ML20010J374
| ML20010J374 | |
| Person / Time | |
|---|---|
| Site: | Atlantic Nuclear Power Plant |
| Issue date: | 09/10/1981 |
| From: | Haga P OFFSHORE POWER SYSTEMS (SUBS. OF WESTINGHOUSE ELECTRI |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-24, REF-GTECI-ES, RTR-NUREG-0588, RTR-NUREG-588, TASK-A-24, TASK-OR FNP-PST-076, FNP-PST-76, NUDOCS 8109300383 | |
| Download: ML20010J374 (1) | |
Text
.
FHP-PST-076 Offchore Power Systems m-
_ntm
.n
- m:'w o
a
.:x n u s 211 r.
w x
g September 10, 1981 g
SEP29;ggg,j-Ms. Elinor Adensam, Chief i
Licensing Branch No. 4 i
v.s.
U.S. Nuclear Regulatory Commission C)s
- D[
7920 Norfolk Avenue 4
y Bethesda, MD 20852 4
G2 C*
5 P. B. Haga Concerning Equipment Qualification Director Power Systems Technology
Dear Ms. Adensam:
As a result of a telephone conversation with Mr. Mike Mallory on September 9,1981, item 1.a of my letter FNP-PST-073 (dated September 2,1981) is modified to read as follows:
1.
With regard to Generic Issue A-24:
a.
Safet?.-related equipment will be qualified in accordance with NUREG-0588, Category 1 require-ments.
Seismic qualification will be conducted in accordance with IEEE 344-1975.
We believe this commitment to be fully responsive to the Staff's request and trust that SER Supplement 4 will not be further delayed because of this issue.
Vep rul your,
A --
P. B. Haga
/lel CC:
V. W. Campbell A. R. Collier b
O 0
81093003R3 810910 I
61 PDR ADOCK 05000437 I
PDR.
A
-_-m__
_______m
_ - _. _ _ _ _ _ _ _. _ _ _ _ _ _