Confirms Util Preparedness for NRC Environ Qualification Audit Currently Scheduled for Jan 1983.Proposed Audit Schedule Requested.Seismic Qualification Review Team Audit Tentatively Scheduled for Mar 1983
ML20065S765
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/25/1982
From: Geier J
ILLINOIS POWER CO.
To: Thomas C
Office of Nuclear Reactor Regulation
References
U-0569, U-569, NUDOCS 8211020009
Download: ML20065S765 (1)


Text

,

U-0569

/LLINDIS POWER 00MPANY N95-82(10-2-)-6 iP 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 October 25, 1982 Mr. Cecil O. Thomas, Chief Standardization & Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Thomas:

References:

(1) NRC Memorandum dated May 18, 1982,. J. H. Williams to H. Bernard, " Meeting with Illinois Power Company on Equipment Qualification of Safety-Related Equipment" (2) Illinois Power Letter.U-0513 dated July 16, 1982, G. E. Wuller to H. Bernard, "Clinton Power Station Unit 1 Docket No. 50-461" Clinton Power Station Unit 1 Environmental Qualification and Seismic Qualification Review Team' Audits This is to confirm Illinois Power's preparedness for an Environmental Qualification audit by the NRC, as currently scheduled by Reference (1), for January, 1983. The week of January 17, 1983, is suggested. Please provide a proposed I schedule for this audit.

The Seismic Qualification Review Team (SQRT) audit is tenta-

tively scheduled for March, 1983. It appears that the eighty-five percent equipment installation criteria will not be satisfied by this date. Further, it is not yet clear when these criteria can be met. Information summaries will continue to be submitted in FSAR Sections 3.9 and 3.10, and seismic / dynamic qualification i packages will be completed on a high priority basis. You will be kept advised of progress in this regard.

Should you have any questions concerning the above, please contact me or J. F. Hampton, (217) 424-7008. I Sincerely, oVB c(Lau-J. D. Geier, Manager Nuclear Station Engineering MED'H:dl cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector Illinois Department of Nuclear Safety 8211020009 821025 PDR ADOCK 05000461 A PDR