Letter Sequence Other |
---|
|
|
MONTHYEARML20203G9421998-02-20020 February 1998 Informs That Encl Public Notice of Application for Amend to License DPR-60 Requesting Limited Duration Change to Prairie Island TSs to Allow Reduction in Boron Concentration Required for Mode 6 Forwarded for Publication Project stage: Other ML20217K4991998-04-24024 April 1998 Forwards Notice of Withdrawal of 980210 Application for Amend to License DPR-60.Proposed Change Would Have Modified Facility TSs W/Limited Duration Changes to Allow Reduction in Boron Concentration Required for Mode 6 Project stage: Withdrawal 1998-02-20
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M3371999-10-20020 October 1999 Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217F4331999-10-15015 October 1999 Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F5121999-09-20020 September 1999 Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211N8631999-09-0707 September 1999 Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities ML20211K5911999-09-0101 September 1999 Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables ML20211L0211999-09-0101 September 1999 Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented ML20211K5931999-08-31031 August 1999 Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20211Q6041999-08-31031 August 1999 Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211B8311999-08-19019 August 1999 Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items ML20211B5711999-08-19019 August 1999 Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 ML20211C2311999-08-19019 August 1999 Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results ML20211B0561999-08-18018 August 1999 Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML20210G5061999-07-30030 July 1999 Responds to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates 05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics1999-07-23023 July 1999 Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics ML20210J4991999-07-22022 July 1999 Forwards Rev 18 to USAR for Pingp,Bringing USAR up-to-date as of 990228,though Some Info More Recent.Safety Evaluation Summaries Also Encl ML20209J0941999-07-15015 July 1999 Forwards SER Finding Rev 7 to Topical Rept NSPNAD-8102, Reload Safety Evaluation Methods for Application to PI Units, Acceptable for Ref in Plant Licensing Actions ML20209H8051999-07-14014 July 1999 Forwards Summary of non-modification Safety Evaluation Number 515 Re Storage of Fuel Inserts,Per Insp Rept 72-0010/99-201 ML20209D4181999-07-0707 July 1999 Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr ML20209H8361999-07-0202 July 1999 Forwards Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Issued Reactor Operator Licenses to Operate Pings ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209C3951999-07-0101 July 1999 Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20209B7541999-07-0101 July 1999 Final Response to GL 98-01,Suppl 1 Re Y2K Readiness of Computer Sys.Sys Remediated as Required for Plant Operation. Contingency Plans Developed to Mitigate Impact of Y2K-induced Events at Key Rollover Dates ML20196J8941999-06-30030 June 1999 Transmits Util Comments on Draft Regulatory Guide DG-1074, Steam Generator Tube Integrity. Licensee Recommends That NRC Focus on Several Important Listed Areas Considered Principal Concerns & Contentions ML20209F0391999-06-30030 June 1999 Forwards Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531.Violation Noted.Notice of Violation or Civil Penalty Will Not Be Issued,Based on NRC Listed Decision to Exercise Discretion ML20209C3011999-06-29029 June 1999 Forwards Annual Rept of Corrections to NSP ECCS Evaluation Models,Iaw 10CFR50.46.Since All Analyses Remain in Compliance,No Reanalysis Is Required or Planned ML20209B5751999-06-24024 June 1999 Submits Revised Relief Request for Limited Examinations Associated with Third 10-yr ISI Examination Plan.Attached Is Unit 1 Relief Request 7,rev 1 Which Addresses Limited Examinations ML20196F3871999-06-23023 June 1999 Forwards Revised Pages 71,72 & 298 of Rev 7 to NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units, Per Discussions with Nrc.Approved Version of Rept Will Be Issued 05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics1999-06-18018 June 1999 Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics ML20196D5501999-06-18018 June 1999 Forwards Individual Exam Results for Licensee Applicants Who Took May 1999 Initial License Exam.In Accordance with 10CFR2.790,info Considered, Proprietary. Without Encls ML20196A6741999-06-17017 June 1999 Refers to 990517-20 Meeting with Util in Welch,Minnesota Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M3371999-10-20020 October 1999 Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication ML20217M1111999-10-19019 October 1999 Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys ML20217C2351999-10-0606 October 1999 Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212J8811999-09-28028 September 1999 Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212D8401999-09-16016 September 1999 Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 ML20217H2331999-09-10010 September 1999 Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212B0511999-09-0909 September 1999 Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb ML20217H5661999-09-0909 September 1999 Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl ML20212A9241999-09-0909 September 1999 Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 ML20211Q7641999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal ML20211D3541999-08-24024 August 1999 Discusses GL 95-07 Re Pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves.Forwards SE Re Response to GL 95-07 ML20211C7601999-08-19019 August 1999 Confirms NRC Intent to Meet with NSP & Ceco on 990807 in Lisle,Il to Discuss with Region III Pilot Plants,Any Observations,Feedback,Lessons Learned & Recommendations Relative to Implementation of Pilot Program ML20211B2621999-08-17017 August 1999 Forwards Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22.No Violations Noted.Insp Included Review & Evaluation of Current Emergency Preparedness Performance Indicators ML20211C7371999-08-17017 August 1999 Discusses Closure of Staff Review Re Generic Implication of Part Length Control Rod Drive Mechanism Housing Leak on 980123.Enclosed NRC 980811 & 1223 Ltrs Responded to WOG Positions Re Corrective Actions ML20210T5661999-08-12012 August 1999 Forwards RAI Re & Suppl ,which Requested Exemptions from TSs of Section III.G.2 of 10CFR50 App R,To Extent That Specifies Separation of Certain Redundant Safe Shutdown Circuits with fire-related Barriers ML20210R7021999-08-12012 August 1999 Forwards Insp Repts 50-282/99-06 & 50-306/99-06 on 990601- 0720.One NCV Occurred,Consistent with App C of Enforcement Policy ML20210P5191999-08-11011 August 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & NSP Responses for PINGP & 951117. Staff Reviewed Info in Rvid & Released Info as Rvid Version 2.Requests Submittal of Comments Re Revised Rvid by 990901 ML20209J0941999-07-15015 July 1999 Forwards SER Finding Rev 7 to Topical Rept NSPNAD-8102, Reload Safety Evaluation Methods for Application to PI Units, Acceptable for Ref in Plant Licensing Actions ML20209H8361999-07-0202 July 1999 Forwards Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Issued Reactor Operator Licenses to Operate Pings ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209F0391999-06-30030 June 1999 Forwards Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531.Violation Noted.Notice of Violation or Civil Penalty Will Not Be Issued,Based on NRC Listed Decision to Exercise Discretion ML20196D5501999-06-18018 June 1999 Forwards Individual Exam Results for Licensee Applicants Who Took May 1999 Initial License Exam.In Accordance with 10CFR2.790,info Considered, Proprietary. Without Encls ML20196A6741999-06-17017 June 1999 Refers to 990517-20 Meeting with Util in Welch,Minnesota Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff ML20207B5841999-05-26026 May 1999 Forwards SER Concluding That Licensee 990412 Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Reactor Vessel Head Penetrations for part-length CRDMs Will Provide Acceptable Quality & Safety ML20207D0641999-05-26026 May 1999 Informs of Plans to Conduct Meeting on 990614 in Red Wing,Mn,To Present Planned Changes to NRC Regulatory Processes & Pilot Plant Program for Prairie Island Nuclear Generating Station ML20207B7941999-05-25025 May 1999 Forwards Insp Repts 50-282/99-05 & 50-306/99-05 on 990426- 30.No Violations Noted.Overall Plant Radiological Controls Effective in Maintaining Reasonable Collective Dose for Work Being Conducted During Unit 1 Refueling Outage ML20207B3281999-05-24024 May 1999 Informs That in May 1999,Region III Received Rev 20 to Portions of Prairie Island Nuclear Generating Center Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20207A1491999-05-20020 May 1999 Forwards Request for Addl Info Re Areas of Seismic,Fire,High Winds,Floods & Other External Events for IPEEE Submittals for PINGP Dtd Dec 1996,March 1998 & Dec 1998 ML20206S0891999-05-13013 May 1999 Informs That on 990505 NRC Staff Held Planning Meeting for Plant to Identify Insp Activities at Facility Over Next 6 to 12 Months ML20206N4581999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl ML20206J2101999-05-0404 May 1999 Forwards Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.During Insp Period,Sf Casks 08 & 09 Successfully Loaded & Cask 08 Transported & Placed in ISFSI ML20206E1801999-04-29029 April 1999 Forwards Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted.Purpose of Insp Was to Observe Various Portions of Dry Fuel Cask Loading Program ML20205R4841999-04-16016 April 1999 Forwards Security Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Objective of Insp Effort Was to Determine Whether Activities Authorized by License Were Conducted Safely & IAW NRC Requirements ML20205R1791999-03-30030 March 1999 Responds to Issue Re Generic Implication of part-length Control Rod Drive Mechanism Housing Leak at Praire Island, Unit 2 & Beaver Valley Power Station,Units 1 & 2 IR 05000282/19980161999-03-30030 March 1999 Discusses Fpfi Repts 50-282/98-16 & 50-306/98-16 on 980810-28.Determined That Violations Occurred Involving MOVs Being Unable to Satisfy post-fire Safe Shutdown Function & Spurious Actuation of Sys Due to Fire Damage ML20205B5781999-03-26026 March 1999 Advises That NSPNAD-8102-P,rev 7, Prairie Island NPP Reload Safety Evaluation Methods for Application to PI Units Submitted in 990129 Application Will Be Withheld from Public Disclosure ML20205G9321999-03-26026 March 1999 Informs of Planned Insp Effort Resulting from Prairie Island Plant Performance Review for Period 980328-990131.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 6 Months Encl ML20205C0671999-03-26026 March 1999 Informs That Exhibit E (CEN-629-P,Rev 03-P, Repair of W Series 44 & 51 Steam Generator Tubes Using Leak Tight Sleeves Will Be Withheld from Public Disclosure,Per Util 990205 Application & C-E Affidavit,Per 10CFR2.7990 ML20205B5161999-03-26026 March 1999 Discusses Util Re Rept of Corrections to Licensee ECCS Evaluation Models.Attachments 1 & 2 from Were Withheld from Public Disclosure Due to Proprietary Markings from W.Attachments 1 & 2 Will Now Be Placed in PDR ML20204E4651999-03-18018 March 1999 Forwards Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted ML20207E0401999-03-0404 March 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, Program at Prairie Island Nuclear Generating Plant ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20206U1831999-02-0909 February 1999 Responds to Encl Ltrs, & 1223 Re Generic Implication of part-length CRDM Housing Leak.Review Under TAC Numbers MA1380 & MA1381 Considered Closed ML20202G2101999-01-29029 January 1999 Forwards Insp Repts 50-282/98-23 & 50-306/98-23 on 981204- 990114.No Violations Noted.Insp Characterized by Several Unexpected Operational Events,Caused by Equipment Failure, Personnel Errors & Procedure Problems ML20199L4421999-01-25025 January 1999 Informs That by Encl Ltrs & 981223,NRC Has Responded to WOG Positions Re C/As to Address Generic Aspects of part-length CRD Mechanism Housing Issue That Originated as Result of 980123 Leak at Pings ML20202J1421999-01-22022 January 1999 Informs of Completion of Review of NSP Which Proposed Alternative to Surface Exam Requirements of Paragraph N-518.4 of 1968 ASME BPV Code for CRD Mechanism Canopy Seal Welds.Forwards SE Supporting Alternative ML20199F8471999-01-14014 January 1999 Forwards FEMA Evaluation Rept for 980721-22 Emergency Preparedness Exercise at Prairie Island Nuclear Generating Station ML20206U2101998-12-23023 December 1998 Provides Staff Response to Re WCAP-15126, Technical Assessment of Part Length CRDM Housing Motor Tube Cracking in WOG Plants.Nrc Agrees That Incremental Core Damage Frequency for Range of Defects Might Be 10.6 Per Ry 1999-09-09
[Table view] |
Text
_ __ _ -____-___ _ _ _ _ _ - _ _ - _ _ _ -
.e s February 20. 1998 Mr. Roger O. Anders:n, Director Nuclear Energy Engineering Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401
SUBJECT:
PUBLIC NOTICE OF APPLICATION FOR AMENDMENT TO OPERATING LICENSE FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 (TAC NO. MA0850)
Dear Mr. Anderson:
1 The enclosed notice has been forwarded to the Red Wing Republican Eagle, Minneapolis Star Tribune, and St. Paul Pioneer Press for publication. This notice relates to your application dated February 10,1998, for an amendment to Facility Operating License No.
I DPR 60 to requesting a limited duration change to the Prairie Island Technical Specifications that would allow a reduction in the boron concentration required for Mode 6. Your application requested that the ar-- '9ent be processed on an emergency basis. However, the proposed l license amendment will only be regtcad if it becomes necessary to remove the reactor vessel head to support repairs during the current Unit 2 forced outage.
Sincerely, ORIGINAL SIGNED BY Beth A. Wetzel, Senior Project Manager f Project Directorate ill 1 I Division of Reactor Projects -Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50 282 and 50 306
))
Enclosure:
Notice cc w/ encl: See next page DISTRIBUTION: 4 Docket File PD31 Rdg EAdensam OGC ACRS PUBLIC OPA MLesar JMcCormick Barger DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \ PIMA 0850.LTR
- Concurred in attached notice t c.w. . e.n or w. naco unec. in u w m em .m .nem nv.ew. r . em .n.*n.ne.e.u.. v . 9. em OFFICE PM:PD31 lE LA:PD31 E 'OPA:Rlli lE 'OGC D:PD31 l NAME BWetzel: gt/ AGreenman for AHodgdon CACarpenter CJamerson p/) JStrasma CM 3 ATE 02/ /f] /98 02/ / T /98 V 02/12/98 (email) 02/12/98 .1 / IS /98 OFFICIAL RECORD COPY jn28anH88,88a j ggg gg g gg;ggpy Il.llll,lillll,llll lllllll
l Mr. Roger O. Anderson, Director Prairie Island Nuclear Generating Northern States Power Company Plant ec: .
I J. E. Silberg, Esquire Site Licensing l Shaw, Pittman, Potts and Trowbridge Prairie loland Nuclear Gen 3 rating 2300 N Street, N. W. Plant Washington DC 20037 Northern States Power Company 1717 Wakonado Drive East Plant Manager Welch, Minnesota 5508g Prairie Island Nucicar Generating Plant Tribal Council Northern States Power Company Prairie Island Indian Community 1717 Wakonade Drive East ATTN: EnvironmentalDepartment Welch, Minnesota 5508g 5636 Sturgeon Lake Road Welch, Minnesota 5508g Adonis A. Nebiett
' Assistant Attorney General Office of the Attorney General 455 Minnesota Street Suite 900 St. Paul, Minnesota 55101 2127 U.S. Nuclear Regulatory Commission Resident inspector's Office 171g Wakonade Drive East Welch, Minnesota 5508g 9642 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr.Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101 2145 P40vember 1996 s _ , - ._- -, - , , . . _ _ _ , , , --._,r -
PUBLIC NOTICE NRC STAFF PROPOSES TO AMEND OPERATING LICENSE FOR I PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 i I
The U.S. Nuclear Regulatory Commission (NRC) has received an application dated February 10,1998, from the Nonhem States Power Company (the licensee) for an amendment to Facility Operating License No. DPR 60 for the Prairie Island Nucleef Generating Plant, Unit 2, located in Goodhue CoLnty, Minnesota.
The amendment request proposes a limited duration change to the Prairie Island Technical Specifications that would allow a reduction in the boron concentration required for Mode 6. The current requirement of greater than or equal to 2000 ppm would be reduced to greater than or equa! to 1900 ppm. Under the proposed change, if it became necessary to remove the reactor vessel head during the current Unit 2 forced outage, the active volume of the reactor coolant system would be maintained at a boron concentration of greater than or equal to 1900 ppm to ensure that k, remains below 0.95 at all times.
The February 10,1998, application requested that the amendment be processed on an emergency basis. However, the proposed license amendment wi!I only be required if it becomes necessary to remove the reactor vessel Sead to support repairs duting the current Unit 2 forced outage. The licensee has been able to conduct all necessary repairs with the reactor vessel head in place, if reactor vessel head removal becomes necessary, the NRC could issue the amendment prior to the end of the comment period. The need for exigent processing exists in that failure of the Commission to act in a timely manner would result in the prevention of resumption of operation of Prairie Island Unit 2. The licensee was unable to make a more timely application because the circumstances surrounding the repair of the Unlt 2 part-length control rod drive mechanism (CRDM) and the unanticipated need to enter Mode 6 for the repairs did not allow the licensee to predict that the proposed license amendment would be
2 required. The staff has determined that the licensee used its best efforts to make a timely application for the proposed changes and that exigent circumstances 60 exist and were not the E
i result of any intentional delay on the part of the licensee. If Unit 2 maintenance activities require toe removal of the reactor vessel head the amendment would be issued to support that activity. However, if vessel head removal does not become necessary to support the Unit 2 maintenance activities, no amendment will be issued.
. . Following an initial review of this application against the standards in 10 CFR 50.92, the NRC staff has made a proposed (preliminary) determination that the amendment request involves no significant hazards consideration. According to 10 CFR 50.92(c), this means that the proposed amonoment would not involve a significant increase in the probability or consequences ci an accident previously evaluated.,would not create the possibility of a new or diffe;ent kind of accident from any accident previously evaluated, or involve a significant reduction in a margin of safety. The licensee's analysis of the no significant hazards consideration is presented below:
- 1. The proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
As the proposed change would only be in place for a limited duration and because they do not involve any physical changes to the reactor coolant system and no equipment is -
operated in a new or different manner, the proposed changes do not involve an increase in the probability of an accident previously evaluated.
Because the proposed 1900 ppm boron concentration limit wil! ensure that K, remains less than 0.95 under all postulated conditions, this change will not impact the consequences of any accident previously evaluated.
Therefore, basea on the condt sions of the above analysis, the proposed changes will not involve a significaat increase in the probability or consequences of an accident previously evaluated.
- 2. The proposed cmendment will not create the possibility of a new or different kind of accidert from any accident previously analyzed.
y - -.
l 3
The proposed amendment would not create the posalbility of a new or diMerent kind of accident previously evaluated, as it only involves a limited duration ws 'lon in th e reactor system boron requirements for Mode 6 operation. There is w a nge in plant configuration, equipment or equipment design. No equipment is opewed in a new manner. Thus the changes will not create any new or different accident causal mechanisms. The accident analysis in the Updated Safety Analysis Report remains bounding. '
Therefore, based on the conclusions of the above analysis, the proposed changes will 4
not creato the possibility of a new or different kind of accident.
b.O
- 3. The proposed amendment will not involve a significant reduction in the margin of safety.
The required Mode 6 boron concentration ensures that K., will remain less than 0.95 so that sdequate margin to criticality is always maintained during core alterations and fuel handling operations. No core alterations or fuel handling will be necessary and none are planned during the operations to be performed in Mode 6 for resolution of the Unit 2 CRDM leakage. With the exception of reactor vessel head removal, the reactor configuration will be the same as it is during Mode 5, where K.,is only required to be less than 0.99. Becausa no core alterations or fuel handling operations are planned during the current Unit 2 outage, and becauhe the proposed 1900 ppm boron concentration limit will ertsure that K,3 remains less than 0.95 under all postulated conditions, there is no significant reduction in the plant's margin of safety.
It has also been shown that the proposed 1900 ppm Mode 6 boron concentration will ensure that the analysis of a dilution accident as described in the Updated Safety Analysis Report remains bounding.
Based on these factors, the changes proposed by this License Amendment Request v ill not result in a significant reduction in the plant's margin of safety, if the proposed determination that the requested license amendment involves no significant hazards consideration becomes final, the NRC will issue tne amendment without first offering an opportunity for a ;.ublic hearing. An opportunity for a hearing will be published in the FederalRegisterat a later date and any hearing request will not delay the effective date of the amendment.
If the NRC decides in its final determination that the amendment does involve a significant hazards consideration, a notico of opportunity for a prior hearing will be published in the FederalRegister and, if a hearing is granted, it will be held before the amendment is issued.
9 4
Comments on the proposed determination of no signifir ant hazards consideration may be submitted to Cynthia Carpenter Director, Project Directorate lil-1, by collect call to 1-301 M 7:30 a. m . 4. @S p r*g,; febt.wshp, 415-134(Tor by facsimile to 1-301-415-3061. Written commen" may be submitted by rna;l to the Chief, Rules and Directives Branch, Division of Administrative Services, Office of l Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Wntten l
comments may also be delivered to Room 6D59, Two White Flint North,11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal worLdays. Copies of written comments received may be examined at the NRC Public Document Room, the Gelman ;
Building,2120 L Street, NW, Washington, DC. All comments received by 4:15 p.m. Eastem Standard Time on February 20,1998, will be considered in reaching a final determination.
A copy of the application may be examined at the NRC's Local Public Document Room
- located in the Minneapolis Public Library, Technology and Science Department, 300 Nicollet -
Mall, Minneapolis, Minnesota 55401, and at the Commission's Public Document Room.
DOCUMENT NAM: G:\WPDOCS\ PRAIRIE \ BORON.NOT **-'"ad To receive a copy of this document. indicate in the box C= Copy w/o attachment l enclosure E= Copy with agcghent/ enclosure N = Ho c OFFICE
~
PM:PD31 E LA:PD31 _E DPA:Rlli OGC D:PD31 .
^"
NAME BWetzelh CJamersorh/$trasma h CACorg.]te DATE 02//.a /98 Oy i1 /98[ 02/ 17-. /98 02/ / 7 /98 02/ l3.198
~
'CFFICIAL RECdRD COPY