ML17228A716: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
| page count = 3
| page count = 3
}}
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Wentzel, MichaelSent:Wednesday, August 16, 2017 1:18 PMTo:Guth, MitchCc:Hanek, Olga; Kilby, Gary; Czaya, Paul; Mack, Jarrett
==Subject:==
Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)Mitch, By application dated April 9, 2017 (Agencywide Documents Access and Management System Accession No. ML17101A637), Florida Power & Light Company (the licensee) submitted License Amendment Request No. 249 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The proposed amendments would revise the Technical Specifications (TSs) to eliminate certain TS reporting requirements, revise an ACTION for the Emergency Core Cooling System (ECCS), and make changes to certain administrative TSs.
The U.S. Nuclear Regulatory Commission's (NRC's) Reactor Systems Branch (SRXB) staff reviewed the application and identified areas where it needs additional information to support its review. The NRC staff's request for additional information (RAI) is provided below. As discussed with Ms. Olga Hanek of your staff on August 16, 2017, the NRC staff requests the licensee to respond to the RAI by September 22, 2017.
Sincerely,  Michael Wentzel Project Manager NRR/DORL/LPLII-2 (301) 415-6459 michael.wentzel@nrc.gov  SRXB RAI 1 - TS 3.5.2 Regarding Isolation Valves 744A/B and 843A/B Chapter 6.2 Figures in the updated final safety analysis report (UFSAR) for Turkey Point indicate that the residual heat removal (RHR) and safety injection (SI) cold-leg headers each contain two parallel flow paths with a motor-operated isolation valve in each flow path. Those four isolation valves (744A/B and 843A/B) would open on an SI actuation signal. While the proposed TS would add the RHR parallel injection flow paths and SI parallel injection flow paths to ACTION a of TS 3.5.2 limiting the outage time of the associated flow paths to 72 hours, the valves 744A/B and 843A/B are not added to TS 3.5.2, Surveillance Requirement (SR) 4.5.2.a, which specifies the requirements for applicable valves in the ECCS flow paths for determining if the ACTION requirements in ACTION a of TS 3.5.2 are met for a corresponding flow path. Paragraph 50.36(c)(3) of Title 10 of the Code of Federal Regulations requires, in part, establishing SRs to assure that the Limiting Conditions for Operation (LCOs) will be met. Provide a justification for the acceptability of not including valves 744A/B and 843 A/B in TS SR 4.5.2.a.
SRXB RAI 2 - TS 3.5.2 Regarding RCS Hot-Leg leg Recirculation Flow Path  Chapter 6.2.2 of the UFSAR indicates that the RCS hot-leg injection piping configuration contains two parallel injection flow paths with a motor-operated isolation valve in each flow path. The RCS hot-leg injection is required to prevent boric acid precipitation on the fuel cladding from reducing core cooling following a loss-of-coolant accident (LOCA). Those two isolation valves (866A/B) would open during the RCS hot-leg injection mode, and they are included in TS 3.5.2, SR 4.5.2.a, which specifies the requirements for applicable valves to 2assure ECCS flow paths to be operable. The LCO and ACTION Requirements (AR) for the hot-leg parallel injection follow paths are not available in TS 3.5.2.
Criterion 3 in Paragraph 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations requires, in part, a TS LCO for a structure, system, or component that is credited in the design basis transient and/or LOCA analysis. Provide a justification for the adequacy of not including the RCS hot-leg parallel injection follow paths in a TS LCO and AR.
Hearing Identifier:  NRR_PMDA  Email Number:  3665  Mail Envelope Properties  (efd96a225c56475b81993c84534782cf) 
==Subject:==
Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)  Sent Date:  8/16/2017 1:18:14 PM  Received Date:  8/16/2017 1:18:00 PM  From:    Wentzel, Michael  Created By:  Michael.Wentzel@nrc.gov  Recipients:    "Hanek, Olga" <Olga.Hanek@fpl.com>  Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>  Tracking Status: None  "Czaya, Paul" <Paul.Czaya@fpl.com>
Tracking Status: None  "Mack, Jarrett" <Jarrett.Mack@fpl.com>  Tracking Status: None "Guth, Mitch" <Mitch.Guth@fpl.com>  Tracking Status: None Post Office:  HQPWMSMRS03.nrc.gov  Files    Size      Date & Time  MESSAGE    3415      8/16/2017 1:18:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:       
}}
}}

Revision as of 15:39, 25 April 2018

2017/08/16 NRR E-mail Capture - Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)
ML17228A716
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/16/2017
From: Wentzel M J
Plant Licensing Branch II
To: Guth M
Florida Power & Light Co
References
MF9601, MF9602
Download: ML17228A716 (3)


Text

1NRR-PMDAPEm ResourceFrom:Wentzel, MichaelSent:Wednesday, August 16, 2017 1:18 PMTo:Guth, MitchCc:Hanek, Olga; Kilby, Gary; Czaya, Paul; Mack, Jarrett

Subject:

Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)Mitch, By application dated April 9, 2017 (Agencywide Documents Access and Management System Accession No. ML17101A637), Florida Power & Light Company (the licensee) submitted License Amendment Request No. 249 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The proposed amendments would revise the Technical Specifications (TSs) to eliminate certain TS reporting requirements, revise an ACTION for the Emergency Core Cooling System (ECCS), and make changes to certain administrative TSs.

The U.S. Nuclear Regulatory Commission's (NRC's) Reactor Systems Branch (SRXB) staff reviewed the application and identified areas where it needs additional information to support its review. The NRC staff's request for additional information (RAI) is provided below. As discussed with Ms. Olga Hanek of your staff on August 16, 2017, the NRC staff requests the licensee to respond to the RAI by September 22, 2017.

Sincerely, Michael Wentzel Project Manager NRR/DORL/LPLII-2 (301) 415-6459 michael.wentzel@nrc.gov SRXB RAI 1 - TS 3.5.2 Regarding Isolation Valves 744A/B and 843A/B Chapter 6.2 Figures in the updated final safety analysis report (UFSAR) for Turkey Point indicate that the residual heat removal (RHR) and safety injection (SI) cold-leg headers each contain two parallel flow paths with a motor-operated isolation valve in each flow path. Those four isolation valves (744A/B and 843A/B) would open on an SI actuation signal. While the proposed TS would add the RHR parallel injection flow paths and SI parallel injection flow paths to ACTION a of TS 3.5.2 limiting the outage time of the associated flow paths to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the valves 744A/B and 843A/B are not added to TS 3.5.2, Surveillance Requirement (SR) 4.5.2.a, which specifies the requirements for applicable valves in the ECCS flow paths for determining if the ACTION requirements in ACTION a of TS 3.5.2 are met for a corresponding flow path. Paragraph 50.36(c)(3) of Title 10 of the Code of Federal Regulations requires, in part, establishing SRs to assure that the Limiting Conditions for Operation (LCOs) will be met. Provide a justification for the acceptability of not including valves 744A/B and 843 A/B in TS SR 4.5.2.a.

SRXB RAI 2 - TS 3.5.2 Regarding RCS Hot-Leg leg Recirculation Flow Path Chapter 6.2.2 of the UFSAR indicates that the RCS hot-leg injection piping configuration contains two parallel injection flow paths with a motor-operated isolation valve in each flow path. The RCS hot-leg injection is required to prevent boric acid precipitation on the fuel cladding from reducing core cooling following a loss-of-coolant accident (LOCA). Those two isolation valves (866A/B) would open during the RCS hot-leg injection mode, and they are included in TS 3.5.2, SR 4.5.2.a, which specifies the requirements for applicable valves to 2assure ECCS flow paths to be operable. The LCO and ACTION Requirements (AR) for the hot-leg parallel injection follow paths are not available in TS 3.5.2.

Criterion 3 in Paragraph 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations requires, in part, a TS LCO for a structure, system, or component that is credited in the design basis transient and/or LOCA analysis. Provide a justification for the adequacy of not including the RCS hot-leg parallel injection follow paths in a TS LCO and AR.

Hearing Identifier: NRR_PMDA Email Number: 3665 Mail Envelope Properties (efd96a225c56475b81993c84534782cf)

Subject:

Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602) Sent Date: 8/16/2017 1:18:14 PM Received Date: 8/16/2017 1:18:00 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients: "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com> Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com>

Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com> Tracking Status: None "Guth, Mitch" <Mitch.Guth@fpl.com> Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3415 8/16/2017 1:18:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: