Line 13: |
| | document type = E-Mail, Request for Additional Information (RAI) | | | document type = E-Mail, Request for Additional Information (RAI) |
| | page count = 3 | | | page count = 3 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Wentzel, MichaelSent:Wednesday, August 16, 2017 1:18 PMTo:Guth, MitchCc:Hanek, Olga; Kilby, Gary; Czaya, Paul; Mack, Jarrett |
| | |
| | ==Subject:== |
| | Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)Mitch, By application dated April 9, 2017 (Agencywide Documents Access and Management System Accession No. ML17101A637), Florida Power & Light Company (the licensee) submitted License Amendment Request No. 249 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The proposed amendments would revise the Technical Specifications (TSs) to eliminate certain TS reporting requirements, revise an ACTION for the Emergency Core Cooling System (ECCS), and make changes to certain administrative TSs. |
| | The U.S. Nuclear Regulatory Commission's (NRC's) Reactor Systems Branch (SRXB) staff reviewed the application and identified areas where it needs additional information to support its review. The NRC staff's request for additional information (RAI) is provided below. As discussed with Ms. Olga Hanek of your staff on August 16, 2017, the NRC staff requests the licensee to respond to the RAI by September 22, 2017. |
| | |
| | Sincerely, Michael Wentzel Project Manager NRR/DORL/LPLII-2 (301) 415-6459 michael.wentzel@nrc.gov SRXB RAI 1 - TS 3.5.2 Regarding Isolation Valves 744A/B and 843A/B Chapter 6.2 Figures in the updated final safety analysis report (UFSAR) for Turkey Point indicate that the residual heat removal (RHR) and safety injection (SI) cold-leg headers each contain two parallel flow paths with a motor-operated isolation valve in each flow path. Those four isolation valves (744A/B and 843A/B) would open on an SI actuation signal. While the proposed TS would add the RHR parallel injection flow paths and SI parallel injection flow paths to ACTION a of TS 3.5.2 limiting the outage time of the associated flow paths to 72 hours, the valves 744A/B and 843A/B are not added to TS 3.5.2, Surveillance Requirement (SR) 4.5.2.a, which specifies the requirements for applicable valves in the ECCS flow paths for determining if the ACTION requirements in ACTION a of TS 3.5.2 are met for a corresponding flow path. Paragraph 50.36(c)(3) of Title 10 of the Code of Federal Regulations requires, in part, establishing SRs to assure that the Limiting Conditions for Operation (LCOs) will be met. Provide a justification for the acceptability of not including valves 744A/B and 843 A/B in TS SR 4.5.2.a. |
| | SRXB RAI 2 - TS 3.5.2 Regarding RCS Hot-Leg leg Recirculation Flow Path Chapter 6.2.2 of the UFSAR indicates that the RCS hot-leg injection piping configuration contains two parallel injection flow paths with a motor-operated isolation valve in each flow path. The RCS hot-leg injection is required to prevent boric acid precipitation on the fuel cladding from reducing core cooling following a loss-of-coolant accident (LOCA). Those two isolation valves (866A/B) would open during the RCS hot-leg injection mode, and they are included in TS 3.5.2, SR 4.5.2.a, which specifies the requirements for applicable valves to 2assure ECCS flow paths to be operable. The LCO and ACTION Requirements (AR) for the hot-leg parallel injection follow paths are not available in TS 3.5.2. |
| | Criterion 3 in Paragraph 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations requires, in part, a TS LCO for a structure, system, or component that is credited in the design basis transient and/or LOCA analysis. Provide a justification for the adequacy of not including the RCS hot-leg parallel injection follow paths in a TS LCO and AR. |
| | Hearing Identifier: NRR_PMDA Email Number: 3665 Mail Envelope Properties (efd96a225c56475b81993c84534782cf) |
| | |
| | ==Subject:== |
| | Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602) Sent Date: 8/16/2017 1:18:14 PM Received Date: 8/16/2017 1:18:00 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients: "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com> Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com> |
| | Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com> Tracking Status: None "Guth, Mitch" <Mitch.Guth@fpl.com> Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3415 8/16/2017 1:18:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: |
| }} | | }} |
Revision as of 15:39, 25 April 2018
|
---|
Category:E-Mail
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 2024-09-06
[Table view] |
Text
1NRR-PMDAPEm ResourceFrom:Wentzel, MichaelSent:Wednesday, August 16, 2017 1:18 PMTo:Guth, MitchCc:Hanek, Olga; Kilby, Gary; Czaya, Paul; Mack, Jarrett
Subject:
Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602)Mitch, By application dated April 9, 2017 (Agencywide Documents Access and Management System Accession No. ML17101A637), Florida Power & Light Company (the licensee) submitted License Amendment Request No. 249 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point). The proposed amendments would revise the Technical Specifications (TSs) to eliminate certain TS reporting requirements, revise an ACTION for the Emergency Core Cooling System (ECCS), and make changes to certain administrative TSs.
The U.S. Nuclear Regulatory Commission's (NRC's) Reactor Systems Branch (SRXB) staff reviewed the application and identified areas where it needs additional information to support its review. The NRC staff's request for additional information (RAI) is provided below. As discussed with Ms. Olga Hanek of your staff on August 16, 2017, the NRC staff requests the licensee to respond to the RAI by September 22, 2017.
Sincerely, Michael Wentzel Project Manager NRR/DORL/LPLII-2 (301) 415-6459 michael.wentzel@nrc.gov SRXB RAI 1 - TS 3.5.2 Regarding Isolation Valves 744A/B and 843A/B Chapter 6.2 Figures in the updated final safety analysis report (UFSAR) for Turkey Point indicate that the residual heat removal (RHR) and safety injection (SI) cold-leg headers each contain two parallel flow paths with a motor-operated isolation valve in each flow path. Those four isolation valves (744A/B and 843A/B) would open on an SI actuation signal. While the proposed TS would add the RHR parallel injection flow paths and SI parallel injection flow paths to ACTION a of TS 3.5.2 limiting the outage time of the associated flow paths to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the valves 744A/B and 843A/B are not added to TS 3.5.2, Surveillance Requirement (SR) 4.5.2.a, which specifies the requirements for applicable valves in the ECCS flow paths for determining if the ACTION requirements in ACTION a of TS 3.5.2 are met for a corresponding flow path. Paragraph 50.36(c)(3) of Title 10 of the Code of Federal Regulations requires, in part, establishing SRs to assure that the Limiting Conditions for Operation (LCOs) will be met. Provide a justification for the acceptability of not including valves 744A/B and 843 A/B in TS SR 4.5.2.a.
SRXB RAI 2 - TS 3.5.2 Regarding RCS Hot-Leg leg Recirculation Flow Path Chapter 6.2.2 of the UFSAR indicates that the RCS hot-leg injection piping configuration contains two parallel injection flow paths with a motor-operated isolation valve in each flow path. The RCS hot-leg injection is required to prevent boric acid precipitation on the fuel cladding from reducing core cooling following a loss-of-coolant accident (LOCA). Those two isolation valves (866A/B) would open during the RCS hot-leg injection mode, and they are included in TS 3.5.2, SR 4.5.2.a, which specifies the requirements for applicable valves to 2assure ECCS flow paths to be operable. The LCO and ACTION Requirements (AR) for the hot-leg parallel injection follow paths are not available in TS 3.5.2.
Criterion 3 in Paragraph 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations requires, in part, a TS LCO for a structure, system, or component that is credited in the design basis transient and/or LOCA analysis. Provide a justification for the adequacy of not including the RCS hot-leg parallel injection follow paths in a TS LCO and AR.
Hearing Identifier: NRR_PMDA Email Number: 3665 Mail Envelope Properties (efd96a225c56475b81993c84534782cf)
Subject:
Request for Additional Information - Turkey Point 3 & 4 LAR-249 (CAC Nos. MF9601 & MF9602) Sent Date: 8/16/2017 1:18:14 PM Received Date: 8/16/2017 1:18:00 PM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients: "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com> Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com>
Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com> Tracking Status: None "Guth, Mitch" <Mitch.Guth@fpl.com> Tracking Status: None Post Office: HQPWMSMRS03.nrc.gov Files Size Date & Time MESSAGE 3415 8/16/2017 1:18:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: