ML17298A427

From kanterella
Jump to navigation Jump to search
Submits Required Data to Demonstrate That Line Voltage Regulators Perform as Acceptable Isolation Device by Limiting Primary Current Under Short Circuit Conditions to full-load Primary Current,Per SER (NUREG-0857)
ML17298A427
Person / Time
Site: Palo Verde, 05000538  Arizona Public Service icon.png
Issue date: 06/23/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-24155-JTB, NUDOCS 8306280317
Download: ML17298A427 (4)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBA 8306280317 DOC DATE: 83/06/23 NOTARIZED: NO DOCKET Unit ii Arizona Publi

~

FACIE.'.STN-50-528 Palo Verdi Nuclear Stations 05600528 SThl-5'0-529 Palo Verde Nuclear Station~ Unit 2i Arizona Publi 05000529 STN"50"530 Palo lerde Nuclear Stations Unit 3i Arizona Publi 05000530 AUTH ~ AAMK tIUTHUR AFFILIATE,ON VAN BRUNTik,ED Arizona Public Service Co ~

'EClp NAMk RECIPIENT AFFILIATION KNl'GHTONj G e Licensing Branch 3

SUBJECT:

Submits required data to demonstrate that line vol-tage regulators perform as acceptable iso lation device by limiting pr imary current under short cii cuit condi.tions to full-load primary cur rentgpet SER (N URKG 0857) ~

DISTRIBUTloN cooK~ Bools COPIES RECEIVED:LTR l ENCL Q SIZE:. I TITLE: Licensing Submittal: PSAR/FSAR Amdts -8, Aelqted Correspondence NOTES:Standardized plant+ 05000528 Standardized plant, 05000529 Standardized plant+ 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME O'TTR ENC IO COOK/NAME LTTR. ENC NRA/DL/ADL 1 NRR LB3 BC 1 NRA LB3 LA 1 LICITRArE ~ 01 1 INTERNALe ELD/HDS3 1 IE FILE 1 IEPDEPKR/EPB 36 3 IE/DEPER/IRB 35 1 fE/DEQA/QAB 21 NRR/DE/AEAB NRR/DE/CEB il 1 1 NRR/DE/EHEB NRR/DE/GB 28 1

1 NRR/DE/EQB 13 2 2 NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1 NRR/DE/SAB 24 1 NRR/DF/SGEB 25 1 NRA/DHFS/HFEB40 1 NRR/QHFS/LQB 32 1 NRA/DHFS/PSRB 1 NRR/DL/SSPB 1 NRA/DSI/AE8 26 NAR/DSI/ASB 1 NRA/OSI/CPB 10 NRR/DSI/CSB 09 1 NRA/OSI/ICSB 16 1 NRR/DSI/METB 12 1 NRA/DS I/PSB 19 i B 22 1

'3 NRR/DSI/RSB 23 REG ILE 04 1 RGA5 R AML/MIB 1 EXTERNAL'CRS 41 BNL(AMOTS ONLY)

DM~/DS$ (AMDTS) FEMA"REf'IV S9

(.POR HRC'-PDR 02, HSiC 05 NTIS

.TOTAL NUMBER OF COPIES REQUIRED LTTR 53 ENCL

II <<

Nn>>k>> 9>>>>>>. >I '1 N

r", >>> ~NNy'u II rn'N y>>

I I I >>>> 1 N N I tt J<<N I

,I ) C >><< ,)P N ~ ~

IIPI q 4 I N il),'1 N,<1 f l llrl 'tt t Nj lt >>1 jjC l>>'I C P NP l >> j 1>>N

.~r>>>> > 1>CS lz ' IP C'>P <PN 1%C P jj>>y

~ II'N,l i P " >PN<< "3 1' I <<n (j$ jj ttny tj> 1I)J "PPL) I'1 I ht Inn n ll ~ (jt P,(l,, f Nl P

)' '1't P >>II N.r f )Pj'>>~ Nl

$ I J),'s 1)

Pl('t nl n n ll il !I

(>>

p I

Arizona Public Service Company P.O. BOX 21666 ~ PHOENIX. ARIZONA 65036 June 23, 1983 ANPP-24 155 JTB/MLR Director of Nuclear Reactor Regulation Attention: Mr. George Knighton, Chief Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 k

Subject:

Palo Verde Nuclear Generating Station (PVNGS Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 File: 83-056-026; G.l.01.10

Reference:

NUREG-0857, "Safety Evaluation Report", related to the operation of Palo Verde Nuclear Generating Station Units 1, 2 and 3, dated November, 1981.

Dear Mr. Knighton:

In accordance with our commitment of Section 8.4.2 (paragraph 5) of the referenced document, we are supplying the data required to demonstrate that the line voltage regulators perform as an acceptable isolation device by limiting the primary current under short circuit conditions on the secondary side to full load primary current.

The line voltage regulators are rated at 75 amps and 480 volts on the primary with 209 amps and 120 volts on the secondary. The tested line voltage regulator with a bolted short on the secondary, has a recorded primary current of 54.9 amps which was significantly less than the rated primary.

Additional tests also demonstrated its ability to maintain the rated voltage output with a degraded input voltage down to 77.5%. At 75% of rated input, the secondary voltage was maintained at 96.7% of rated.

If we can be of further assistance, please contact us.

Very truly ours 8306280317 830623 E. E. Van Brunt, Jr.

PDR ADOCK 05000538 APS Vice President E PDR Nuclear Projects Management ANPP Project Director EEVB/MLR/sp cc: E. A. Licitra 0 A. C. Gehr (A@

'l l p I