office of Nuclear Reactor Regulation
)tated See next page
o UNITED STATES g
g NUCLEAR REGULATORY COMMISSION
-l WASHINGTON. D. C. 20555
%...../ APR 2 81987 Docket No. 50-538 Mr. Robert R. Riley, Jr.
Radiation Safety Officer Memphis State University Safety Services Memphis, Tennessee 38152
Dear Mr. Riley:
SUBJECT:
NRC REVIEW 0F MEMPHIS STATE UNIVERSITY RESEARCH REACTOR DECOMMISSIONING PLAN
)
1 We are continuing our review of the Decomissioning Plan that has been 1 submitted in support of your application for authorization to decomission your research reactor. During our review of your Decomissioning Plan, i several questions have arisen for which we require answers. You are requested 1 to document responses to the enclosed questions within 30 days of the date of '
this letter. Following receipt of the information we will complete our !
evaluation of your plans for decomissioning. If you have questions regarding this review, please contact me at (301) 492-8207.
Sincerely, hkbc{L ,
Alexander Adams, r , Project Manager Standardization amf Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page
Memphis State University Docket No. 50-538 cc: Mayor of the City of Mcmphis City Hall - Poom 700 I?5 North Main Memphis, Tenressee 38103 Tennessee Department of Public Health ATTN: Director, Bureau of Environmental Health Services Cordell Hull Building Nashville, Tennessee 37219 Mr. Richard Dietz Center for Nuclear Studies Memphis State University Memphis, Tennessee 38152 ,
Attorney General Supreme Court Building Nashville, Tennessee 37219 Ms. Kathryn Hookanson Legal Counsel Memphis State University Memphis, Tennessee 38152 O
l l
l l
- ~'
EflCLOSURE MEMPHIS STATE UNIVERSJTY-QUESTIONS FOR DECOMMISSIONING A ;
- 1. Please provide a diagram that depicts the facility organization for decom-missioning. Show the interface between the Institute for Resource Management (IRM) and Memphis State University (MSU).
- 2. Please provide background information on IRM and MSU decommissioning staff by submitting resumes.
- 3. Please discuss the management policies and features of the organizational structure that will ensure that all operations will be carried out under the cc:1 cept of ALARA (As Low As Is Reasonably Achievable).
- 4. Please describe your industrial safety and hygiene program. What provi-sions have been made for response to industrial accidents?
- 5. What is the present status of your fuel?
- 6. Please provide the history of the reactor, if any, before it was placed into operation at MSU.
- 7. Please submit for review your proposed Technical Specifications for decom-missioning.
- 8. Please submit for review an Environmental Report that describes the envi-ronmental effects of the decommissioning process. Identify any potential offsite environmental problems that could arise from the dismantling project and describe the means employed to prevent any unacceptable offsite releases.
- 9. After dismantlement, where will the reactor be stored until the license is terminated?
- 10. Estimate the occupational exposure that will be received by personnel in the process of dismantling the reactor.
- 11. Indicate how direct and accurate measurements of surface contamination (in CPM) will be made and converted to DPM/100 square cm. Identify those instru-ments to be used which are sensitive enough to measure in the micro-R/ hour range.
MEMPHIS STATE UNIVERSITY-QUESTIONS FOR DECOMMISSIONING l
- 12. Describe how inaccessible areas (pipes, ducts, drains) will be surveyed for contamination.
- 13. Indicate the contamination limits which will be employed when disposing of equipment as radioactive waste. Verify that you will comply with the criteria of Regulatory Guide 1.86 as a minimum.
- 14. Indicate the quantity of solid waste which will be generated and where it will be disposed. Describe the means to be utilized for treating liquid effluents, if any are generated.
- 15. If the defueled reactor is to be released for unrestricted use, please provide the procedures that will be followed to in'sure that the internal and external reactor components meet the criteria of Regulatory Guide 1.86 and the limit of 5 micro-R/ hour or 10 mrem / year above background at 1 meter from the surface.
- 16. Please provide your plan for the survey that will submitted to the NRC to support termination of the license.
i i