ML17319B048
From kanterella
Revision as of 00:18, 24 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17319B048 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 09/10/1981 |
From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | |
Shared Package | |
ML17319B047 | List: |
References | |
NUDOCS 8109150437 | |
Download: ML17319B048 (157) | |
Similar Documents at Cook | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999
[Table view]Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23 Category:TEST REPORT MONTHYEARML17326A1471999-05-28028 May 1999
[Table view]Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17331A0531992-09-30030 September 1992 Reactor Containment Bldg Integrated Leakage Rate Unit 1. ML17331A0541992-05-31031 May 1992 Reactor Containment Bldg Integrated Leakage Rate Unit 2. ML17334B3951991-02-22022 February 1991 DC Cook Nuclear Plant Unit 2,Cycle 8 Startup Rept. W/ 910222 Ltr ML19325D6071989-06-30030 June 1989 Reactor Containment Bldg Integrated Leakage Rate. ML17328A1431989-02-28028 February 1989 Reactor Containment Bldg Integrated Leakage Rate,Feb 1989 for DC Cook Nuclear Plant Unit 2. W/890908 Ltr ML17324A5791985-12-0404 December 1985 Reactor Containment Bldg Integrated Leak Rate Test. ML17321A1811984-12-31031 December 1984 Summary of Type B & C Leak Rates, for 1984 ML17321A1821984-06-30030 June 1984 Reactor Containment Bldg Integrated Leak Rate Test. ML20090J5601984-03-23023 March 1984 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) ML17334A5591983-12-16016 December 1983 Ampacity Test for Power Cables. ML17333A8221983-04-0505 April 1983 Ampacity Test for Power Cables in Randomly-Filled Trays. ML17326A9531982-08-0202 August 1982 Reactor Containment Bldg Integrated Leak Rate Test, 810713-30. ML17324A9211982-02-28028 February 1982 Qualification Test Program for Terminal Blocks,Nuclear Environ Qualification. Supporting Documentation Encl ML17319B0481981-09-10010 September 1981 Reactor Containment Bldg Integrated Leak Rate Test, 810430-0504 ML17320B0881981-07-0707 July 1981 Rept of Test for Seismic & Environ Testing of Mercoid Pressure Switches for American Electric Power Svc Corp. ML17325A8591980-09-0202 September 1980 Qualification Tests of Coaxial-Type Cables in Simulated Steam Line Break & LOCA Environ. ML17321A3401980-04-14014 April 1980 Rev a to Nuclear Environ Qualification Test Rept on Agastat E7000 Series Timing Relays. ML17326A4711979-12-31031 December 1979 Experimental Investigation of Air Entrainment at Reactor Containment Sump Due to Break & Drain Flows. ML19268C0821979-11-19019 November 1979 Dynamic Evaluation Test Program on Safety Injection Sys Panel,Auxiliary Relay Panel & Hot Shutdown Panel. ML20197C9751978-11-14014 November 1978 Reactor Containment Bldg Integrated Leak Rate Test, 780527-29 Covers Acceptance Criteria,Ilrt Test Results,Test Conduct,Instr & Equip Containment Model & Leak Rate Calculations,Ilrtest Prog Printout & Analysis ML17320A5811978-10-26026 October 1978 Seismic Simulation & Radiation Test Program on Seven Pressure Switches. ML17318A5091978-10-26026 October 1978 Seismic Simulation & Radiation Test Program on Seven Pressure Switches. ML20197A4811978-09-19019 September 1978 Startup Test Rept for Subj Facil Describing Startup/Testing Activities:Initial Core Loading,Initial Criticality,Low Pwr Physics Testing & Pwr Ascension Testing Completed Thru 780801 ML20081C0511978-04-10010 April 1978 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) ML17320A6611975-11-30030 November 1975 Qualified Test of Electric Cables Under Simulated Loca/Dbe by Simultaneous Exposure to Environs of Steam/ Chemical-Spray & Radiation. ML20081C0341975-02-26026 February 1975 Reactor Containment Bldg Integrated Leak Rate Test ML17326B4081970-09-23023 September 1970 Issue 2 to Rept on Test on Limitorque Corp SMB-0-25 Valve Operator. 1999-05-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17319B048&oldid=1970857"