Responds to Generic Ltr 83-10D Re Resolution of TMI Action Item II.K.3.5, Study Need for Auto Trip of Reactor Coolant Pumps. Resolution Will Be Initiated When Customer for First FNP Is Attained & Final Design Efforts Begun
ML20073B517
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 04/08/1983
From: Thomas R
OFFSHORE POWER SYSTEMS (SUBS. OF WESTINGHOUSE ELECTRI
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.05, TASK-TM GL-83-100, GL-83-10D, OPS-RAT-066, OPS-RAT-66, NUDOCS 8304120444
Download: ML20073B517 (1)


Text

OPS-RAT-066 Offshore Power Systems 8000 Arlington Expressway 004-724-7700 Box 8000, Jacksonville, Florida 32211 Telex: 568406 April 8, 1983 Mr. D. G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Cormi.

Washington, DC 20555 Re: Docket No. STN 50-437 Generic Letter 83-10d j

Dear Mr. Eisenhut:

Offshore Power Systems does not believe itself to be a " licensee" as used to address Generic Letter 83-10d, dated February 8, 1983. Rather, we are more properly ,

equivalent to a construction permit holder. We are  ;

therefore uncertain as to whether a response to Generic Letter 83-10d is required, but none-the-less offer the following:

The resolution of TMI Action Item II.K.3.5 will be initiated when and if (1) a customer for the first FNP is attained and (2) final design efforts are begun. These events cannot be meaningfully scheduled at this time.

Ver truly ygurs,

. G. 9%~

R. A. Thomas, Manager Offshore Power Systems cc: V. W. Campbell E. P. Rahe D. H. Walker DOf B304120444 830400 PDR ADOCK 05000437 p PDR