ML072430677

From kanterella
Revision as of 03:02, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mid-Cycle 2007 Report
ML072430677
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 08/31/2007
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML072430670 List:
References
Download: ML072430677 (2)


Text

Page 1 of 2 Robinson 08/31/2007 10:35:34 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FP - INFO TRIP 6 2 IP 7111105T Fire Protection [Triennial] 10/02/2007 10/04/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION INSP 5 2 IP 7111105T Fire Protection [Triennial] 10/22/2007 10/26/2007 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 11/05/2007 11/09/2007 Baseline Inspections PSB1-EP - EP EXERCISE 4 2 IP 7111401 Exercise Evaluation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 12/03/2007 12/07/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/28/2008 02/01/2008 Baseline Inspections 2 IP 7111117B Permanent Plant Modifications 01/28/2008 02/01/2008 Baseline Inspections PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 2 IP 71152B Identification and Resolution of Problems 04/21/2008 04/25/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 2 IP 71152B Identification and Resolution of Problems 06/02/2008 06/06/2008 Baseline Inspections 2 IP 71152B Identification and Resolution of Problems 06/16/2008 06/20/2008 Baseline Inspections EB3-HS - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 06/02/2008 06/06/2008 Baseline Inspections PSB1-EP - EP INSP 1 2 IP 7111402 Alert and Notification System Testing 06/16/2008 06/20/2008 Baseline Inspections 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/16/2008 06/20/2008 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/16/2008 06/20/2008 Baseline Inspections 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2008 06/20/2008 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 06/16/2008 06/20/2008 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 06/16/2008 06/20/2008 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 06/16/2008 06/20/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 07/28/2008 08/01/2008 Not Applicable EB3 - MR - MAINT RULE 1 2 IP 7111112B Maintenance Effectiveness 08/04/2008 08/08/2008 Baseline Inspections PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 08/31/2007 10:35:34 Inspection / Activity Plan Report 22 09/01/2007 - 03/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 4 2 V23285 ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 08/18/2008 08/29/2008 Not Applicable EB3ISI - ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK1 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2008 10/10/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/06/2008 10/10/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK2 3 2 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 Baseline Inspections PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/15/2008 12/17/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC CORNERSTONE 4 2 IP 7112101 Access Control to Radiologically Significant Areas 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 Baseline Inspections OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 03/02/2009 03/06/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.