Nine Mile Point Nuclear Station - NRC Evaluated Emergency Preparedness Exercise - Inspection Report 05000220/2017502 and 05000410/2017502
ML17332A091
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 11/27/2017
From: Raymond McKinley
Plant Support Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
McKinley R R
References
IR 2017502
Download: ML17332A091 (8)


Text

November 27, 2017

Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: NINE MILE POINT NUCLEAR STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000220/2017502 AND 05000410/2017502

Dear Mr. Hanson:

On October 26, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the October 24, 2017, evaluated emergency preparedness exercise at the Nine Mile Point Nuclear Station. On October 26, 2017, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report. The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA/ Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69

Enclosure:

NRC Inspection Report No. 05000220/2017502; 05000410/2017502

cc w/encl: Distribution via ListServ S. O'Neill, RAC Chair, FEMA Region II

ML17332A091 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME JAmbrosini ADimitriadis RMcKinley DATE 11/20/17 11/22/17 11/27/17 1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket Nos.: 50-220 and 50-410 License Nos. DPR-63 and NPF-69

Report Nos. 05000220/2017502 and 05000410/2017502

Licensee: Exelon Generation Company, LLC

Facility: Nine Mile Point Nuclear Station, LLC Units 1 and 2

Location: Oswego, NY Dates: October 23 - 26, 2017

Inspectors: J. Ambrosini, Sr. Emergency Preparedness Inspector, Division of Reactor Safety (DRS) J. DeBoer, Emergency Preparedness Inspector, DRS B. Fuller, Senior Operations Engineer, DRS J. Schoppy, Senior Reactor Inspector, DRS

Approved By: Raymond McKinley, Chief Plant Support Branch 1 Division of Reactor Safety

2

SUMMARY

Inspection Report 05000220/2017502 and 05000410/2017502; 10/23-26, 2017; Nine Mile Point Nuclear Station; Exercise Evaluation, Exercise Evaluation - Scenario Review, Performance Indicator Verification.

This was an announced inspection conducted by four Region I-based inspectors. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6.

No findings were identified.

Cornerstone: Emergency Preparedness

No findings were identified.

3

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

On October 24, 2017, Exelon conducted a biennial emergency preparedness (EP)exercise at the Nine Mile Point Nuclear Station. The NRC inspectors evaluated the adequacy of Exelon's conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

To evaluate the exercise, the inspectors reviewed: The adequacy of Exelon's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b)(4), (5), (9), and (10), which include: emergency classification, offsite notification, radiological assessment, and onsite and public protective action recommendations, respectively.

The overall adequacy of Exelon's emergency response facilities with regard to Nine Mile Point emergency plan commitments. The inspectors assessed the following facilities: the simulator control room, the technical support center, the operations support center, and the emergency operations facility.

Exelon's performance in other areas, such as: the emergency response organization's (ERO) recognition of abnormal plant conditions, command and control, communications both within and between facilities, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the Nine Mile Point emergency plan and its implementing procedures.

A review of past performance issues from the last biennial exercise inspection report and Exelon's EP drill reports, to determine the effectiveness of corrective actions as demonstrated during the October 24, 2017, exercise and to ensure compliance with 10 CFR 50.47(b)(14), which requires licensees to conduct periodic drills and exercises and to correct any deficiencies identified.

The post-exercise critiques, to evaluate Exelon's self-assessment of its ERO performance during the October 24, 2017, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. Documents reviewed for each section of this inspection report are listed in the Attachment.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the October 24, 2017, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Nine Mile Point emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

b. Findings

No findings were identified.

OTHER ACTIVITIES (OA)

4OA1 Performance Indicator Verification (71151 - 3 Samples)

a. Inspection Scope

The inspectors reviewed data for the Nine Mile Point EP Performance Indicators (PI), which are: (1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02); and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Nine Mile Point was conducted in the July 2016, so the inspectors reviewed supporting documentation from EP drills and tests from the second calendar quarter of 2016 through the second calendar quarter of 2017, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7. This inspection activity represented the completion of three samples.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

On October 26, 2017, the inspectors presented the results of this inspection to Mr. Peter Orphanos, Site Vice President and other members of Exelon's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

P. Orphanos, Nine Mile Point Site Vice President
V. Cwietniewicz, Exelon Mid-Atlantic Emergency Planning Manager
K. Yurkon, Nine Mile Point Emergency Planning Manager

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

None

LIST OF DOCUMENTS REVIEWED

Section 1EP1: Exercise Evaluation

EP-AA-1000, Exelon Nuclear Standardized Emergency Plan, Revision 028
EP-AA-1013, Radiological Emergency Plan Annex for Nine Mile Point Station, Revision 3
Nine Mile Point Emergency Plan implementing procedures Nine Mile Point October 24, 2017, Emergency Preparedness Exercise Scenario Package

Condition Reports

2730920
2731035
2697459
2699307
2708412
4013634
4013614
4019370
4013624
3950707
3950702
3950703
3950864
3951911
3954739
3954742
3951911
3954739
4066798
4066887
4066844
4066867
4066717
4066786
4066788
4066789
4066803
4066818
4066829
4066838
4066842
4066855
4066859
4066881
4066885
4066912
4066913
4066919
4066930
4066946
4066955

Section 1EP8: Exercise Evaluation - Scenario Review

EP-AA-1000, Exelon Nuclear Standardized Emergency Plan, Revision 028
EP-AA-1013, Radiological Emergency Plan Annex for Nine Mile Point Station, Revision 3
Nine Mile Point Emergency Plan implementing procedures Nine Mile Point October 24, 2017, Emergency Preparedness Exercise Scenario Package

Section 4OA1: Performance Indicator (PI) Verification

ANS PI data, April 2016 - June 2017
DEP PI data, April 2016 - June 2017
ERO Drill Participation PI data, July 2016 - June 2017

LIST OF ACRONYMS

ADAMS Agencywide Documents Access and Management System
ANS Alert Notification System
CFR Code of Federal Regulations
DEP Drill and Exercise Performance
EOF Emergency Operations Facility
EP Emergency Preparedness
ERO Emergency Response Organization
NEI Nuclear Energy Institute
NRC Nuclear Regulatory Commission
PI Performance Indicator