Line 14: |
Line 14: |
| | page count = 5 | | | page count = 5 |
| }} | | }} |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY | | {{#Wiki_filter:UNITED STATES |
|
| |
|
| COMMISSION | | NUCLEAR REGULATORY COMMISSION |
|
| |
|
| ===OFFICE OF NUCLEAR REACTOR REGULATION===
| | OFFICE OF NUCLEAR REACTOR REGULATION |
| WASHINGTON, D.C. 20555 April 14, 1989 NRC INFORMATION
| |
|
| |
|
| NOTICE NO. 89-40: UNSATISFACTORY | | WASHINGTON, D.C. 20555 April 14, 1989 NRC INFORMATION NOTICE NO. 89-40: UNSATISFACTORY OPERATOR TEST RESULTS AND THEIR |
|
| |
|
| OPERATOR TEST RESULTS AND THEIR EFFECT ON THE REQUALIFICATION
| | EFFECT ON THE REQUALIFICATION PROGRAM |
| | |
| PROGRAM | |
|
| |
|
| ==Addressees== | | ==Addressees== |
| : | | : |
| All holders of operating | | All holders of operating licenses or construction permits for nuclear power |
| | |
| licenses or construction | |
|
| |
|
| permits for nuclear power reactors.
| | reactors. |
|
| |
|
| ==Purpose== | | ==Purpose== |
| : This information | | : |
| | This information notice is being provided to alert addressees to problems |
|
| |
|
| notice is being provided to alert addressees
| | associated with high failure rates for operators taking requalification |
|
| |
|
| to problems associated
| | examinations. It is expected that recipients will review the information |
|
| |
|
| with high failure rates for operators
| | for applicability to their facilities and consider actions, as applicable, to avoid similar problems. However, suggestions contained in this information |
|
| |
|
| taking requalification
| | notice do not constitute NRC requirements; therefore, no specific action or |
|
| |
|
| examinations.
| | written response is required. |
|
| |
|
| It is expected that recipients
| | ==Description of Circumstances== |
| | : |
| | During the weeks of March 13, 1989, and March 20, 1989, requalification exami- nations were administered by the NRC to six crews of licensed operators at |
|
| |
|
| will review the information
| | Turkey Point Units 3 and 4. Three of the six crews performed unsatisfactorily |
|
| |
|
| for applicability
| | during the simulator portion of the operating test and 12 of the 24 licensed |
|
| |
|
| to their facilities
| | operators failed at least one portion (written examination, simulator test, or plant walk-through examination) of the NRC-administered requalification |
|
| |
|
| and consider actions, as applicable, to avoid similar problems. | | examinations. As a 'result, the Turkey Point Units 3 and 4 requalification |
|
| |
|
| However, suggestions
| | programs were evaluated as unsatisfactory by the NRC. The number of licensed |
|
| |
|
| contained
| | operators at the units currently is limited to the 27 licensed operators who |
|
| |
|
| in this information
| | have not failed either a facility or an NRC-administered examination within |
|
| |
|
| notice do not constitute
| | the past 12 months. |
|
| |
|
| NRC requirements;
| | New crews have been formed using licensed operators who have not failed recent |
| therefore, no specific action or written response is required.Description
| |
|
| |
|
| of Circumstances:
| | facility or NRC-administered examinations. Under the terms of a Confirmatory |
| During the weeks of March 13, 1989, and March 20, 1989, requalification
| |
|
| |
|
| exami-nations were administered
| | Action Letter issued by the Regional Administrator, Unit 3 has shut down to |
|
| |
|
| by the NRC to six crews of licensed operators
| | allow the facility licensee time to train the new crews in team performance. |
|
| |
|
| at Turkey Point Units 3 and 4. Three of the six crews performed
| | Unit 4 was already in a shutdown status for refueling. The NRC, in conjunction |
|
| |
|
| unsatisfactorily
| | with the licensee, will perform an operational assessment of the new crews' |
| | performance before concurring in the decision to restart either unit. |
|
| |
|
| during the simulator
| | '/ IN 89-40 |
| | April 14, 1989 Discussion: |
| | The NRC resumed administration of requalification |
|
| |
|
| portion of the operating
| | examinations after conducting |
|
| |
|
| test and 12 of the 24 licensed operators
| | extensive pilot tests of a system for examining candidates |
|
| |
|
| failed at least one portion (written examination, simulator
| | ment on job-relevant tasks of great safety significance. in the work environ- provide licensed senior operators to the NRC examination Facility licensees |
|
| |
|
| test, or plant walk-through
| | quality assurance responsibilities and to concur teams to share the |
|
| |
|
| examination)
| | in the importance and relevancy |
| of the NRC-administered
| |
|
| |
|
| requalification
| | of the examinations. The examinations were field |
|
| |
|
| examinations.
| | by the examination team. tested before administration |
|
| |
|
| As a 'result, the Turkey Point Units 3 and 4 requalification
| | The NRC's confidence in the ability of facility licensees |
|
| |
|
| programs were evaluated
| | health and safety depends upon the licensee's ability to ensure public |
|
| |
|
| as unsatisfactory
| | effective requalification program that maintains to administer an |
|
| |
|
| by the NRC. The number of licensed operators
| | licensed operators and senior operators at the unit highly qualified, professional |
|
| |
|
| at the units currently | | The importance of this aspect of licensee responsibilitycontrols at all times. |
|
| |
|
| is limited to the 27 licensed operators
| | cannot be overstated. |
|
| |
|
| who have not failed either a facility or an NRC-administered
| | No specific action or written response is required |
|
| |
|
| examination
| | If you have any questions about this matter, please by this information notice. |
|
| |
|
| within the past 12 months.New crews have been formed using licensed operators
| | listed below or the Regional Administrator of the contact the technical contact |
|
| |
|
| who have not failed recent facility or NRC-administered
| | appropriate regional office. |
|
| |
|
| examinations.
| | £1*les E. Rossi, Director |
|
| |
|
| ===Under the terms of a Confirmatory===
| | Divis-ion-of-Operationa--Events-Assessment - |
| Action Letter issued by the Regional Administrator, Unit 3 has shut down to allow the facility licensee time to train the new crews in team performance.
| | Office of Nuclear Reactor Regulation |
|
| |
|
| Unit 4 was already in a shutdown status for refueling.
| | ===Technical Contact:=== |
|
| |
|
| ===The NRC, in conjunction=== | | ===K. Perkins Jr., NRR=== |
| with the licensee, will perform an operational
| | (301) 492-1031 Attachment: List of Recently Issued NRC Information Notices |
|
| |
|
| assessment
| | Attachment |
| | |
| of the new crews'performance
| |
| | |
| before concurring
| |
| | |
| in the decision to restart either unit.
| |
| | |
| '/ IN 89-40 April 14, 1989 Discussion:
| |
| The NRC resumed administration
| |
|
| |
|
| of requalification
| | IN 89-40 |
| | April 14, 1989 LIST OF RECENTLY ISSUED |
|
| |
|
| examinations
| | NRC INFORMATION NOTICES |
|
| |
|
| after conducting
| | Information Date of |
|
| |
|
| extensive
| | Notice No. Subject Issuance Issued to |
|
| |
|
| pilot tests of a system for examining
| | 89-39 List of Parties Excluded 4/5/89 All holders of OLs |
|
| |
|
| candidates
| | from Federal Procurement or CPs for nuclear |
|
| |
|
| in the work environ-ment on job-relevant
| | or Non-Procurement Programs power reactors. |
|
| |
|
| tasks of great safety significance.
| | 89-38 Atmospheric Dump Valve 4/5/89 All holders of OLs |
|
| |
|
| Facility licensees provide licensed senior operators
| | Failures at Palo Verde or CPs for nuclear |
|
| |
|
| to the NRC examination
| | Units 1, 2, and 3 power reactors. |
|
| |
|
| teams to share the quality assurance
| | 89-37 Proposed Amendments to 4/4/89 All U.S. NRC licensees. |
|
| |
|
| responsibilities
| | 40 CFR Part 61, Air |
|
| |
|
| and to concur in the importance
| | Emission Standards |
|
| |
|
| and relevancy of the examinations.
| | for Radionuclides |
|
| |
|
| The examinations
| | 89-36 Excessive Temperatures 4/4/89 All holders of OLs |
|
| |
|
| were field tested before administration
| | in Emergency Core Cooling or CPs for nuclear |
|
| |
|
| by the examination
| | 'System Piping Located power reactors. |
|
| |
|
| team.The NRC's confidence
| | Outside Containment |
|
| |
|
| in the ability of facility licensees
| | 88-86, Operating with Multiple 3/31/89 All holders of OLs |
|
| |
|
| to ensure public health and safety depends upon the licensee's
| | Supp. 1 Grounds in Direct Current or CPs for nuclear |
|
| |
|
| ability to administer
| | Distribution Systems power reactors. |
|
| |
|
| an effective
| | 89-35 Loss and Theft of Un- 3/30/89 All U.S. NRC byproduct, secured Licensed Material source and special |
|
| |
|
| requalification
| | nuclear material |
|
| |
|
| program that maintains
| | licensees. |
|
| |
|
| highly qualified, professional
| | 89-34 Disposal of Americium 3/30/89 All holders of an |
|
| |
|
| licensed operators
| | Well-Logging Sources NRC specific license |
|
| |
|
| and senior operators
| | authorizing well- logging activities. |
|
| |
|
| at the unit controls at all times.The importance
| | 89-33 Potential Failure of 3/23/89 All holders of OLs |
|
| |
|
| of this aspect of licensee responsibility
| | Westinghouse Steam or CPs for PWRs. |
|
| |
|
| cannot be overstated.
| | Generator Tube |
|
| |
|
| No specific action or written response is required by this information
| | Mechanical Plugs |
|
| |
|
| notice.If you have any questions
| | 89-32 Surveillance Testing 3/23/89 All holders of OLs |
|
| |
|
| about this matter, please contact the technical
| | of Low-Temperature or CPs for PWRs. |
| | |
| contact listed below or the Regional Administrator
| |
| | |
| of the appropriate | |
| | |
| regional office.£1les E. Rossi, Director Divis-ion-of-Operationa--Events-Assessment
| |
| | |
| -Office of Nuclear Reactor Regulation
| |
| | |
| Technical
| |
| | |
| Contact: K. Perkins Jr., NRR (301) 492-1031 Attachment:
| |
| List of Recently Issued NRC Information
| |
| | |
| Notices
| |
| | |
| Attachment
| |
| | |
| IN 89-40 April 14, 1989 LIST OF RECENTLY ISSUED NRC INFORMATION
| |
| | |
| NOTICES Information
| |
| | |
| Date of Notice No. Subject Issuance Issued to 89-39 List of Parties Excluded from Federal Procurement
| |
| | |
| or Non-Procurement
| |
| | |
| Programs 4/5/89 All holders of OLs or CPs for nuclear power reactors.89-38 Atmospheric
| |
| | |
| Failures at Units 1, 2, Dump Valve Palo Verde and 3 4/5/89 All holders of OLs or CPs for nuclear power reactors.89-37 89-36 88-86, Supp. 1 89-35 89-34 89-33 Proposed Amendments
| |
| | |
| to 40 CFR Part 61, Air Emission Standards for Radionuclides
| |
| | |
| Excessive
| |
| | |
| ===Temperatures===
| |
| in Emergency
| |
| | |
| Core Cooling'System Piping Located Outside Containment
| |
| | |
| Operating
| |
| | |
| with Multiple Grounds in Direct Current Distribution
| |
| | |
| Systems Loss and Theft of Un-secured Licensed Material Disposal of Americium Well-Logging
| |
| | |
| Sources Potential
| |
| | |
| Failure of Westinghouse
| |
| | |
| Steam Generator
| |
| | |
| Tube Mechanical
| |
| | |
| Plugs Surveillance
| |
| | |
| Testing of Low-Temperature
| |
|
| |
|
| Overpressure-Protection | | Overpressure-Protection |
|
| |
|
| Systems 4/4/89 4/4/89 3/31/89 3/30/89 3/30/89 3/23/89 3/23/89 All U.S. NRC licensees. | | Systems |
|
| |
|
| All holders of OLs or CPs for nuclear power reactors.All holders of OLs or CPs for nuclear power reactors.All U.S. NRC byproduct, source and special nuclear material licensees.
| | OL = Operating License |
|
| |
|
| All holders of an NRC specific license authorizing
| | CP = Construction Permit |
|
| |
|
| well-logging activities.
| | IN 89-40 |
| | April 14, 1989 Discussion: |
| | The NRC resumed administration of requalification examinations after conducting |
|
| |
|
| All holders of OLs or CPs for PWRs.All holders of OLs or CPs for PWRs.89-32 OL = Operating
| | extensive pilot tests of a system for examining candidates in the work environ- ment on job-relevant tasks of great safety significance. Facility licensees |
|
| |
|
| License CP = Construction
| | provide licensed senior operators to the NRC examination teams to share the |
|
| |
|
| Permit
| | quality assurance responsibilities and to concur in the importance and relevancy |
|
| |
|
| IN 89-40 April 14, 1989 Discussion:
| | of the examinations. The examinations were field tested before administration |
| The NRC resumed administration | |
|
| |
|
| of requalification
| | by the examination team. |
|
| |
|
| examinations
| | The NRC's confidence in the ability of facility licensees to ensure public |
|
| |
|
| after conducting
| | health and safety depends upon the licensee's ability to administer an |
|
| |
|
| extensive
| | effective requalification program that maintains highly qualified, professional |
|
| |
|
| pilot tests of a system for examining
| | licensed operators and senior operators at the unit controls at all times. |
|
| |
|
| candidates
| | The importance of this aspect of licensee responsibility cannot be overstated. |
|
| |
|
| in the work environ-ment on job-relevant
| | No specific action or written response is required by this information notice. |
|
| |
|
| tasks of great safety significance.
| | If you have any questions about this matter, please contact the technical contact |
|
| |
|
| Facility licensees provide licensed senior operators
| | listed below or the Regional Administrator of the appropriate regional office. |
|
| |
|
| to the NRC examination
| | Charles E. Rossi, Director |
|
| |
|
| teams to share the quality assurance
| | Division of Operational Events Assessment |
|
| |
|
| responsibilities
| | Office of Nuclear Reactor Regulation |
| | |
| and to concur in the importance
| |
| | |
| and relevancy of the examinations.
| |
| | |
| The examinations
| |
|
| |
|
| were field tested before administration
| | ===Technical Contact:=== |
|
| |
|
| by the examination
| | ===K. Perkins Jr., NRR=== |
| | (301) 492-1031 Attachment: List of Recently Issued NRC Information Notices |
|
| |
|
| team.The NRC's confidence
| | *SEE PREVOUS PAGE FOR CONCURRENCE |
|
| |
|
| in the ability of facility licensees
| | *OLB:DLPQ *OLB:DLPQ *OLB:DLPQ *TECH ED *DDIR: DLPQ *DIR: DLPQ |
|
| |
|
| to ensure public health and safety depends upon the licensee's
| | FGuenther LWiens KPerkins BCalure JZwolinski JVIRoe |
|
| |
|
| ability to administer
| | 4/5/89 4/6/89 4/6/89 4/7/89 4/7/89 4/7/89 |
| | *OGCB/NRR |
|
| |
|
| an effective
| | CBerlinger |
|
| |
|
| requalification
| | 4/7/89 4//a/89 |
|
| |
|
| program that maintains
| | DISTRIBUTION: |
| | CENTRAL FILES |
|
| |
|
| highly qualified, professional
| | OLB RF |
|
| |
|
| licensed operators
| | FGuenther |
|
| |
|
| and senior operators
| | SCooley |
|
| |
|
| at the unit controls at all times.The importance
| | LWlens |
|
| |
|
| of this aspect of licensee responsibility
| | KPerkins |
| | |
| cannot be overstated.
| |
| | |
| No specific action or written response is required by this information
| |
| | |
| notice.If you have any questions
| |
| | |
| about this matter, please contact the technical
| |
| | |
| contact listed below or the Regional Administrator
| |
| | |
| of the appropriate
| |
| | |
| regional office.Charles E. Rossi, Director Division of Operational
| |
| | |
| ===Events Assessment===
| |
| Office of Nuclear Reactor Regulation
| |
|
| |
|
| Technical
| | JZwolinski |
|
| |
|
| Contact: K. Perkins Jr., NRR (301) 492-1031 Attachment:
| | JWRoe |
| List of Recently Issued NRC Information
| |
|
| |
|
| Notices*SEE PREVOUS PAGE FOR CONCURRENCE
| | CBerlinger |
|
| |
|
| *OLB:DLPQ FGuenther 4/5/89*OGCB/NRR CBerlinger
| | CRossi |
|
| |
|
| 4/7/89*OLB:DLPQ LWiens 4/6/89*OLB:DLPQ KPerkins 4/6/89*TECH ED BCalure 4/7/89*DDIR: DLPQ JZwolinski
| | INFO NOTICE |
|
| |
|
| 4/7/89*DIR: DLPQ JVIRoe 4/7/89 4//a/89 DISTRIBUTION:
| | OFC :OLB: ILPQ :OLR Q o : H:D :D I:LPQ :DIR:DLPQ |
| CENTRAL FILES OLB RF FGuenther SCooley LWlens KPerkins JZwolinski
| |
|
| |
|
| ===JWRoe CBerlinger===
| | :.17w----- -------- |
| CRossi INFO NOTICE OFC :OLB: ILPQ :OLR Q o : H:D :D I:LPQ :DIR:DLPQ- -- * :.17w-----
| | -- ------ * |
| ------ --------NAME :FGue ther:rh :1iens s :J 4 Zw f nski DAE * '/9 W./6t&/89 | | NAME :FGue ther:rh :1iens s 4 :J f Zw nski |
| : 8 : di/ 7/89 : ' /1 /89 : / 7/89 DATE /89 897s t l78 OFC :OG :DOEA/NRR
| |
|
| |
|
| : : :______ : M fiv- :-------------- | | DAE* W./6t&/89 '/9 897s : 8 : di/ 7/89 : 't /1l78/89 : / 7/89 DATE /89 OFC :OG :DOEA/NRR : : : |
| _- -- --------------- | | - -------------- |
| NAME :CBerlng :ERossi : DATE :/1 /89 : / /89 : :}} | | ______ : _- |
| | M fiv- -- :-------------- |
| | NAME :CBerlng :ERossi : |
| | DATE :/1 /89 : / /89 : :}} |
|
| |
|
| {{Information notice-Nav}} | | {{Information notice-Nav}} |
Unsatisfactory Operator Test Results and Their Effect on the Requalification ProgramML031180811 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, 03000306, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
04/14/1989 |
---|
From: |
Rossi C Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-89-040, NUDOCS 8904100376 |
Download: ML031180811 (5) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, 03000306, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:03000306]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:03000306]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, D.C. 20555 April 14, 1989 NRC INFORMATION NOTICE NO. 89-40: UNSATISFACTORY OPERATOR TEST RESULTS AND THEIR
EFFECT ON THE REQUALIFICATION PROGRAM
Addressees
All holders of operating licenses or construction permits for nuclear power
reactors.
Purpose
This information notice is being provided to alert addressees to problems
associated with high failure rates for operators taking requalification
examinations. It is expected that recipients will review the information
for applicability to their facilities and consider actions, as applicable, to avoid similar problems. However, suggestions contained in this information
notice do not constitute NRC requirements; therefore, no specific action or
written response is required.
Description of Circumstances
During the weeks of March 13, 1989, and March 20, 1989, requalification exami- nations were administered by the NRC to six crews of licensed operators at
Turkey Point Units 3 and 4. Three of the six crews performed unsatisfactorily
during the simulator portion of the operating test and 12 of the 24 licensed
operators failed at least one portion (written examination, simulator test, or plant walk-through examination) of the NRC-administered requalification
examinations. As a 'result, the Turkey Point Units 3 and 4 requalification
programs were evaluated as unsatisfactory by the NRC. The number of licensed
operators at the units currently is limited to the 27 licensed operators who
have not failed either a facility or an NRC-administered examination within
the past 12 months.
New crews have been formed using licensed operators who have not failed recent
facility or NRC-administered examinations. Under the terms of a Confirmatory
Action Letter issued by the Regional Administrator, Unit 3 has shut down to
allow the facility licensee time to train the new crews in team performance.
Unit 4 was already in a shutdown status for refueling. The NRC, in conjunction
with the licensee, will perform an operational assessment of the new crews'
performance before concurring in the decision to restart either unit.
'/ IN 89-40
April 14, 1989 Discussion:
The NRC resumed administration of requalification
examinations after conducting
extensive pilot tests of a system for examining candidates
ment on job-relevant tasks of great safety significance. in the work environ- provide licensed senior operators to the NRC examination Facility licensees
quality assurance responsibilities and to concur teams to share the
in the importance and relevancy
of the examinations. The examinations were field
by the examination team. tested before administration
The NRC's confidence in the ability of facility licensees
health and safety depends upon the licensee's ability to ensure public
effective requalification program that maintains to administer an
licensed operators and senior operators at the unit highly qualified, professional
The importance of this aspect of licensee responsibilitycontrols at all times.
cannot be overstated.
No specific action or written response is required
If you have any questions about this matter, please by this information notice.
listed below or the Regional Administrator of the contact the technical contact
appropriate regional office.
£1*les E. Rossi, Director
Divis-ion-of-Operationa--Events-Assessment -
Office of Nuclear Reactor Regulation
Technical Contact:
K. Perkins Jr., NRR
(301) 492-1031 Attachment: List of Recently Issued NRC Information Notices
Attachment
IN 89-40
April 14, 1989 LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information Date of
Notice No. Subject Issuance Issued to
89-39 List of Parties Excluded 4/5/89 All holders of OLs
from Federal Procurement or CPs for nuclear
or Non-Procurement Programs power reactors.
89-38 Atmospheric Dump Valve 4/5/89 All holders of OLs
Failures at Palo Verde or CPs for nuclear
Units 1, 2, and 3 power reactors.
89-37 Proposed Amendments to 4/4/89 All U.S. NRC licensees.
40 CFR Part 61, Air
Emission Standards
for Radionuclides
89-36 Excessive Temperatures 4/4/89 All holders of OLs
in Emergency Core Cooling or CPs for nuclear
'System Piping Located power reactors.
Outside Containment
88-86, Operating with Multiple 3/31/89 All holders of OLs
Supp. 1 Grounds in Direct Current or CPs for nuclear
Distribution Systems power reactors.
89-35 Loss and Theft of Un- 3/30/89 All U.S. NRC byproduct, secured Licensed Material source and special
nuclear material
licensees.
89-34 Disposal of Americium 3/30/89 All holders of an
Well-Logging Sources NRC specific license
authorizing well- logging activities.
89-33 Potential Failure of 3/23/89 All holders of OLs
Westinghouse Steam or CPs for PWRs.
Generator Tube
Mechanical Plugs
89-32 Surveillance Testing 3/23/89 All holders of OLs
of Low-Temperature or CPs for PWRs.
Overpressure-Protection
Systems
OL = Operating License
CP = Construction Permit
IN 89-40
April 14, 1989 Discussion:
The NRC resumed administration of requalification examinations after conducting
extensive pilot tests of a system for examining candidates in the work environ- ment on job-relevant tasks of great safety significance. Facility licensees
provide licensed senior operators to the NRC examination teams to share the
quality assurance responsibilities and to concur in the importance and relevancy
of the examinations. The examinations were field tested before administration
by the examination team.
The NRC's confidence in the ability of facility licensees to ensure public
health and safety depends upon the licensee's ability to administer an
effective requalification program that maintains highly qualified, professional
licensed operators and senior operators at the unit controls at all times.
The importance of this aspect of licensee responsibility cannot be overstated.
No specific action or written response is required by this information notice.
If you have any questions about this matter, please contact the technical contact
listed below or the Regional Administrator of the appropriate regional office.
Charles E. Rossi, Director
Division of Operational Events Assessment
Office of Nuclear Reactor Regulation
Technical Contact:
K. Perkins Jr., NRR
(301) 492-1031 Attachment: List of Recently Issued NRC Information Notices
- SEE PREVOUS PAGE FOR CONCURRENCE
- OLB:DLPQ *OLB:DLPQ *OLB:DLPQ *TECH ED *DDIR: DLPQ *DIR: DLPQ
FGuenther LWiens KPerkins BCalure JZwolinski JVIRoe
4/5/89 4/6/89 4/6/89 4/7/89 4/7/89 4/7/89
CBerlinger
4/7/89 4//a/89
DISTRIBUTION:
CENTRAL FILES
OLB RF
FGuenther
SCooley
LWlens
KPerkins
JZwolinski
JWRoe
CBerlinger
CRossi
INFO NOTICE
OFC :OLB: ILPQ :OLR Q o : H:D :D I:LPQ :DIR:DLPQ
- .17w----- --------
-- ------ *
NAME :FGue ther:rh :1iens s 4 :J f Zw nski
DAE* W./6t&/89 '/9 897s : 8 : di/ 7/89 : 't /1l78/89 : / 7/89 DATE /89 OFC :OG :DOEA/NRR : : :
- --------------
______ : _-
M fiv- -- :--------------
NAME :CBerlng :ERossi :
DATE :/1 /89 : / /89 : :
|
---|
|
list | - Information Notice 1989-01, Valve Body Erosion (4 January 1989)
- Information Notice 1989-02, Criminal Prosecution of Licensee'S Former President for Intentional Safety Violations (9 January 1989)
- Information Notice 1989-03, Potential Electrical Equipment Problems (11 January 1989)
- Information Notice 1989-04, Potential Problems from the Use of Space Heaters (17 January 1989)
- Information Notice 1989-05, Use of Deadly Force by Guards Protecting Nuclear Power Reactors Against Radiological Sabotage (19 January 1989)
- Information Notice 1989-06, Bent Anchor Bolts in Boiling Water Reactor Torus Supports (24 January 1989)
- Information Notice 1989-07, Failures of Small-Diameter Tubing in Control Air, Fuel Oil & Lube Oil Systems Render Emergency Diesel Generators Inoperable (25 January 1989)
- Information Notice 1989-08, Pump Damage Caused by Low-Flow Operation (26 January 1989)
- Information Notice 1989-09, Credit for Control Rods Without Scram Capability in the Calculation of Shutdown Margin (26 January 1989, Topic: Shutdown Margin)
- Information Notice 1989-10, Undetected Installation Errors in Main Steam Line Pipe Tunnel Differential Temperature-Sensing Elements at Boiling Water Reactors (27 January 1989)
- Information Notice 1989-11, Failure of DC Motor-Operated Valves to Develop Rated Torque Because of Improper Cable Sizing (2 February 1989, Topic: Shutdown Margin)
- Information Notice 1989-12, Dose Calibrator Quality Control (9 February 1989)
- Information Notice 1989-13, Alternative Waste Management Procedures in Case of Denial of Access to Low-Level Waste Disposal Sites (8 February 1989, Topic: Shutdown Margin, Authorized possession limits)
- Information Notice 1989-15, Second Reactor Coolant Pump Shaft Failure at Crystal River (16 February 1989, Topic: Shutdown Margin)
- Information Notice 1989-16, Excessive Voltage Drop in DC Systems (16 February 1989, Topic: Shutdown Margin, Battery sizing)
- Information Notice 1989-17, Contamination and Degradation of Safety-Related Battery Cells (22 February 1989)
- Information Notice 1989-18, Criminal Prosecution of Wrongdoing Committed by Suppliers of Nuclear Products or Services (24 August 1990)
- Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design (24 February 1989, Topic: Health Physics Network)
- Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers (27 February 1989, Topic: Health Physics Network)
- Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors (3 March 1989, Topic: Health Physics Network)
- Information Notice 1989-24, Nuclear Criticality Safety (6 March 1989, Topic: Health Physics Network)
- Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities (7 March 1989, Topic: Health Physics Network)
- Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment (7 March 1989, Topic: Health Physics Network)
- Information Notice 1989-27, Limitations on the Use of Waste Forms and High Integrity Containers for the Disposal of Low-Level Radioactive Waste (8 March 1989, Topic: Process Control Program)
- Information Notice 1989-28, Weight and Center of Gravity Discrepancies for Copes-Vulcan Air-Operated Valves (14 March 1989)
- Information Notice 1989-29, Potential Failure of Asea Brown Boveri Circuit Breakers During Seismic Event (15 March 1989)
- Information Notice 1989-30, High Temperature Environments at Nuclear Power Plants (1 November 1990)
- Information Notice 1989-31, Swelling and Cracking of Hafnium Control Rods (22 March 1989)
- Information Notice 1989-32, Surveillance Testing of Low-Temperature Overpressure-Protection Systems (23 March 1989, Topic: Stroke time)
- Information Notice 1989-33, Potential Failure of Westinghouse Steam Generator Tube Mechanical Plugs (23 March 1989)
- Information Notice 1989-34, Disposal of Americium Well-Logging Sources (30 March 1989)
- Information Notice 1989-35, Loss & Theft of Unsecured Licensed Material, Attachment 1 to NRC Information Notice 1990-014: Accidental Disposal of Radioactive Materials. (Also includes Attachments 2 & 3) (30 March 1989)
- Information Notice 1989-35, Loss & Theft of Unsecured Licensed Material, Attachment 1 to NRC Information Notice 1990-014: Accidental Disposal of Radioactive Materials. (Also Includes Attachments 2 & 3) (30 March 1989, Topic: Moisture-Density Gauge)
- Information Notice 1989-36, Excessive Temperatures in Emergency Core Cooling System Piping Located Outside Containment (4 April 1989)
- Information Notice 1989-37, Proposed Amendments to 40 CFR Part 61, Air Emission Standards for Radionuclides (4 April 1989)
- Information Notice 1989-38, Atmospheric Dump Valve Failures at Palo Verde Units 1, 2, and 3 (5 April 1989, Topic: Emergency Lighting)
- Information Notice 1989-39, List of Parties Excluded from Federal Procurement or Non-Procurement Programs (5 April 1989)
- Information Notice 1989-40, Unsatisfactory Operator Test Results and Their Effect on the Requalification Program (14 April 1989)
- Information Notice 1989-41, Operator Response to Pressurization of Low-Pressure Interfacing Systems (20 April 1989)
- Information Notice 1989-42, Failure of Rosemount Models 1153 and 1154 Transmitters (21 April 1989)
- Information Notice 1989-43, Permanent Deformation of Torque Switch Helical Springs in Limitorque SMA-Type Motor Operators (1 May 1989)
- Information Notice 1989-44, Hydrogen Storage on the Roof of the Control Room (27 April 1989, Topic: Coatings)
- Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts (8 May 1989, Topic: Commercial Grade Dedication, Coatings)
- Information Notice 1989-46, Confidentiality of Exercise Scenarios (11 May 1989, Topic: Coatings)
- Information Notice 1989-47, Potential Problems with Worn or Distorted Hose Clamps on Self-Contained Breathing Apparatus (18 May 1989, Topic: Coatings)
- Information Notice 1989-48, Design Deficiency in the Turbine-Driven Auxiliary Feedwater Pump Cooling Water Systems (22 May 1989, Topic: Coatings, Temporary Modification)
- Information Notice 1989-49, Failure to Close Service Water Cross-Connect Isolation Valves (22 May 1989, Topic: Coatings)
- Information Notice 1989-50, Inadequate Emergency Diesel Generator Fuel Supply (30 May 1989)
- Information Notice 1989-51, Potential Loss of Required Shutdown Margin During Refueling Operations (31 May 1989, Topic: Shutdown Margin, Coatings)
- Information Notice 1989-52, Potential Fire Damper Operational Problems (8 June 1989, Topic: Safe Shutdown, Shutdown Margin, Fire Barrier, Fire Protection Program)
... further results |
---|