ML20040G353
ML20040G353 | |
Person / Time | |
---|---|
Site: | Atlantic Nuclear Power Plant |
Issue date: | 01/29/1982 |
From: | Effenberger E AFFILIATION NOT ASSIGNED |
To: | Hendrie J NRC COMMISSION (OCM) |
References | |
NUDOCS 8202120201 | |
Download: ML20040G353 (1) | |
Similar Documents at Atlantic Nuclear Power Plant | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205C3521988-09-23023 September 1988
[Table view]Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20093K3281984-10-11011 October 1984 Requests Discontinuance of Document Distribution to Offshore Power Sys,Which Closed on 840901 ML20083K7301984-03-27027 March 1984 Responds to IE Bulletin 83-08.Circuit Breakers Not Purchased or Specified for safety-related Applications.No Further Design Activities Planned Prior to Obtaining Customer ML20073B5171983-04-0808 April 1983 Responds to Generic Ltr 83-10D Re Resolution of TMI Action Item II.K.3.5, Study Need for Auto Trip of Reactor Coolant Pumps. Resolution Will Be Initiated When Customer for First FNP Is Attained & Final Design Efforts Begun ML20071E8321983-03-0101 March 1983 Ack Receipt of Generic Ltr 83-07 Re Requirements of Nuclear Waste Policy Act of 1982.Lists Reasons for Not Entering Into Waste Disposal Contract W/Doe ML20072A8671982-12-29029 December 1982 Requests Public Statement Responding to 760615 Testimony Before NRC Re Safety Concerns Associated W/Ops Floating Nuclear Power Plants ML20072A8621982-12-12012 December 1982 Requests Response to Previous Correspondence Opposing OPS Floating Nuclear Power Plants,Heretofore Unacknowledged by Nrc.June 1976 Testimony on SER Encl ML20072A8761982-12-0101 December 1982 Requests Response to ,Mistakenly Directed to Former Chairman Jm Hendrie ML20069G5291982-09-17017 September 1982 Forwards Revisions to Environ Protection Plan Per 820915 Telcon ML20072A8701982-08-14014 August 1982 Lists Reasons for Opposing Issuance of Mfg License to OPS for Floating Nuclear Power Plants ML20054M3461982-06-23023 June 1982 Confirms 820623 Telcon Re Official Closing of Lpdr for Offshore Nuclear Power Plant.Lpdr in Jacksonville,Fl Will Remain Open ML20052G6091982-05-11011 May 1982 Advises of RA Thomas Appointment as Acting Manager of Offshore Power Sys Div.Pb Haga Appointed Director of Engineering.Svc List Encl.Related Correspondence ML20041E5781982-03-0505 March 1982 Advises That OPS Became Div of Water Reactor Div of Westinghouse on 820201.Change Does Not Affect Licensing Process.Svc List Encl ML20041D6861982-02-24024 February 1982 Advises of Westinghouse Nuclear Energy Sys Organizational Changes.Organizational Charts Encl ML20040G3531982-01-29029 January 1982 Requests Public Response to 760615 Testimony ML20039E7421981-12-21021 December 1981 Delegates Authority for Review of Info Sought to Be Withheld from Public to Pb Haga,Director of Power Sys Technology ML20062M2991981-12-11011 December 1981 Forwards Applicant 811211 Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision. Document Supersedes Applicant 790601 Proposed Partial Findings of Fact in Form of Proposed Initial Decision ML20038B9601981-12-0202 December 1981 Repts on 811113 Telcon.Aslb Denied Applicant Request That Answers to ASLB 811112 Questions Be Provided Orally at 811204 Hearing.Answers Are to Be Filed in Advance by 811127. Certificate of Svc Encl.Related Correspondence ML20038B5911981-11-12012 November 1981 Submits Info Requested in 811106 Telcon W/Nrc Re Turbine Missile Shield ML20049A7371981-09-17017 September 1981 Confirms 810917 Telcon Re Containment Design Pressure.Util Reluctantly Commits to Design Containment Vessel to Meet ASME Svc Level a Stress Limits for Design Interval Pressure of 25 Psig at Ambient Temp ML20010J3741981-09-10010 September 1981 Submits Addl Info Re Equipment Qualification Modifying 810902 Response Re Generic Issue A-24.Safety-related Equipment Will Be Qualified in Accordance w/NUREG-0588, Category I Requirements ML20010F8661981-09-0404 September 1981 Ack Receipt of NRC 810831 Ltr Re Meeting W/Util to Discuss Facility.Gl Paulson No Longer W/Nj Dept on Environ Protection.A Mclellan Now Assistant Commissioner for Science & Research & Should Replace Paulson on Mailing List ML20010E6101981-08-28028 August 1981 Corrects Date of Ref Cited in 810818 Ltr Responding to NRC Request for Info Re Generic Technical Issues A-2 & A-36 ML20009C8931981-07-22022 July 1981 Advises That Review of Plant Design Rept & Amends for Barge Mounted Floating Nuclear Plant Has Been Completed.Final Approval Will Depend on Successful Plan Review,Insp During Const & Approval by Officer in Charge ML19346A4151981-06-11011 June 1981 Forwards Draft App C to Plant Design Rept, in Response to post-TMI Requirements.App C Will Be Filed Formally at Conclusion of Technical Review & Upon Resolution of NRC Concerns ML20004E5451981-06-0606 June 1981 Requests Name Be Deleted from Mailing List Re Hearings ML20126F4071981-03-10010 March 1981 Forwards Characteristics & Sketch of Floating Nuclear Power Plant & Info Sheets on Floating Nuclear Power Plant & Mfg Facility,On Behalf of Ofc of General Counsil.Requests Insp of Facility & Testimony at 810526 Trial Re Mfg of Plants ML20008F5561981-03-0404 March 1981 Urges Inclusion of OPS Mfg License Application in Proposed Rule Defining TMI accident-related Requirements for Pending CP & Mfg Licenses ML20008F5621981-03-0303 March 1981 Expresses Concern Re Inclusion of OPS Application in Proposed Rule Currently Under Consideration for near-term Cp/Mfg License Applications ML20008F5671981-02-24024 February 1981 Urges Inclusion of OPS Mfg License Application in Proposed Rulemaking Defining TMI accident-related Requirements for Pending CP & Mfg Licenses ML20002E3551980-12-16016 December 1980 FOIA Request for All Documents Re OPS Application for License to Mfg Floating Nuclear Plants Containing Statements Re Alternate Land Uses ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19332A0831980-09-0505 September 1980 Requests That Schedule Be Established for Completing Review of Application for Mfg License & That NRC Resources Be Committed for That Purpose.Nrc Should Initiate Review of Util 800715 Responses to NUREG-0660 ML19331C6281980-07-22022 July 1980 Requests Available Info Re Projected Offshore Floating Nuclear Power Plant ML19320D4621980-07-15015 July 1980 Forwards 36A93, OPS Responses to Post-TMI NRC Requirements, Revision 1.Rept Represents Vast Majority of New Info Required to Support Issuance of Mgt License. Requests Meeting W/Nrc at Earliest Possible Convenience ML19329G1971980-05-21021 May 1980 Requests Reply to CT Brown 800407 Ltr Expressing Support for Floating Nuclear Power Plant Project ML19320B7581980-05-16016 May 1980 Ack Receipt of Encl 800407 Ltr to President Carter Re Employment Opportunities Offered by Offshore Floating Nuclear Plant Project.Decisions on Commercial Projects Are Made by Private Sector,W/Nrc Approval ML19323C6321980-05-0606 May 1980 Forwards Review Re Applicability of post-TMI Action Plan Requirements Contained in Draft 3 of NUREG-0660 & Applicability of Item III.A.2-2 of NUREG-0654.Response to All Action Plan Items,Except Item II.B.8 Planned for ML19305C4241980-03-18018 March 1980 Forwards Response to NRC 791017 Ltr Requesting Addl Info Re Core Thermohydraulic Effects ML19257A3011979-12-21021 December 1979 Forwards 36A93, Responses to Post-TMI NRC Requirements, Per IE Bulletin 79-06,NRC 791010 & 1109 Ltrs Re TMI Lessons Learned Task Force short-term Requirements & TMI Lessons Learned Task Force Final Rept. ML19210D0981979-11-0707 November 1979 Forwards Response to OPS 790709 Ltr Re Mobilization & Deployment of Coast Guard Vessels in Response to Emergency at Floating Nuclear Power Plant ML19210C9341979-10-18018 October 1979 Responds,On Behalf of Applicant,To NRC 791011 Ltr Addressed to ASLB Re Unavailability of NRC Witness.Requests Scheduling of 791031 or 1101-02 & 05 Hearing Session Re ASLB Questions Pending Since Mar 1979.Urges Publication of SER Schedule ML19253B4191979-10-0505 October 1979 Requests Plan & Schedule for Completion of Review of Application for Mfg License ML19253B5911979-09-26026 September 1979 Agrees to Use McGuire Nodalization Scheme or More Detailed Model for Analyses of Pressure Transient in Steam Generator Encl Following Steam Line Rupture ML19208D5551979-09-21021 September 1979 Forwards Revision 2 to Rept 36A59, Fnp Core Ladle Design & Safety Evaluation. Revision Reflects Sandia Lab Comments Transmitted in NRC 790605 Ltr & Results of 790724 Meeting W/Nrc & Sandia Lab ML19209C9571979-09-20020 September 1979 Protests NRC Recommendation That Floating Nuclear Power Station Not Be Built ML19208B0281979-09-14014 September 1979 Forwards Responses to ACRS Subcommittee 790725 Questions Re Core Ladle & TMI-2.Response Modifies Design Presented in Rept 36A59 Floating Nuclear Plant Core Laddle Design & Safety Evaluation. Requests ACRS Meeting in Oct ML19209B4791979-09-0606 September 1979 Forwards 790806 Ltr from B Peters Expressing Concern About Possible NRC Decision to Issue License for Const of Offshore Nuclear Power Plants.Requests Review & Assistance in Responding to Ltr ML19211A8421979-09-0606 September 1979 Forwards B Peters Ltr Re NRC Decision to Issue License for Const of Floating Nuclear Plants.Requests Comment ML19209B3511979-08-22022 August 1979 Forwards Ltr from PA Nilsson Expressing Concern About Plans to Issue Mfg License.Requests Info in Order to Respond to Constituent Inquiry 1988-09-23 Category:INCOMING CORRESPONDENCE MONTHYEARML20093K3281984-10-11011 October 1984
[Table view]Requests Discontinuance of Document Distribution to Offshore Power Sys,Which Closed on 840901 ML20083K7301984-03-27027 March 1984 Responds to IE Bulletin 83-08.Circuit Breakers Not Purchased or Specified for safety-related Applications.No Further Design Activities Planned Prior to Obtaining Customer ML20073B5171983-04-0808 April 1983 Responds to Generic Ltr 83-10D Re Resolution of TMI Action Item II.K.3.5, Study Need for Auto Trip of Reactor Coolant Pumps. Resolution Will Be Initiated When Customer for First FNP Is Attained & Final Design Efforts Begun ML20071E8321983-03-0101 March 1983 Ack Receipt of Generic Ltr 83-07 Re Requirements of Nuclear Waste Policy Act of 1982.Lists Reasons for Not Entering Into Waste Disposal Contract W/Doe ML20072A8671982-12-29029 December 1982 Requests Public Statement Responding to 760615 Testimony Before NRC Re Safety Concerns Associated W/Ops Floating Nuclear Power Plants ML20072A8621982-12-12012 December 1982 Requests Response to Previous Correspondence Opposing OPS Floating Nuclear Power Plants,Heretofore Unacknowledged by Nrc.June 1976 Testimony on SER Encl ML20072A8761982-12-0101 December 1982 Requests Response to ,Mistakenly Directed to Former Chairman Jm Hendrie ML20069G5291982-09-17017 September 1982 Forwards Revisions to Environ Protection Plan Per 820915 Telcon ML20072A8701982-08-14014 August 1982 Lists Reasons for Opposing Issuance of Mfg License to OPS for Floating Nuclear Power Plants ML20052G6091982-05-11011 May 1982 Advises of RA Thomas Appointment as Acting Manager of Offshore Power Sys Div.Pb Haga Appointed Director of Engineering.Svc List Encl.Related Correspondence ML20041E5781982-03-0505 March 1982 Advises That OPS Became Div of Water Reactor Div of Westinghouse on 820201.Change Does Not Affect Licensing Process.Svc List Encl ML20041D6861982-02-24024 February 1982 Advises of Westinghouse Nuclear Energy Sys Organizational Changes.Organizational Charts Encl ML20040G3531982-01-29029 January 1982 Requests Public Response to 760615 Testimony ML20039E7421981-12-21021 December 1981 Delegates Authority for Review of Info Sought to Be Withheld from Public to Pb Haga,Director of Power Sys Technology ML20062M2991981-12-11011 December 1981 Forwards Applicant 811211 Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision. Document Supersedes Applicant 790601 Proposed Partial Findings of Fact in Form of Proposed Initial Decision ML20038B9601981-12-0202 December 1981 Repts on 811113 Telcon.Aslb Denied Applicant Request That Answers to ASLB 811112 Questions Be Provided Orally at 811204 Hearing.Answers Are to Be Filed in Advance by 811127. Certificate of Svc Encl.Related Correspondence ML20038B5911981-11-12012 November 1981 Submits Info Requested in 811106 Telcon W/Nrc Re Turbine Missile Shield ML20049A7371981-09-17017 September 1981 Confirms 810917 Telcon Re Containment Design Pressure.Util Reluctantly Commits to Design Containment Vessel to Meet ASME Svc Level a Stress Limits for Design Interval Pressure of 25 Psig at Ambient Temp ML20010J3741981-09-10010 September 1981 Submits Addl Info Re Equipment Qualification Modifying 810902 Response Re Generic Issue A-24.Safety-related Equipment Will Be Qualified in Accordance w/NUREG-0588, Category I Requirements ML20010F8661981-09-0404 September 1981 Ack Receipt of NRC 810831 Ltr Re Meeting W/Util to Discuss Facility.Gl Paulson No Longer W/Nj Dept on Environ Protection.A Mclellan Now Assistant Commissioner for Science & Research & Should Replace Paulson on Mailing List ML20010E6101981-08-28028 August 1981 Corrects Date of Ref Cited in 810818 Ltr Responding to NRC Request for Info Re Generic Technical Issues A-2 & A-36 ML20009C8931981-07-22022 July 1981 Advises That Review of Plant Design Rept & Amends for Barge Mounted Floating Nuclear Plant Has Been Completed.Final Approval Will Depend on Successful Plan Review,Insp During Const & Approval by Officer in Charge ML19346A4151981-06-11011 June 1981 Forwards Draft App C to Plant Design Rept, in Response to post-TMI Requirements.App C Will Be Filed Formally at Conclusion of Technical Review & Upon Resolution of NRC Concerns ML20004E5451981-06-0606 June 1981 Requests Name Be Deleted from Mailing List Re Hearings ML20126F4071981-03-10010 March 1981 Forwards Characteristics & Sketch of Floating Nuclear Power Plant & Info Sheets on Floating Nuclear Power Plant & Mfg Facility,On Behalf of Ofc of General Counsil.Requests Insp of Facility & Testimony at 810526 Trial Re Mfg of Plants ML20008F5561981-03-0404 March 1981 Urges Inclusion of OPS Mfg License Application in Proposed Rule Defining TMI accident-related Requirements for Pending CP & Mfg Licenses ML20008F5621981-03-0303 March 1981 Expresses Concern Re Inclusion of OPS Application in Proposed Rule Currently Under Consideration for near-term Cp/Mfg License Applications ML20008F5671981-02-24024 February 1981 Urges Inclusion of OPS Mfg License Application in Proposed Rulemaking Defining TMI accident-related Requirements for Pending CP & Mfg Licenses ML20002E3551980-12-16016 December 1980 FOIA Request for All Documents Re OPS Application for License to Mfg Floating Nuclear Plants Containing Statements Re Alternate Land Uses ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19332A0831980-09-0505 September 1980 Requests That Schedule Be Established for Completing Review of Application for Mfg License & That NRC Resources Be Committed for That Purpose.Nrc Should Initiate Review of Util 800715 Responses to NUREG-0660 ML19331C6281980-07-22022 July 1980 Requests Available Info Re Projected Offshore Floating Nuclear Power Plant ML19320D4621980-07-15015 July 1980 Forwards 36A93, OPS Responses to Post-TMI NRC Requirements, Revision 1.Rept Represents Vast Majority of New Info Required to Support Issuance of Mgt License. Requests Meeting W/Nrc at Earliest Possible Convenience ML19329G1971980-05-21021 May 1980 Requests Reply to CT Brown 800407 Ltr Expressing Support for Floating Nuclear Power Plant Project ML19323C6321980-05-0606 May 1980 Forwards Review Re Applicability of post-TMI Action Plan Requirements Contained in Draft 3 of NUREG-0660 & Applicability of Item III.A.2-2 of NUREG-0654.Response to All Action Plan Items,Except Item II.B.8 Planned for ML19305C4241980-03-18018 March 1980 Forwards Response to NRC 791017 Ltr Requesting Addl Info Re Core Thermohydraulic Effects ML19257A3011979-12-21021 December 1979 Forwards 36A93, Responses to Post-TMI NRC Requirements, Per IE Bulletin 79-06,NRC 791010 & 1109 Ltrs Re TMI Lessons Learned Task Force short-term Requirements & TMI Lessons Learned Task Force Final Rept. ML19210D0981979-11-0707 November 1979 Forwards Response to OPS 790709 Ltr Re Mobilization & Deployment of Coast Guard Vessels in Response to Emergency at Floating Nuclear Power Plant ML19210C9341979-10-18018 October 1979 Responds,On Behalf of Applicant,To NRC 791011 Ltr Addressed to ASLB Re Unavailability of NRC Witness.Requests Scheduling of 791031 or 1101-02 & 05 Hearing Session Re ASLB Questions Pending Since Mar 1979.Urges Publication of SER Schedule ML19253B4191979-10-0505 October 1979 Requests Plan & Schedule for Completion of Review of Application for Mfg License ML19253B5911979-09-26026 September 1979 Agrees to Use McGuire Nodalization Scheme or More Detailed Model for Analyses of Pressure Transient in Steam Generator Encl Following Steam Line Rupture ML19208D5551979-09-21021 September 1979 Forwards Revision 2 to Rept 36A59, Fnp Core Ladle Design & Safety Evaluation. Revision Reflects Sandia Lab Comments Transmitted in NRC 790605 Ltr & Results of 790724 Meeting W/Nrc & Sandia Lab ML19209C9571979-09-20020 September 1979 Protests NRC Recommendation That Floating Nuclear Power Station Not Be Built ML19208B0281979-09-14014 September 1979 Forwards Responses to ACRS Subcommittee 790725 Questions Re Core Ladle & TMI-2.Response Modifies Design Presented in Rept 36A59 Floating Nuclear Plant Core Laddle Design & Safety Evaluation. Requests ACRS Meeting in Oct ML19209B4791979-09-0606 September 1979 Forwards 790806 Ltr from B Peters Expressing Concern About Possible NRC Decision to Issue License for Const of Offshore Nuclear Power Plants.Requests Review & Assistance in Responding to Ltr ML19211A8421979-09-0606 September 1979 Forwards B Peters Ltr Re NRC Decision to Issue License for Const of Floating Nuclear Plants.Requests Comment ML19209B3511979-08-22022 August 1979 Forwards Ltr from PA Nilsson Expressing Concern About Plans to Issue Mfg License.Requests Info in Order to Respond to Constituent Inquiry ML19209B1511979-08-15015 August 1979 Notifies That Intervenor Atlantic County,Nj,Will Take Passive Role in Proceedings Unless Interests Are Directly Affected ML19250C0621979-08-0808 August 1979 Forwards H Padula 790806 Ltr Re Authorizing of OPS to Mfg Eight Floating Nuclear Plants in State of Fl.Requests Comment ML19249D9771979-08-0808 August 1979 Three Citizen Ltrs Opposing Licenses to Build Nuclear Power Plants in Atlantic Ocean & Gulf of Mexico 1984-03-27 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20072A8671982-12-29029 December 1982
[Table view]Requests Public Statement Responding to 760615 Testimony Before NRC Re Safety Concerns Associated W/Ops Floating Nuclear Power Plants ML20072A8621982-12-12012 December 1982 Requests Response to Previous Correspondence Opposing OPS Floating Nuclear Power Plants,Heretofore Unacknowledged by Nrc.June 1976 Testimony on SER Encl ML20072A8761982-12-0101 December 1982 Requests Response to ,Mistakenly Directed to Former Chairman Jm Hendrie ML20072A8701982-08-14014 August 1982 Lists Reasons for Opposing Issuance of Mfg License to OPS for Floating Nuclear Power Plants ML20040G3531982-01-29029 January 1982 Requests Public Response to 760615 Testimony ML20004E5451981-06-0606 June 1981 Requests Name Be Deleted from Mailing List Re Hearings ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19331C6281980-07-22022 July 1980 Requests Available Info Re Projected Offshore Floating Nuclear Power Plant ML19249D9771979-08-0808 August 1979 Three Citizen Ltrs Opposing Licenses to Build Nuclear Power Plants in Atlantic Ocean & Gulf of Mexico ML19246B9301979-05-0808 May 1979 Requests Reply to 790408 Ltr Re Approval of Floating Nuclear Plants Off Fl Coast ML19246B9331979-04-0808 April 1979 Opposes Floating Nuclear Plants Because of Potential Weather Dangers ML19308A3261979-03-27027 March 1979 Requests Repts Buckling Criteria & Application of Criteria to Design of Steel Containment Shell & Review of OPS Rept 7270-RP-16A51. ML19283B6171979-01-30030 January 1979 Requests That Applicant Be Required to File W/Aslb & Parties Copies of All Communications W/Nrc ML19289D1991979-01-11011 January 1979 Cites Failure to Receive Applicant 781031 Ltr to NRC Describing Proposed Schedule for Responding to Update Review Matters.Requests Board Direct Applicant to Cease Negligent Behavior Immediately ML19256A7901979-01-10010 January 1979 Requests Clarification of Statement in Fes Addendum Part 3 Re Preconditon for Permit to Site Floating Nuclear Plant in Riverine,Estuarine,Or Barrier Island Site.Applicant Can & Will Meet All Conditons in Fes ML19289C6861979-01-0909 January 1979 Plans to File Motion Regarding Propriety of Continuing Hearings.Believes Need for Hasty Action Re Floating Nuclear Plants Has Subsided ML19269B9851978-12-29029 December 1978 NRDC Is Proposing Reforms to Protect Legitimate Interests to Which Ex Parte Rule Is Addressed,Allow Commission to Have Better Access to Matl & Increase Public Involvement in Commission Decisions ML20150E0061978-11-30030 November 1978 Forwards 781101 Memo Reflecting NRC Policy Re Use of WASH-1400 Values in Review of ALAB-489 & ALAB-500.Relevance of WASH-1400 in Subj Proc Is Discussed in 780918 NRDC Motion ML20147G9021978-11-29029 November 1978 Requests Prompt Response to Re Staff'S Planned Compliance W/Executive Order 11988 on Floodplains W/Respect to Subj Proc ML20150B2221978-10-13013 October 1978 Requests Info Re Implementation of Compliance W/Executive Order 11988 Re Floodplains in Preparation for Proceedings 1982-08-14 |
Text
- n.
s
,. -e-.
rrnst J. Effenberger 936 Tahiti Ed. E.
, Jacksonville, Fla. 32216
'82 FEB -8 A 8 :00 Tel. 904-724-9461 t?; .. .
January 29, 1982 Ii%rE 2;5 E b,. DOCKET fil'.CE'!
- ut;CH p C M N *-
CERTIFIED MAIL - RETURN RECEIPT REQUESTED \
g Mr. Joseph M. Hendrie , ifEC5jyg0 9 Chairman of the Nuclear Regulatory Commission y -
1717 H Street, U. W. +
J :
~? a EES y 0624=
'!ashin gton ,
. D. C. 20535 ?j
- . /
Ref: OPS 50-437 f ., 7, /
Sir: ( d On June 15, 1976, I, Ernst J. Ef f enberger, testified in front of the Nuclear Regulatory Commission against Offshore Power Systems from Jacksonville, Fla.
I presented a 9 page. testimony on which I never received an an-swer from the N.R.C.
Since my statement was made in public, I request that you, on be-have o f the N.R. C. , give a public statement answering all the questions which I raised at that time.
This statement shall be made before the H.R.C. considers a manu-facturing license to 0.P.S.
I have one more thought to add to my previous statement: We all know what happened at Three 1111e Island. If the same, or a similar, accident occurs on a floating nuclear platform, how do you propose to contain the nucl ear contamination? It would spread along the coast line and remain there for the next 50,000 years. This was my argument against 0.P.S. in the first place and also the reason I resigned under protest after 3 years of frustration and insults.
I have been blacklisted and ridiculed for the last 6 years because I was trying to save lives. ---
This letter will be an open letT'dF~ '
by ihe .end of March 1.982. '
s c?.;*:': . -
i Very sincerely, 1
4 o
V i...
g# 3 #
5 2 212O201 820129 ADOCK 05000437 H PDR i