ML17235B175

From kanterella
Revision as of 05:22, 4 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

NRR E-mail Capture - Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702
ML17235B175
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/23/2017
From: Siva Lingam
Plant Licensing Branch IV
To: Sweet S
Entergy Nuclear Operations
References
MF9752
Download: ML17235B175 (3)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Wednesday, August 23, 2017 2:30 PM To: Sweet, Sheryl Cc: Pascarelli, Robert; Rudland, David; Cheruvenki, Ganesh; Sheng, Simon; Neve, Douglas A

Subject:

Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702 (CAC No. MF9752)

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the subject relief request, and has determined that additional information is required to complete the review. We transmitted the draft request for additional information (RAI) to you by e-mail on August 3, 2017, and you clarified on August 23, 2017, that no clarification call is required. Please note the following official RAI for the subject relief request, and provide your response within 30 days from the date of this e-mail. Your timely response will allow the NRC staff to complete its review on schedule.

By letter dated May 25, 2017 (Agencywide Documents Access and Management System Accession No.

ML17145A321), Entergy Operations, Inc. (the licensee), requested an alternative to the inspection program for the fourth ten year in-service inspection (ISI) interval for Grand Gulf Nuclear Station (GGNS). The proposed relief request alternative is related to the required examinations on the nozzle-to-vessel welds and nozzle inner radius sections using American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-702, Alternative Requirements for the Boiling Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds, Section, XI, Division 1.

In the May 25, 2017, submittal, the licensee stated that the subject nozzles inside radius sections will be inspected during the fourth ISI interval using either visual testing (VT-1) or ultrasonic testing (UT) technique. The requirements for VT-1 examinations on the nozzle inner radius are addressed in ASME Code Case N-648-1, Alternative Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles,Section XI, Division 1. The staffs conditional approval of this Code Case is addressed in Revision 17 of Regulatory Guides 1.147, In-service Inspection Code Case Applicability, ASME Section XI, Division 1. The staffs condition is: In lieu of a UT examination, licensees may perform a VT-1 examination in accordance with the code of record for the ISI Program utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. For all past approved ASME Code Case N-702 applications, the licensees proposed either UT or VT-1 based on ASME Code Case N-648-1.

In May 25, 2017, submittal, however, the licensee did not invoke ASME Code Case N-648-1 for the fourth ISI interval at GGNS. In this context, the NRC staff requests that the licensee respond to the following RAI:

RAI-1

If the licensee chooses to implement VT-1 in lieu of UT, please confirm that all the requirements addressed in ASME Code Case N-648-1 and the NRC staffs condition associated with this Code Case is met for the fourth ISI interval at GGNS.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4)

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station, Unit 1 Location: O9-H10; Mail Stop: O9-E3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

2 Hearing Identifier: NRR_PMDA Email Number: 3687 Mail Envelope Properties (Siva.Lingam@nrc.gov20170823143000)

Subject:

Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702 (CAC No. MF9752)

Sent Date: 8/23/2017 2:30:21 PM Received Date: 8/23/2017 2:30:00 PM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Rudland, David" <David.Rudland@nrc.gov>

Tracking Status: None "Cheruvenki, Ganesh" <Ganesh.Cheruvenki@nrc.gov>

Tracking Status: None "Sheng, Simon" <Simon.Sheng@nrc.gov>

Tracking Status: None "Neve, Douglas A" <dneve@entergy.com>

Tracking Status: None "Sweet, Sheryl" <Sheryl.Sweet@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3152 8/23/2017 2:30:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: