ML033230160

From kanterella
Jump to navigation Jump to search
Lt 05000361 - Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML033230160
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/17/2003
From: Chamberlain D
Division of Reactor Safety IV
To: Ray H
Southern California Edison Co
References
Download: ML033230160 (5)


Text

November 17, 2003 Harold B. Ray, Executive Vice President San Onofre, Units 2 and 3 Southern California Edison Co.

P.O. Box 128, Mail Stop D-3-F San Clemente, CA 92674-0128

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr. Ray:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch Plant Support Branch Engineering & Maintenance Branch

 Operator licensing  Security  Safety System Design and

 Identification and  Radiological Performance Capability Resolution of Controls  Permanent Plant Problems (PI&R)  Emergency Modifications Preparedness  Inservice Inspection Activities

 Evaluation of Changes, Tests or Experiments

 Fire Protection

 Heat Sink Performance

 Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch Performance Evaluation Branch

 Initial Operator Licensing  PI&R Lead Responsibility

 Operator Requalification Program  Fire Protection

 Emergency Preparedness  Heat Sink Performance

 PI&R Support  Maintenance Effectiveness

Southern California Edison Engineering Branch Plant Support Branch

 Safety System Design and  Security Performance Capability  Radiological Controls

 Permanent Plant Modifications  PI&R Support

 Inservice Inspection Activities

 Evaluation of Changes, Tests or Experiments

 PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15 cc w/enclosure:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.

Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522

Southern California Edison Joseph J. Wambold, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Ed Bailey, Radiation Control Program Director Radiologic Health Branch California Department of Health Services P.O. Box 942732 (MS 178)

Sacramento, CA 94234-7320 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814 Douglas K. Porter, Esq.

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

Southern California Edison Dr. Raymond Waldo Southern California Edison Company San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, CA 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

Southern California Edison Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (CCO1)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:

  • Yes
  • No Initials: ______
  • Publicly Available
  • Non-Publicly Available
  • Sensitive
  • Non-Sensitive C:EMB C:OB C:PSB C:PBC D:DRS CSMarschall/lmb ATGody TWPruett KKennedy DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/

11/13/03 11/10/03 11/13/03 11/14/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax