FNP-MNE-901 Offshore Power Systems 8000 Atlingion E xpresswav 904 -724 -7700 Box 80oo, Jacksonville, flonda 32211 Tetex:568406 February 12, 1979 Mr. Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue
,Bethesda, Maryland 20852
Dear Mr. Baer:
RE:
DOCKET NO. STN50-437; 0FFSHORE POWER SYSTEMS MANAGEMFNT CHANGES The purpose af this letter is to inform you of recent cnanges in the upper management of Offshore Power Systems.
Effective January 29, 1979, Mr. A. R.
Collier replaced Mr. A. P. Zechella as President, Offshore Power Systems.
Effective February 1, 1979, Mr. P. B. Haga was appointed Director, Plant Analysis and Licensing, and Mr. R. A. Thomas was appointed Director, Design Engineering.
At the same time the former positions of Vice President, Engineering and Director, Product Assurance were dissolved. The responsibility for product assurance functions has been assigned to the Director, Plant Analysis and Licensing.
We request that future correspondence be addressed to Mr. A. R. Collier.
Very truly yours, P. B. Haga Director Plant Analysis and Licensing