ML19259B276
| ML19259B276 | |
| Person / Time | |
|---|---|
| Site: | 05000538 |
| Issue date: | 12/22/1978 |
| From: | David Jones MEMPHIS STATE UNIV., MEMPHIS, TN |
| To: | Holman J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901240018 | |
| Download: ML19259B276 (2) | |
Text
~
11EM PiilS STA EE L:N B E RSi! -
p, M E M PH!S. TENNESSEE.h i 5:
~ -.::.
December 22, 1973 r.
- >, i, -
4Lir l } }.Q. *, '
Mr. J. J. Holman U. 5. Nuclear Regulatory Cognission Office of fluclear-Reactor Regulation Operator Licensing Branch 1,'ashington, DC 20555
Dear Jerry,
Dr. David D. Ebert, Associate Professor of Aechanical Engineer-ing at the Catholic University of America, Washington, DC, has ccmaleted a four-day specialized training program in AGN-201 Reactcr Operations at Memphis State Universi'ty's fluclear Reactor Facility.
The program was conducted from December 18, through December 21, 1978 by licensed Senior Cperators and was oriented toward actual perfor-
.mance of reactor startups and reactivity control manipulations.
A training sunnary including the number of reactor startups and hours of actual reactor operation is pec,ided in enclosure (~1).
In my opinion, Dr. Ebert has iemonstrated, the ability to use approved operating procedures and safely manipulate the con rols of an A3N-201 Nuclear Reactor.
Sincerely,
-tdA-D.W. Nones Director RLD:pm Enclosure cc:
Mn. R. L. Dietz Dr. D. D. Ebert 79012400l8 56-P 7 i. Nu r no,'.r t R.j a,e : t h :.
c.c Nus i n r.'.!,: :;-.. e Dr i elopment in 1:q...; Or;
- ity D:iren;ty
E'"
Enc 1csure (1)
TRAIT!It'G SUrtiARY 1.
Reactor Operations - Twelve (12) reactor startups including the (11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />).
following evolutions:
happroachtocritical AGN-201 Power Level Calibration Reactivity Importance Function measurements Excess reactivity measurement Control Rod Reactivity Worth measurement (partial)
Radiation Survey Calculation and verification of Estimated Critical Rod Position 2.
Reactor Scram Loss of Reactor Control Power.
Initiated by Reactor Supervisor without console operator's prior knowledge.
3.
Prestartup Checks
- (1) walkthrough and (3) actual.
(, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />) 4.
Fuel Handling Disassembly and reassembly of an AGN-201 (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)
Core Tank Assembly using spare reactor core tank and dummy (lucite, non fuel,ed) core.
5.
Lecture / Discussion - AGil-201 Construction, Safety Systems, (8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />si Technical Specifications and topics support-ing the evolutions listed in items 1 through 4 above.
Enclosure (1)
.