ML070780529: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Enfwgy 1 CONDITION REPORT Originator:
{{#Wiki_filter:Enfwgy               1   CONDITION REPORT                           CR-PNP-2001-09403 1
CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date:
Originator: CONVERTED DATA                                 Originator Phone: 0 Originator Group: CONVERTED DATA                             Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 04/27/2001 0O:OO                                   Initiated Date: 04/27/2001 0O:OO Condition
04/27/2001 0O:OO CR-PNP-2001-09403 1 Originator Phone: 0 Operability Required:
N Reportability Required:
N Initiated Date:
04/27/200 1 0O:OO Condition


== Description:==
== Description:==


LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING.
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action
FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action


== Description:==
== Description:==
Line 35: Line 30:


EQUIPMENT:
EQUIPMENT:
Tag Name Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS: Tvpe Code Description CONVERTED PR PR.01.9403 TRENDING (For Reference Purposes Only): Trend Tvpe Trend Code KEYWORDS MAINT RULE 5 ADMIN E--w I I ~ ~ I I CR-PNP-2001-09403 I Initiated Date: 4/27/2001 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current Contact: SHATAS, A. Current Significance:
Tag Name                         Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS:
B - APCA Closed by: SHATAS, A. 5/4/200 1 0:OO Summary
Tvpe Code                   Description CONVERTED PR                 PR.01.9403 TRENDING (For Reference Purposes Only):
Trend Tvpe                           Trend Code KEYWORDS                             MAINT RULE
 
5
                                    ~              ~
I                                                I                    I E--w                 I             ADMIN                                CR-PNP-2001-09403 I
Initiated Date: 4/27/2001 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current Contact: SHATAS, A.
Current Significance: B - APCA Closed by: SHATAS, A.                                           5/4/200 1 0:OO Summary


== Description:==
== Description:==
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING.
 
FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks


== Description:==
== Description:==
Line 49: Line 51:


SEE EVALUATION RESPONSE.
SEE EVALUATION RESPONSE.
ASSIGNMENTS Ent43g-y Version: 1 Significance Code: B - APCA Classification Code: NON-SIGNIFICANT Owner Group: Eng DE Mech Civil Struct Staff Performed By: Manning,James L Assignment
 
Ent43g-y                     ASSIGNMENTS                  CR-PNP-2001-09403 Version: 1 Significance Code: B - APCA Classification Code: NON-SIGNIFICANT Owner Group: Eng DE Mech Civil Struct Staff Performed By: Manning,James L               06/08/2001 0O:OO Assignment


== Description:==
== Description:==


CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. CR-PNP-2001-09403 06/08/2001 0O:OO I I Enferpv I CORRECTIVE ACTION I CR-PNP-2001-09403 CA Number: 1 - . - - "_ll _. Name I i - ----- . I- - I_ I---- Group Assigned By: Eng Design Mgmt Assigned To: Eng DE Mech Civil Struct Staff PACE, R. Manning,James L Subassigned To : Originated By: PACE, R. Performed By: MANNING, J. 4/27/2001 0O:OO:OO 5/24/200 1 0O:OO:OO Subperformed By: Approved By: Closed By: PACE, R. 5/24/2001 0O:OO:OO Current Due Date: 08/08/2001 Initial Due Date: 08/08/2001 CA Type: GENERAL Plant Constraint:
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
NONE CA
 
I I CR-PNP-2001-09403 I
Enferpv               I           CORRECTIVE ACTION CA Number:               1
                                    .    --                                        - .-           -     "_ll         _.
I i- -----
I -   1-     I_
I ----
Group                                                   Name Assigned By: Eng Design Mgmt                                           PACE, R.
Assigned To: Eng DE Mech Civil Struct Staff                           Manning,JamesL Subassigned To :
Originated By: PACE, R.                                                 4/27/2001 0O:OO:OO Performed By: MANNING, J.                                                5/24/200 1 0O:OO:OO Subperformed By:
Approved By:
Closed By: PACE, R.                                                 5/24/2001 0O:OO:OO Current Due Date: 08/08/2001                               Initial Due Date: 08/08/2001 CA Type: GENERAL Plant Constraint: NONE CA


== Description:==
== Description:==


CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. Response:
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
Subresponse
 
: CONVERTED DATA Closure Comments: COMPLETE DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
===Response===
PROBLEM REPORT 1.OProblem
CONVERTED DATA Subresponse :
Closure Comments:
COMPLETE DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
PROBLEM REPORT PROBLEM REPORT NO.01-9403 1.OProblem


== Description:==
== Description:==
Large leak reported in the vicinity of AOG building.
Large leak reported in the vicinity of AOG building. Fire system has broken pipe between 12-D-8 and 12-D-9.
Fire system has broken pipe between 12-D-8 and 12-D-9.
: 2. ODirect Cause: Minor fabrication anomalies .Possibly compounded by improper pipe bedding material and placement. See SUDDSRF# 01-64.
: 2. ODirect Cause: Minor fabrication anomalies . Possibly compounded by improper pipe bedding material and placement.
3.@EquipmentPerformance Issues: System Number -33                 Component Number           OComponent Type or Description UMaintenance Rule Functional Failure: NO
See 3. @Equipment Performance Issues: System Number -33 Component Number OComponent Type or Description UMaintenance Rule Functional Failure:
: 4. OCorrective Actions Completed (include Dates if possible) Damaged pipe removal and replacement completed on May 18, 200 1.
NO 4. OCorrective Actions Completed (include Dates if possible)
5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check " N R ' if analysis deals with equipment performance only) N R NO TREND DUE AGE. PIPING WAS INSTALLED APPROXIMATELY 30 YEARS AGO.
Damaged pipe removal and replacement completed on May 18, 200 1. 5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check "NR' if analysis deals with equipment performance only) NR NO TREND DUE AGE. PIPING WAS INSTALLED APPROXIMATELY 30 YEARS AGO. 7.0The significance should: Remain the Same PROBLEM REPORT NO. 01-9403 SUDDSRF# 01-64.
7.0The significance should: Remain the Same 0
0 Completed By:
Completed By: J. MANNINGODate: 005/24/01 0 OEvaluatorMentor Approved By: R. PACE       ODate: 005/24/01 0 0Manager}}
J. MANNINGODate:
005/24/01 0 OEvaluatorMentor Approved By: R. PACE 0 0 Manager ODate: 005/24/01}}

Revision as of 09:18, 23 November 2019

CR-PNP-2001-09403, Fire System Has Broken Pipe Between 12-D-8, 12D-9 in Aog Building
ML070780529
Person / Time
Site: Pilgrim
Issue date: 04/21/2001
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
References
CR-PNP-2001-09403
Download: ML070780529 (4)


Text

Enfwgy 1 CONDITION REPORT CR-PNP-2001-09403 1

Originator: CONVERTED DATA Originator Phone: 0 Originator Group: CONVERTED DATA Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 04/27/2001 0O:OO Initiated Date: 04/27/2001 0O:OO Condition

Description:

LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action

Description:

Suggested Action

Description:

EQUIPMENT:

Tag Name Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS:

Tvpe Code Description CONVERTED PR PR.01.9403 TRENDING (For Reference Purposes Only):

Trend Tvpe Trend Code KEYWORDS MAINT RULE

5

~ ~

I I I E--w I ADMIN CR-PNP-2001-09403 I

Initiated Date: 4/27/2001 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current Contact: SHATAS, A.

Current Significance: B - APCA Closed by: SHATAS, A. 5/4/200 1 0:OO Summary

Description:

LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks

Description:

PR=EF 2.4.54 FIRE PROTECTION AOG MROl107828 MCDONNELL Closure

Description:

SEE EVALUATION RESPONSE.

Ent43g-y ASSIGNMENTS CR-PNP-2001-09403 Version: 1 Significance Code: B - APCA Classification Code: NON-SIGNIFICANT Owner Group: Eng DE Mech Civil Struct Staff Performed By: Manning,James L 06/08/2001 0O:OO Assignment

Description:

CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.

I I CR-PNP-2001-09403 I

Enferpv I CORRECTIVE ACTION CA Number: 1

. -- - .- - "_ll _.

I i- -----

I - 1- I_

I ----

Group Name Assigned By: Eng Design Mgmt PACE, R.

Assigned To: Eng DE Mech Civil Struct Staff Manning,JamesL Subassigned To :

Originated By: PACE, R. 4/27/2001 0O:OO:OO Performed By: MANNING, J. 5/24/200 1 0O:OO:OO Subperformed By:

Approved By:

Closed By: PACE, R. 5/24/2001 0O:OO:OO Current Due Date: 08/08/2001 Initial Due Date: 08/08/2001 CA Type: GENERAL Plant Constraint: NONE CA

Description:

CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.

Response

CONVERTED DATA Subresponse :

Closure Comments:

COMPLETE DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.

PROBLEM REPORT PROBLEM REPORT NO.01-9403 1.OProblem

Description:

Large leak reported in the vicinity of AOG building. Fire system has broken pipe between 12-D-8 and 12-D-9.

2. ODirect Cause: Minor fabrication anomalies .Possibly compounded by improper pipe bedding material and placement. See SUDDSRF# 01-64.

3.@EquipmentPerformance Issues: System Number -33 Component Number OComponent Type or Description UMaintenance Rule Functional Failure: NO

4. OCorrective Actions Completed (include Dates if possible) Damaged pipe removal and replacement completed on May 18, 200 1.

5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check " N R ' if analysis deals with equipment performance only) N R NO TREND DUE AGE. PIPING WAS INSTALLED APPROXIMATELY 30 YEARS AGO.

7.0The significance should: Remain the Same 0

Completed By: J. MANNINGODate: 005/24/01 0 OEvaluatorMentor Approved By: R. PACE ODate: 005/24/01 0 0Manager