Midcycle 2005 Performance Review and Inspection Plan - San Onofre Nuclear Generating Station
ML052430127
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/30/2005
From: Troy Pruett
NRC/RGN-IV/DRP
To: Ray H
Southern California Edison Co
References
Download: ML052430127 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 30,2005 Harold 9. Ray, Executive Vice President San Onofre, Units 2 and 3 Southern California Edison Co.

P.O. Box 128, Mail Stop D-3-F San Clemente, CA 92674-0128

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

SAN ONOFRE NUCLEAR GENERATING STATION Dear Mr. Ray On August 3, 2005, the NRC staff completed its performance review of San Onofre for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIS) for the most recent quarter and inspection results over the previous 12 months.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility in order for you to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Proprietary Information in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at San Onofre Nuclear Generating Station Units 2 and 3 was within the License Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIS indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility through March 31,2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. In addition to the baseline inspections, NRC will also be conducting inspections related to Temporary Instruction (TI) 2515/150, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02), TI 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors, and TI 2515/161, Transportation of Reactor Control Rod Drives in Type A Packages. The inspection plan is provided to minimize the resource impact on your staff and to allow for the early resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle meeting.

Southern California Edison Company In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.sov/readincr-rm/adams.html (The Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8173 with any questions you may have regarding this letter or the inspection plan.

Si TToy W. Pruett, Chief Project Branch D Division of Reactor Projects Dockets: 50-361 50-362 Licenses: NPF-10 NPF-15

Enclosure:

San Onofre Nuclear Generating Station Inspection/Activity Plan cc wlenclosure:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522

Southern California Edison Company Raymond Waldo, Vice President, Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Douglas K. Porter, Esq.

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

Southern California Edison Company Daniel P. Breig, Station Manager Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 A. Edward Scherer Southern California Edison Company San Onsfre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Brian Katz, Vice President, Nuclear Oversight and Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

K u) u)

C In K u)

C In K In K

.-0

. I c

0 .-0

. I c

0 .-0

. I-

.-0 0

a, 0

a, Q

0 a,

a u) 0 8

0 a,

a H

-3 Q

u) u)

- C -K u)

- u)

C 2 - u)

C a,

3

- In K C

-a, .-E -ea, -Inx u)

-x 07 u)

C

_. .- c a,

K

.-- c 0

C ij5735 a,

u) m P a, u) sm Pm sm Pm a, u) z z z z m m m

m m

  • m
  • m m m

m r n m m m m m m m (D (D (D 0 0 0 0 0 0 0 0 0 0 0 0 s2 x9 0 0 0 0 0 0 0 0 0 0 N N N N S i = $ & 2 2 s9 x 0 2

0 c!

z s x T-(D s Os Na Ns O

- 7 - v 0 z c!

T- 2 c!

m 0

r A

0 0 m m m m m m m m m (D (D co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N A h G G 2  :

s 9z s-s s.

c!

0 c!

x s 0 0 0 N

0 2

9ec!c!

z e e z 0 e  ?

2 9

v 0

0 7

A 0

x 0

9 N N r r r r r m

?

4 rx W

n rx 0

0 rx 5

u)

-a, u) a, 0 M

m z Y

m0 K

.-0 d c

!?

a c a,

a E

I-" a" u)

'0 m

.-K m P-a, VI I I I 5 sw sw sw sw >I U C m

m m m m m m m m m m m m m m m

u) u)

C C u) u) u) u)

C K K C c

0 .-

c 0 0 c .-

c 0 .-c0 .-0 0 0 c 0 0 0 0 8 a, Q

u)

S S S S D D D D B a, a, a

m a,

- S u)

-C m m

.o .o m m

.I! .o -m S

Q u)

C - C -

Q u)

S a,

K

.-- .--E E-E-5.E-Q Q Q Q -a, K

.- -a, S

.-a, C

-E 2m a a a a a,

u) m c c 0 5 5 a,

u) m 8 m 8m 2m m m P z z z m m m m (D (D (D r- b

-2 0 (D 0

0 0 0 0 0 0 0 0 s s 0 0 c!

0 2

0 N

z 7

-r c!

b T

Y s

0 m

i;j 0

(D (D (D W

.s 0 0 b b 0 0 0 0 0 0 0

s? 0 x

0 0 s sx N

c!

b r

s 0

s 0 2 T-T r

m 0 0 m

w 9

n:

ct 0

0 ct z u) a, 30 z

C c

0 a

h c

Ea, a

U m

a, I

u) 8 U C m

U m

I"

Southern California Edison Company Electronic distribution by RIV:

Regional Administrator (BSMI )

DRP Director (ATH)

DRS Director (DDCj DRS Deputy Director (KMK)

Senior Resident Inspector (CCOI)

Branch Chief, DRP/D (TWP)

Senior Project Engineer, DRPlD (NFO)

Team Leader, DRP/TSS (RLNI)

RlTS Coordinator (KEG)

V. Dricks, PA0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (LJS, MPSl, REL, NFO)

S. Richards, Chief, NRR/DIPM/IIPB (SAR)

M. Case, Deputy Dir. for Inspection and Programs (MJC) 6.Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. Bergman, Chief, ROPMS, OED0 (TAB)

H. Berkow, Director, LPD4, NRR/DLPM (HNB)

D. Terao, Chief, PDIV-2, NRRlDLPM (DXT)

B. Pham, NRR Project Manager (BMP)

SlSP Review Completed: -TVVP- ADAMS: J Yes 0 No Initials: T W P -

J Publicly Available 0 Non-Publicly Available 0 Sensitive J Non-Sensitive S:\DRP\DRPDIR\MIDCYCLE 2005\SO.w~d NHTaylor;df TWPruett DDChamberlain ATNO~C$I TWPruett

/RA/ /RA/ KMK for OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax