Midcycle Performance Review and Inspection Plan - San Onofre Nuclear Generating Station
ML062430669
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/31/2006
From: Troy Pruett
NRC/RGN-IV/DRP/RPB-D
To: Rosenblum R
Southern California Edison Co
References
Download: ML062430669 (7)


Text

UNITED STATES NU CLEAR REGULATORY C 0 M M I S S I O N REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 31,2006 Richard M. Rosenblum Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

SAN ONOFRE NUCLEAR GENERATING STATION

Dear Mr. Rosenblum:

On August 9, 2006, the NRC staff completed its performance review of San Onofre for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security Related Information will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at San Onofre was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, including Temporary Instructions, except those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readincvrm/adams.html(the Public Electronic Reading Room).

Southern California Edison Company If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8173 with any questions you may have regarding this letter or the inspection plan.

Troy W. Pruett, Chief Project Branch D Division of Reactor Projects Dockets: 50-36 1 50-362 Licenses: NPF-10 NPF-15

Enclosure:

San Onofre Nuclear Generating Station I nspect io n/Activity PIan cc w/

Enclosure:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Assistant Director-Resources City of Riverside 3900 Main Street Riverside, CA 92522 Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Ray W. Waldo Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28

Southern California Edison Company David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company 8315 Century Park Ct. CP21 G San Diego, CA 92123-1548 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Douglas K. Porter, Esq.

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28

Southern California Edison Company A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Brian Katz Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Southern California Edison Company Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (CCOI)

Branch Chief, DRP/D (TWP)

Senior Project Engineer, DRP/D (GEW)

Team Leader, DRP/TSS (RLNI)

RlTS Coordinator (KEG)

V. Dricks, P A 0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPSI)

B. Wetzel, Chief, TRPS, O E D 0 (BAW)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

N. Kalyanam, NRR Project Manager (NXK)

SUNS1 Review Completed: -TWP- ADAMS: J Y e s 0 No Initials:-TWP-J Publicly Available 0 Non-Publicly Available 0 Sensitive J Non-Sensitive OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

m C m C m C m C m C

.P

.o I

.P .o

- I c

0 0 0 0 0 0 w

Q w Q a , wQ R W Q

m m

-C -C - -

m C m C

-mC

-E -E w a ,

.E .E .-WC Im  %

m

%m %m W m

m m m m m wco w w w w w w 0 0 0 0 W 0

0 0 0 0 2s 0

s2 0 0

$ 2 clc!

0 0

N T-0 0 0 0 N N N N iijiijziij

- - . i -

0 0 m m 0 0 s

0 s s s s 0 0 0 0 U

m w w w w S 0 0 0 0 W 0

z; C t 0

$ g 0 -

0 0 c- ! m em -s 0

c!

0 N

3 9

0 0 m 0

c d r r m 10 N N N r N

0 0

s N

cc

! I 0

cc W

2 W

(-9 V

11:

z a,

m Y

m 0

5 Q

5 v)

_I a

c 0

-z n a

F LI: F I I I I I m m m a m

mcoln 0 N 0 2 2

-- t m m m 0 N

in m m m N "

0 0 0 b!

I-? x x x E a m P 0

m m m m m m m m 0 m m m m m m m m m m N- N- N- N' N- N- N- N- N N N- N- N- N- N- N-

m C m m m In c c c

.-0 0

g .g .g 0 0 0 c

0 B m m a ,

a a a m m m aR , Qr uRa r. u0 a, a

c m

C C K m m m m

.o .o .o .o -C a, E E 5 . E a,

-a,

.- a a a a a a a a -a,

...I...-

m 0 0 0 0 m m z z z z m 0b b b b b b b b 0 0 0 0 0 0 0 b 0

xe!

0 0

$230 F Q c !

0 0 0

- 7 z0 z0 a 0

- r 0

z 0

2?

m 0 u

  • u 0 0 0 0 0 r b l - b b b

0 0 0 0 0 6 s

0 0 0 0 0 0 N N N N N r

2533 .

?

N l

i;i 0

z z a a 0 0 0 0 0

T-N r N C D m m m r r m

a, m

c m

c 0

r zi:

c 0

i=

C s

.-c L

...ui 0

0

!EL m

a, F

>,0

...m

.-0 ui a,

m U

m r

-c c N o

c c

Z z z k k c 0

a 0

a, 2

3 3 3 8z z8 -c

.-0 m

2 m ii K2 (31 3

I-4 I I-m m m m m m m m m m m 0 m m m m m N- N' N' N- N- N- N- N- N- N N N- N' N- N- N- N