Updates Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Safety-related Const Travelers Reviewed to Verify Actual Installation of Tube-Line Supplied Matls.Update on Resolution Expected by 840723
ML20084Q077
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/04/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, IEB-83-06, IEB-83-6, U-0710, U-710, NUDOCS 8405210090
Download: ML20084Q077 (5)


Text

.

g U 0710 0982-L'

]

LO8(IEB83-06)-84 (05 -04 )-L ILLIN0/S POWER 00MPANY OLINTON POWER STATICN. P.o. BOX 678. CLINTON, ILLINOIS 61727 May 4, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect: Clinton Power Station Unit 1 IE Bulletin No. 83-06

Dear Mr. Keppler:

This interim report is an update in response to the subject IE Bulletin addressing the use of nonconforming materials supplied by Tube-Line Corporation. The initial interim report on this IE Bulletin was sent to you in a letter dated December 23, 1983 to James G. Keppler from D. P.

Hall.

Materials supplied to Clinton Power Station by Tube-Line Corporation have been identified. These materials are listed in Attachment #1.

-h Safety related construction travelers are being reviewed to verify the actual installation of Tube-Line supplied. materials. As of this date, 25% of the materials supplied has been located. Review of construction travelers will be an ongoing effort because of continued construction activities.

Nonconformance Reports (NCRs) are being issued and dispositioned as materials are located. Nonconforming materials (not installed and/or removed) are being returned to the vendor.

Illinois Power will provide your office with an update on resolution of IE Bulletin No. 83-06 by July 23, 1984.

Please let-us hear if you have any questions on this matter. I hereby

affirm that the information in this letter is correct to the best of my knowledge.

Sincerely yours,

/

. . Hall.

Vice President KAB: lam .

cc: G. A. Harrison, NRC Clinton Licensing Project Manager gog NRC Resident Office ,

Illinois Department'of Nuclear Safety y g Director - Office of I&E, USNRC, Washington, DC 20555 l 8405210090 840504 MN 141984' i PDR ADOCK 05 COO 461

'O PDR

E ;,,,_. _ . _ . . . . _ _

~

-~ '

4 Date: 4/9/84 TUBELINE MATERIAL TRACKING MATRIX Qty Safety Qty Not Item Material Material Related * . Acetd Acctd Nof Qty Description Type Irff/ Code Yes/No P.O. # R.I.R. No. Req. No NCR/MRT No. For For Rentrks/ Action 1 1 8" L.R. SA 403 AAEJ Yes C33077 S15222 P50709 NCR14133(QC) 1 NCR 14133 Superceded 90* EL GR WP by NCR 15365 Cut into Sch/40 304 W (2) 45' ELS. See Noteft 2 6 3" S.R. SA 403 AADI Yes C34395 S16110 NCR 10121 6 Tagged in Warehause for 90* EL CR WP All Tagged Disposition Sch/40 304 W PW-4 Hold 3 4 4" STD .SA 234 EUYC Yes C38249 S18019 NCR 10121 4 Cap WPB Returned to Vendor MRT 7566 Sch/40 4 2 8" 45' SA 234 EXOG Yes C36469 S17244 NCR 10121 2 Returned to Vendor L. R. ELs WPB MRT 7564 5 12 4" XH SA 234 EZZC Yes C38018 S17932 MCR 10121 CAES Sch/80 WPB 11 (11) Returned to Vendor MRT 7565 PW-4 Hold I (1) On Hold FW-4 6 3 4" Std SA 234 EUYC Yes C38249 S18078 MRT 7566 3 Returned to Vendor CAP Sch/40 WPB 7 1 12" 150# SA 182 ABIA Yes C37770 S17757 NCR 10121 1 To Be Removed R.F. 811nd Tagged in Flange Containment 8 1 12" 150f SA 182 ABXA Yes C37770 S17757 NCR 10121 1 To Be Removed WN FLG Tagged in Sch/40 Contairment 9 18 2" 300# A 105 272425 Yes C14128 18 See Notel2 R.F. SW Dl!N Std Flange e items purchased for safety related use; see last page for all footnotes.

O .

e s

TUBET.INE MATERTAL TRACKINC MATRIX Qty Safety Qty Not Item Material Material Related Acctd Acctd Nof Qty Description Type iffi/ Code Yes/No P.O. I R.I.R. No. Req. No NCR/MPT No. For For Remarks / Action .

10 64 2" 300f R.F. A-105 E1423 DQO Yes C14128 64 Se.e Note #2 SW Std Flange 11 30 2" 300# R.F. A-105 272425A Yes C14128 30 See Note #2 SW Std Flange DJY 12 6 6" Std SR El SA-234 XRS (DNS) Yes 6 See Notef2 WPB 20122 13 14 14" OD 150# SA-181 677206 Yes C06882 51354 None 10 On Hold 10 4 10 In Warehouse WN FF Flange CR II PIL QC Hold Area 14 1 16" 90* EL SA-234 COR130044 Yes C06882 S1354 None No QC 1 See Note #3 3/8" wall WPB Involvement thk. At Issue 15 4 16" 90* El SA-234 CER 319113 Yes C06882 S1354 P-04362 No QC 4 See Notti) 3/8" vall WPB Involvement thk. At Issue 16 2 8" 150f WN FF A-105 85890 Yes C06882 S1354 None No QC 2 See Notef3 FLC Sch/40 involvement At Issue 17 15 6" 150# WN FF SA-105 COP 40575 Yes C06882 S1354 None (13) NCR 14146 1 14 One Installed and Tagged; FLC Sch/40 P16117(1) Investigation Continues P16580(1)

I'8 4 18" 45' El SA-234 CIM 154568 Yes Coc882 S1354 P12384(2) QC/NCR13965 2 Installed WPB None (2) NCH 14041 2 In Warehouse 2 On Hold, Investigation Continues PIL, QC lloid 4 Area

M-7 TUBELINE MATERIAL TRACRING MATRIX Qty Safety Qty Not Item Haterial Material Related Acctd Acctd No# Qty Description Type I:Tf/ Code Yes/No P.O. # R.I.R. No. Req. No NCR/HRT No. For For Remarks / Action 19 2 8" 150f WN SA-181 CCS 83925 Yes C06882 S1354 None No QC 2 RP Fig CR II See hotef3 Involvement At Issue 20 12 18" STD LR A-234 CIM 154568 Yes C06882 S1354 None on Hold, PII. 6 6 For 6 (Qty Not Acct'd 90* EL QC Ho13 Area. For) See Note #3 NCR 14162.

No QC Involve-ment At Issue NCR 14163 NCR 14110 NCR 14108 NCR 14091 21 2 14"STD SR A-234 C0J 134587 Yes C06882 S1354 None No QC 2 See Notef3 90* EL 3/8" Involvement veld thk. At Issue 22 4 18" STD SR A-234 OPH 1431tJ . ts C06882 51354 None(2) No QC 2 2 For 2 (yty Not Acct'd 90* FL 3/8" P10197(1) QC, 14086 For) See Notef3 wall thk P21096(1) QC, 23 4 14"X] 4"xt," A-234 CLE 250847 Yes C06882 S1354 None No QC 4 See Note #3 STD Red Tee Involvement At Issue

~~

24 10 14" STD 45' A-234 CQG 131139 Yes C06882 S1537 None(4) NCR 14075 2 8 one Tagged / Installed EL P-4500(1) One In Warehouse, P-12935(4) Investigation Continues (1) In PIL, QC Hold Area 25 1 24" X 16" SA-734 Yes S1726 None ECC Red Tee WPB COA 811016 No QC 1 See Notef3 C06882 Involvement At Issue

Y.,. ._. ._ . , _ - -- - -- - ---

=

T TUBELINE MATERIAL TRACKING MATRIX Qty Safety Qty Not item Haterial Material Related Acctd Acctd Nof Qty Description Type IITf/ Code Yes/No P.O. # R.I.R. No. Req. No NCR /MRT No. For For Remarks / Action 26 16 3/4" 90* EL SA-403/ AAWV Yes C25176 S18516 See Notef4 16 Hose P/N 79184 Sch/10 LR 304 E76405 Hose S/N C31 thru 016 27 12 2" 60GI R.F. SA-105 EHE MRT 6992 12 Returned to Vendor SW Fig 28 12 2 1/2" STD A-234 ERXK No C39025 N-18343 None Non-Safety 12 See Notef3 L.R. 90* EL No QC 29 15 6" 150f SA-181 CCP Yes C06882 S1354 P-4452 No QC 3 12 WN RF Fig CR II 83935 P-6672 QC P-14592 QC P-17147 QC NCR 14065 NCR 14066 NCR 14064 30 2 14"X6" STD SA-106 CTD Yes C06882 S2085 P-13830 QC (one)  ! I One in Warehouse Red Tee One in PIL QC lloid Area Notef! - Installed; investigation Continues.

Note #2 - Part of D.C. Air Starc Piping purchase order in process of being tagged for appropriate disposition.

Notef3 - Believed to have been issued for installation in a non-safety system. Will continue to investigate.

Notef4 - Ells used by Metal Bellows Corp to fab. flex hose assemblies.