ML16188A020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713


July 5, 2016 MEETING SUMMARY  
July 5, 2016 MEETING  
 
==SUMMARY==


LICENSEE: ENTERGY NUCLEAR NORTHEAST  
LICENSEE: ENTERGY NUCLEAR NORTHEAST  
Line 24: Line 26:


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING  
 
==SUMMARY==
OF PUBLIC MEETING  


On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015.
On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015.
Line 31: Line 35:
Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC pers onnel were available to speak individually with stakeholders.  
Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC pers onnel were available to speak individually with stakeholders.  


The NRC's assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html
The NRC's assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.   
.   
         /RA/    Glenn T. Dentel, Chief Projects Branch 2  
         /RA/    Glenn T. Dentel, Chief Projects Branch 2  


Line 43: Line 46:
: 4. Handouts Submitted by Individuals (ML16182A177)   
: 4. Handouts Submitted by Individuals (ML16182A177)   


ML16188A020 SUNSI Review Non-Sensitive  Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NA.M.E NFloyd/NF  GDentel/GTD    DATE 7/5/16 7/5/16}}
ML16188A020           SUNSI Review Non-Sensitive  Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NA.M.E NFloyd/NF  GDentel/GTD    DATE 7/5/16 7/5/16}}

Revision as of 08:05, 8 July 2018

06/08/2016 - Summary of Annual Assessment Meeting for Indian Point Units 2 and 3
ML16188A020
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 07/05/2016
From: Dentel G T
Reactor Projects Branch 2
To:
Entergy Nuclear Northeast
Dentel G T
References
Download: ML16188A020 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

July 5, 2016 MEETING

SUMMARY

LICENSEE: ENTERGY NUCLEAR NORTHEAST

FACILITY: INDIAN POINT UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING

On June 8, 2016, from 7:00 p.m. to 10:10 p.m., the U.S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Doubletree by Hilton in Tarrytown, New York, to discuss its assessment of the safety performance at Indian Point Units 2 and 3 for calendar year 2015.

The NRC discussed its assessment of the safety performance of Indian Point Units 2 and 3 for the period of January 1 through December 31, 2015. The NRC presented slides on two topics of public interest, which included the identification of degraded baffle-former bolts at Unit 2 and the plans for installation of a new natural gas pipeline that will cross a portion of the Indian Point plant property. Following the presentations, the NRC held a question and answer session, during which interested stakeholders were able to ask questions or make statements in a public forum.

Approximately 300 people attended the meeting, including representatives of Federal, State, and local governments. During the question and answer session, individuals either made a statement or asked questions related to NRC oversight of Indian Point Units 2 and 3. Following the question and answer session, NRC pers onnel were available to speak individually with stakeholders.

The NRC's assessment letter can be found in the Agencywide Documents Access and Management System (ADAMS) with Accession Number ML16060A077. The annual assessment meeting notice can be found in ADAMS with Accession Number ML16153A413. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

/RA/ Glenn T. Dentel, Chief Projects Branch 2

Division of Reactor Projects

Enclosures:

1. Speaker List (ML16182A062)
2. NRC Staff Presentations (ML16182A067)
3. Presentations by Members of the Public (ML16182A102)
4. Handouts Submitted by Individuals (ML16182A177)

ML16188A020 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NA.M.E NFloyd/NF GDentel/GTD DATE 7/5/16 7/5/16