NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions
ML23240A341
Person / Time
Site: Grand Gulf, Arkansas Nuclear, River Bend  Entergy icon.png
Issue date: 08/28/2023
From: Siva Lingam
NRC/NRR/DORL/LPL4
To: Couture P
Entergy Nuclear Operations
References
L-2023-LLA-0101
Download: ML23240A341 (3)


Text

From: Siva Lingam Sent: Monday, August 28, 2023 9:36 AM To: Couture III, Philip Cc: Jennifer Dixon-Herrity; Tarico Sweat; Thomas Wengert; Jason Drake; NORRIS, GREGORY P; Mahan, Cecil

Subject:

ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions (EPID L-2023-LLA-0101)

By letter dated July 27, 2023 (Agencywide Documents Access and Management System Accession No. ML23208A211), Entergy Operations, Inc. submitted a license amendment request (LAR) to revise Technical Specifications (TSs) to adopt Technical Specification Task Force (TSTF) Traveler TSTF-205-A, Revision 3, "Revision of Channel Calibration, Channel Functional Test, and Related Definitions" for Arkansas Nuclear One, Unit 2 (ANO-2), Grand Gulf Nuclear Station (Grand Gulf) and River Bend Station (River Bend). The proposed amendments would revise ANO-2, Grand Gulf, and River Bend TS definitions for CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST. In addition, TS definition of LOGIC SYSTEM FUNCTIONAL TEST would be revised for Grand Gulf and River Bend.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review for the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review by August 26, 2024, or earlier. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, or unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1564.

Siva P. Lingam

U.S. Nuclear Regulatory Commission Project Manager Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station Entergy Fleet Location: O-9E22; Mail Stop: O-9E03 Telephone: 301-415-1564 E-mail address: Siva.Lingam@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 2213 Mail Envelope Properties (SJ0PR09MB610920EA15FF0C123D8F35D5F6E0A)

Subject:

ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions (EPID L-2023-LLA-0101)

Sent Date: 8/28/2023 9:36:05 AM Received Date: 8/28/2023 9:36:00 AM From: Siva Lingam Created By: Siva.Lingam@nrc.gov Recipients:

"Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Tarico Sweat" <Tarico.Sweat@nrc.gov>

Tracking Status: None "Thomas Wengert" <Thomas.Wengert@nrc.gov>

Tracking Status: None "Jason Drake" <Jason.Drake@nrc.gov>

Tracking Status: None "NORRIS, GREGORY P" <GNORRIS@entergy.com>

Tracking Status: None "Mahan, Cecil" <cmahan@entergy.com>

Tracking Status: None "Couture III, Philip" <pcoutur@entergy.com>

Tracking Status: None Post Office: SJ0PR09MB6109.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3228 8/28/2023 9:36:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: