- PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation (← links)
- PNO-V-92-033, on 921019,US Geological Survey Notified California Governor Ofc of Significant Likelihood That Earthquake of Magnitude 6 Will Occur on San Andreas Fault Near Parkfield (← links)
- PNO-V-86-019, on 860418,unusual Event Declared on Initiation of Shutdown.On 860417,problems W/Computer Info from in-core Instrumentation for Quadrant Power Tilt Ratio Measurement Occurred (← links)
- PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core (← links)
- PNO-V-86-040, on 860709,reactor Tripped Due to Low Level in Steam Generator Coincident W/Steam Flow Feed Flow Mismatch. Caused by Loss of Main Feed Pump.Pump Repaired & post-trip Review Conducted (← links)
- PNO-V-86-038, on 860703,facility Experienced Reactor Trip & Safety Injection Due to Momentary High Steam Flow Coincident w/lo-lo Tavg Signal from solid-state Protection Sys.On 860706,second Turbine & Reactor Trip Experienced (← links)
- PNO-V-87-002, on 870105,reactor Trip/Turbine Trip Occurred. Caused by Loss of Turbine Governor/Stop Valve electro- Hydraulic Sys Pressure,Attributed to Leak in Compression Fitting Connection to Steam Lead Stop Valve FCV-145 (← links)
- PNO-V-87-001, on 870102,licensee Shut Down Plant.Caused by Fire Near High Pressure Turbine Front Bearing.Licensee Affected Repairs & Examining Bearing Area for Any Signs of Oil Leak (← links)
- IR 05000275/1986025 (← links)
- PNO-V-86-062, court Decided in Favor of San Luis Obispo Mothers for Peace & Sierra Club Re Spent Fuel Pool Expansion.Util Reinstalling Old Racks & May Use Spent Fuel Pools Prior to Completion of New Hearings (← links)
- PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks (← links)
- ML20206R448 (← links)
- PNO-V-86-057, reactor Trip Occurred.Caused by Loose Wire on Shunt Coil Relay That Shorted During Surveillance Testing & Opened Reactor Trip Breaker.New High Density Fuel Racks Removed & Older Low Density Racks Reinstalled (← links)
- IR 05000275/1987018 (← links)
- ML20212N782 (← links)
- ML20212N778 (← links)
- ML20212N777 (← links)
- ML20212N773 (← links)
- ML20212N767 (← links)
- ML20212N760 (← links)
- ML20212N746 (← links)
- ML20212N735 (← links)
- IR 05000275/1987004 (← links)
- PNO-V-87-018, on 870301,1-2 Mw/Min Shutdown Initiated to Investigate & Repair Main Generator Hydrogen Coolant Leak. Vibration,Induced by Main Generator,Caused Cracking in Welds of Stator Cooling Water Sys Which Occurred on 870217 (← links)
- IR 05000275/1999012 (← links)
- IR 05000275/1987007 (← links)
- IR 05000275/1987032 (← links)
- PNO-V-87-083, on 871213,reactor Tripped.Caused by Loss of Feed Water Pump 1-1.Cause of Trip Under Investigation. Variety of Maint Activities to Be Performed Before Restart (← links)
- PNO-V-87-082, on 871210,fire Occurred in Temporary Tool Storage Trailer in Vicinity of Unit 2 Main Generator Transformers.Caused by 120 Volt Junction Box,Possibly Overloaded from Portable Space Heater.Fire Put Out (← links)
- ML20249B193 (← links)
- ML20249A895 (← links)
- ML20249A665 (← links)
- ML20249A011 (← links)
- ML20248J052 (← links)
- ML20248F201 (← links)
- ML20245E966 (← links)
- IR 05000275/1989012 (← links)
- IR 05000323/1987039 (← links)
- ML20236U106 (← links)
- IR 05000275/1998011 (← links)
- PNO-V-87-074, on 871110,county Inadvertently Actuated Emergency Notification Sys(Sirens).Caused by Wrong Sequence Being Entered Into Sys While Performing Weekly Silent Test. Corrective Action Under Investigation (← links)
- PNO-V-87-073, on 871107,unit Trip Manually Initiated.Caused by Failure of motor-operated Disconnect in Main Generator 25 Kv Isophase Bus C.Repair & Unit Outage Will Take Between 2 Wks & 2 Months,Depending on Availability of Parts (← links)
- ML20236F461 (← links)
- ML20236F172 (← links)
- PNO-V-87-053, on 870723,high Radiation Alarm Automatically Diverted Liquid Radwaste Flow to Storage Tank.Licensee Determining Root Cause.Chemical Drain Tank Properly Recirculated & Sampled Prior to Discharge Per Procedure (← links)
- PNO-V-87-066, on 871006,while Performing Periodic Surveillance Testing of Control Rods at 100% Power,Rod Control Urgent Failure Alarm Received on Shutdown Bank A. Caused by Blown Fuses.Fuses Replaced & Alarm Cleared (← links)
- PNO-V-87-051, on 870714,reactor Trip & Safety Injection from 12% Power Occurred.Caused by turbine-generator Trip Due to High Steam Generator Water Level & Flickering High Steam Flow Bistables,Respectively.Root Causes Under Investigation (← links)
- IR 05000275/1989003 (← links)
- IR 05000275/1987022 (← links)
- ML20234E807 (← links)