Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17326A147 | 28 May 1999 | Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. | Safe Shutdown Earthquake Design basis earthquake |
ML17331A053 | 30 September 1992 | Reactor Containment Bldg Integrated Leakage Rate Unit 1. | Grab sample Environment Report |
ML17331A054 | 31 May 1992 | Reactor Containment Bldg Integrated Leakage Rate Unit 2. | Grab sample |
ML17334B395 | 22 February 1991 | DC Cook Nuclear Plant Unit 2,Cycle 8 Startup Rept. W/ 910222 Ltr | Shutdown Margin |
ML19325D607 | 30 June 1989 | Reactor Containment Bldg Integrated Leakage Rate. | Grab sample |
ML17328A143 | 28 February 1989 | Reactor Containment Bldg Integrated Leakage Rate,Feb 1989 for DC Cook Nuclear Plant Unit 2. W/890908 Ltr | |
ML17324A579 | 4 December 1985 | Reactor Containment Bldg Integrated Leak Rate Test. | Grab sample |
ML17321A181 | 31 December 1984 | Summary of Type B & C Leak Rates, for 1984 | |
ML17321A182 | 30 June 1984 | Reactor Containment Bldg Integrated Leak Rate Test. | |
ML20090J560 | 23 March 1984 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) | |
ML17334A559 | 16 December 1983 | Ampacity Test for Power Cables. | Fire Barrier |
ML17333A822 | 5 April 1983 | Ampacity Test for Power Cables in Randomly-Filled Trays. | Fire Barrier |
ML17326A953 | 2 August 1982 | Reactor Containment Bldg Integrated Leak Rate Test, 810713-30. | Packing leak |
ML17324A921 | 28 February 1982 | Qualification Test Program for Terminal Blocks,Nuclear Environ Qualification. Supporting Documentation Encl | FLEX Weak link |
ML17319B048 | 10 September 1981 | Reactor Containment Bldg Integrated Leak Rate Test, 810430-0504 | |
ML17320B088 | 7 July 1981 | Rept of Test for Seismic & Environ Testing of Mercoid Pressure Switches for American Electric Power Svc Corp. | |
ML17325A859 | 2 September 1980 | Qualification Tests of Coaxial-Type Cables in Simulated Steam Line Break & LOCA Environ. | Anchor Darling FLEX |
ML17321A340 | 14 April 1980 | Rev a to Nuclear Environ Qualification Test Rept on Agastat E7000 Series Timing Relays. | Design basis earthquake |
ML17326A471 | 31 December 1979 | Experimental Investigation of Air Entrainment at Reactor Containment Sump Due to Break & Drain Flows. | |
ML19268C082 | 19 November 1979 | Dynamic Evaluation Test Program on Safety Injection Sys Panel,Auxiliary Relay Panel & Hot Shutdown Panel. | |
ML20197C975 | 14 November 1978 | Reactor Containment Bldg Integrated Leak Rate Test, 780527-29 Covers Acceptance Criteria,Ilrt Test Results,Test Conduct,Instr & Equip Containment Model & Leak Rate Calculations,Ilrtest Prog Printout & Analysis | |
ML17320A581 | 26 October 1978 | Seismic Simulation & Radiation Test Program on Seven Pressure Switches. | Earthquake |
ML17318A509 | 26 October 1978 | Seismic Simulation & Radiation Test Program on Seven Pressure Switches. | |
ML20197A481 | 19 September 1978 | Startup Test Rept for Subj Facil Describing Startup/Testing Activities:Initial Core Loading,Initial Criticality,Low Pwr Physics Testing & Pwr Ascension Testing Completed Thru 780801 | |
ML20081C051 | 10 April 1978 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) | |
ML17320A661 | 30 November 1975 | Qualified Test of Electric Cables Under Simulated Loca/Dbe by Simultaneous Exposure to Environs of Steam/ Chemical-Spray & Radiation. | Boric Acid |
ML20081C034 | 26 February 1975 | Reactor Containment Bldg Integrated Leak Rate Test | |
ML17326B408 | 23 September 1970 | Issue 2 to Rept on Test on Limitorque Corp SMB-0-25 Valve Operator. |