IR 05000348/2021005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 24: Line 24:


==Dear Ms. Gayheart:==
==Dear Ms. Gayheart:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2023, Joseph M.
The enclosed inspection plan lists the inspections scheduled through June 30, 202 3, Joseph M.


Farley Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Farley Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID -19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the N RCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID -19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.


The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Line 37: Line 37:
Sincerely,
Sincerely,
/RA/
/RA/
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8 Enclosure(s):
 
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects
 
Docket Nos. 05000348 and 05000364 License Nos.NPF -2 and NPF-8
 
Enclosure(s):
Farley Inspection/Activity Plan (09/01/2021- 06/30/2023)
Farley Inspection/Activity Plan (09/01/2021- 06/30/2023)
cc: Distribution via ListServ
cc: Distribution via ListServ


ML21237A245 OFFICE RII:DRP RII:DRP NAME N. Staples A. Blamey DATE 8/23/2021 8/24/2021
ML21237A245 OFFICE RII:DRP RII:DRP NAME N. Staples A. Blamey DATE 8/23/2021 8/24/2021


IP 22b Site Inspection Activity Plan Farley 09/01/2021 - 06/30/2023 Unit Start End Activity CAC Title   Staff Count EMERGENCY PREPAREDNESS EXERCISE INSPECTION     5 1, 2 9/20/2021 9/24/2021 IP 71114.01 000716 Exercise Evaluation 1, 2 9/20/2021 9/24/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 9/20/2021 9/24/2021 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)     3 1, 2 10/18/2021 10/22/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 11/1/2021 11/5/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS     3 1, 2 2/7/2022 2/11/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments EMERGENCY PREPAREDNESS EXERCISE INSPECTION     5 1, 2 3/7/2022 3/11/2022 IP 71114.01 000716 Exercise Evaluation 1, 2 3/7/2022 3/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 3/7/2022 3/11/2022 IP 71151 001397 Performance Indicator Verification CYBER SECURITY INSPECTION       2 1, 2 3/21/2022 3/25/2022 IP 71130.10P 000741 Cyber Security UNIT 2 IN-SERVICE INSPECTION +SG       2 2 4/18/2022 4/22/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
IP 22b Site Inspection Activity Plan Farley
FARLEY REQUAL INSPECTION       2 1, 2 4/18/2022 4/22/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance SECURITY BASELINE INSPECTION       1 1, 2 7/11/2022 7/15/2022 IP 71130.02 000734 Access Control 1, 2 7/11/2022 7/15/2022 IP 71130.09 001656 Security Plan Changes 1, 2 7/11/2022 7/15/2022 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION       2 1, 2 7/18/2022 7/22/2022 IP 71130.14 000743 Review of Power Reactor Target Sets UNIT 1 IN-SERVICE INSPECTION +SG       2 1 9/19/2022 9/23/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION     3 2 9/26/2022 9/30/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 9/26/2022 9/30/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 9/26/2022 9/30/2022 IP 71124.04 000728 Occupational Dose Assessment Prepared on 8/24/2021 12:36:26 PM     1 of 2
09/01/2021 - 06/30/2023
 
Unit Start End Activity CAC Title Staff Count
 
EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5
 
1, 2 9/20/2021 9/24/2021 IP 71114.01 000716 Exercise Evaluation
 
1, 2 9/20/2021 9/24/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 9/20/2021 9/24/2021 IP 71151 001397 Performance Indicator Verification
 
DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3
 
1, 2 10/18/2021 10/22/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 11/1/2021 11/5/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
 
EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3
 
1, 2 2/7/2022 2/11/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments
 
EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5
 
1, 2 3/7/2022 3/11/2022 IP 71114.01 000716 Exercise Evaluation
 
1, 2 3/7/2022 3/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 3/7/2022 3/11/2022 IP 71151 001397 Performance Indicator Verification
 
CYBER SECURITY INSPECTION 2
 
1, 2 3/21/2022 3/25/2022 IP 71130.10P 000741 Cyber Security
 
UNIT 2 IN-SERVICE INSPECTION +SG 2
 
2 4/18/2022 4/22/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
FARLEY REQUAL INSPECTION 2
 
1, 2 4/18/2022 4/22/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
 
SECURITY BASELINE INSPECTION 1
 
1, 2 7/11/2022 7/15/2022 IP 71130.02 000734 Access Control
 
1, 2 7/11/2022 7/15/2022 IP 71130.09 001656 Security Plan Changes
 
1, 2 7/11/2022 7/15/2022 IP 71151 001338 Performance Indicator Verification
 
TARGET SET INSPECTION 2
 
1, 2 7/18/2022 7/22/2022 IP 71130.14 000743 Review of Power Reactor Target Sets
 
UNIT 1 IN-SERVICE INSPECTION +SG 2
 
1 9/19/2022 9/23/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3
 
2 9/26/2022 9/30/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
2 9/26/2022 9/30/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
2 9/26/2022 9/30/2022 IP 71124.04 000728 Occupational Dose Assessment
 
Prepared on 8/24/2021 12:36:26 PM 1 of 2 IP 22b Site Inspection Activity Plan
 
2 9/26/2022 9/30/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation
 
2 9/26/2022 9/30/2022 IP 71151 000746 Performance Indicator Verification
 
2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
2 10/17/2022 10/21/2022 IP 71124.04 000728 Occupational Dose Assessment
 
2 10/17/2022 10/21/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation
 
2 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification
 
SECURITY BASELINE INSPECTION 2
 
1, 2 3/13/2023 3/17/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
 
1, 2 3/13/2023 3/17/2023 IP 71130.07 000739 Security Training
 
DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6
 
1, 2 4/3/2023 4/7/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)


IP 22b Site Inspection Activity Plan 2 9/26/2022 9/30/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 2 9/26/2022 9/30/2022 IP 71151 000746 Performance Indicator Verification 2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 10/17/2022 10/21/2022 IP 71124.04 000728 Occupational Dose Assessment 2 10/17/2022 10/21/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 2 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION      2 1, 2 3/13/2023 3/17/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 3/13/2023 3/17/2023 IP 71130.07 000739 Security Training DESIGN BASES ASSURANCE INSPECTION (TEAMS)      6 1, 2 4/3/2023 4/7/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 4/17/2023 4/21/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 4/17/2023 4/21/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
FARLEY INITIAL LICENSE EXAM       3 1, 2 4/17/2023 4/21/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
FARLEY INITIAL LICENSE EXAM 3
 
1, 2 4/17/2023 4/21/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 5/22/2023 6/2/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
1, 2 5/22/2023 6/2/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
EMERGENCY PREPAREDNESS PROGRAM INSPECTION     2 1, 2 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing 1, 2 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification Prepared on 8/24/2021 12:36:26 PM     2 of 2
 
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
 
1, 2 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing
 
1, 2 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
 
1, 2 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness
 
1, 2 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification
 
Prepared on 8/24/2021 12:36:26 PM 2 of 2
}}
}}

Latest revision as of 23:40, 19 November 2024

Updated Inspection Plan for Joseph M. Farley Nuclear Plant Units 1 and 2 (Report 05000348/2021005 and 05000364/2021005)
ML21237A245
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/24/2021
From: Alan Blamey
NRC/RGN-II/DRP/RPB2
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2021005
Download: ML21237A245 (5)


Text

August 24, 2021

SUBJECT:

UPDATED INSPECTION PLAN FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 (Report 05000348/2021005 AND 05000364/2021005)

Dear Ms. Gayheart:

The enclosed inspection plan lists the inspections scheduled through June 30, 202 3, Joseph M.

Farley Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID -19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the N RCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID -19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 05000348 and 05000364 License Nos.NPF -2 and NPF-8

Enclosure(s):

Farley Inspection/Activity Plan (09/01/2021- 06/30/2023)

cc: Distribution via ListServ

ML21237A245 OFFICE RII:DRP RII:DRP NAME N. Staples A. Blamey DATE 8/23/2021 8/24/2021

IP 22b Site Inspection Activity Plan Farley

09/01/2021 - 06/30/2023

Unit Start End Activity CAC Title Staff Count

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1, 2 9/20/2021 9/24/2021 IP 71114.01 000716 Exercise Evaluation

1, 2 9/20/2021 9/24/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 9/20/2021 9/24/2021 IP 71151 001397 Performance Indicator Verification

DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3

1, 2 10/18/2021 10/22/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 11/1/2021 11/5/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3

1, 2 2/7/2022 2/11/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1, 2 3/7/2022 3/11/2022 IP 71114.01 000716 Exercise Evaluation

1, 2 3/7/2022 3/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 3/7/2022 3/11/2022 IP 71151 001397 Performance Indicator Verification

CYBER SECURITY INSPECTION 2

1, 2 3/21/2022 3/25/2022 IP 71130.10P 000741 Cyber Security

UNIT 2 IN-SERVICE INSPECTION +SG 2

2 4/18/2022 4/22/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

FARLEY REQUAL INSPECTION 2

1, 2 4/18/2022 4/22/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

SECURITY BASELINE INSPECTION 1

1, 2 7/11/2022 7/15/2022 IP 71130.02 000734 Access Control

1, 2 7/11/2022 7/15/2022 IP 71130.09 001656 Security Plan Changes

1, 2 7/11/2022 7/15/2022 IP 71151 001338 Performance Indicator Verification

TARGET SET INSPECTION 2

1, 2 7/18/2022 7/22/2022 IP 71130.14 000743 Review of Power Reactor Target Sets

UNIT 1 IN-SERVICE INSPECTION +SG 2

1 9/19/2022 9/23/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3

2 9/26/2022 9/30/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 9/26/2022 9/30/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2 9/26/2022 9/30/2022 IP 71124.04 000728 Occupational Dose Assessment

Prepared on 8/24/2021 12:36:26 PM 1 of 2 IP 22b Site Inspection Activity Plan

2 9/26/2022 9/30/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation

2 9/26/2022 9/30/2022 IP 71151 000746 Performance Indicator Verification

2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2 10/17/2022 10/21/2022 IP 71124.04 000728 Occupational Dose Assessment

2 10/17/2022 10/21/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation

2 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification

SECURITY BASELINE INSPECTION 2

1, 2 3/13/2023 3/17/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1, 2 3/13/2023 3/17/2023 IP 71130.07 000739 Security Training

DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6

1, 2 4/3/2023 4/7/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 4/17/2023 4/21/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

FARLEY INITIAL LICENSE EXAM 3

1, 2 4/17/2023 4/21/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 5/22/2023 6/2/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1, 2 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing

1, 2 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1, 2 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness

1, 2 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification

Prepared on 8/24/2021 12:36:26 PM 2 of 2