IR 05000275/2003010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
Line 1: Line 1:
{{IR-Nav| site = 05000275 | year = 2003 | report number = 010 | url = https://www.nrc.gov/reactors/operating/oversight/reports/diab_2003010.pdf }}
{{Adams
| number = ML033300326
| issue date = 11/26/2003
| title = IR 05000275-03-010 & IR 05000323-03-010, on August 1-September 28, 2003, Diablo Canyon Power Plant. Problem Identification and Resolution, Event Response, Operability Evaluations and Postmaintenance Testing
| author name = Jones W
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| addressee name = Rueger G
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-03-010
| document type = Inspection Report, Letter
| page count = 60
}}
 
{{IR-Nav| site = 05000275 | year = 2003 | report number = 010 }}
 
=Text=
{{#Wiki_filter:
}}

Revision as of 08:24, 20 March 2020

IR 05000275-03-010 & IR 05000323-03-010, on August 1-September 28, 2003, Diablo Canyon Power Plant. Problem Identification and Resolution, Event Response, Operability Evaluations and Postmaintenance Testing
ML033300326
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/26/2003
From: William Jones
NRC/RGN-IV/DRP/RPB-E
To: Rueger G
Pacific Gas & Electric Co
References
IR-03-010
Download: ML033300326 (60)


Text