LICENSEE: CONSTELLATION ENERGY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT  
LICENSEE:       CONSTELLATION ENERGY, LLC FACILITY:       R.E. GINNA NUCLEAR POWER PLANT


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MARCH 25, 2008, ANNUAL ASSESSMENT AND REGULATORY PERFORMANCE MEETINGS WITH CONSTELLATION ENERGY On March 25, 2008, at 2:00 p.m., an Annual Assessment and Regulatory Performance Meetings were conducted at the Ontario Town Hall between the Nuclear Regulatory Commission (NRC) and Constellation Energy (Constellation). The NRC requested this meeting with Constellation management to discuss the NRC's Annual Assessment of the R.E. Ginna Nuclear Power Plant (Ginna) in 2007 and to discuss the NRC's review of the Yellow performance indicator (PI) associated with Emergency Preparedness in 2007.
OF MARCH 25, 2008, ANNUAL ASSESSMENT AND REGULATORY PERFORMANCE MEETINGS WITH CONSTELLATION ENERGY On March 25, 2008, at 2:00 p.m., an Annual Assessment and Regulatory Performance Meetings were conducted at the Ontario Town Hall between the Nuclear Regulatory Commission (NRC) and Constellation Energy (Constellation). The NRC requested this meeting with Constellation management to discuss the NRCs Annual Assessment of the R.E. Ginna Nuclear Power Plant (Ginna) in 2007 and to discuss the NRCs review of the Yellow performance indicator (PI) associated with Emergency Preparedness in 2007.
The NRC presented and discussed its assessment of the safety performance of Ginna for the period between January1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, 2007 Ginna performance assessment results, and NRC supplemental inspection results for the Yellow Emergency Preparedness PI. As part of the meetings, Constellation presented an overview of their performance and initiatives in selected areas. Members of the public and local government officials observed the meeting and were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.
The NRC presented and discussed its assessment of the safety performance of Ginna for the period between January1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, 2007 Ginna performance assessment results, and NRC supplemental inspection results for the Yellow Emergency Preparedness PI. As part of the meetings, Constellation presented an overview of their performance and initiatives in selected areas. Members of the public and local government officials observed the meeting and were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.
At the end of the meeting, the NRC answered questions from members of the public and local officials. NRC's assessment letter can be found in ADAMS with an Accession Number of ML080610014. The meeting notice with the agenda can be found with Accession Number ML080701189. The NRC slides of the meeting can be found with Accession Number ML080701191. Constellation's slides for the meeting can be found with Accession Number ML080880406.  
At the end of the meeting, the NRC answered questions from members of the public and local officials. NRC's assessment letter can be found in ADAMS with an Accession Number of ML080610014. The meeting notice with the agenda can be found with Accession Number ML080701189. The NRC slides of the meeting can be found with Accession Number ML080701191. Constellation's slides for the meeting can be found with Accession Number ML080880406.
Sincerely,
                                                    /RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects


Sincerely,                    /RA/
==Enclosure:==
Glenn T. Dentel, Chief        Projects Branch 1        Division of Reactor Projects
Meeting Attendees


==Enclosure:==
2 NRC Attendees:
Meeting Attendees Enclosure 2   NRC Attendees:
D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:
D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:
M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation State/Local Government Attendees:
M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation State/Local Government Attendees:
B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board Public Attendees:
B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board Public Attendees:
D. Clark N. Kieidrowski N. Ibarrola  
D. Clark N. Kieidrowski N. Ibarrola Enclosure


2Attachment NRC Attendees:
2 Attachment NRC Attendees:
D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:
D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:
M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation  
M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation State/Local Government Attendees:
 
B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board Public Attendees:
State/Local Government Attendees:
D. Clark N. Kieidrowski N. Ibarrola SUNSI Review Complete:          GTD          (Reviewer=s Initials)                    ML080920406 DOCUMENT NAME: T:\DRP\BRANCH1\ROP Assessment Process Documents\2008 ROP EOC stuff\Ginna EOC stuff + attachments\Ginna Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE              RI/DRP                    RI/DRP NAME                *BBickett/KMT FOR/        GDentel/GTD DATE                04/01/08                  04/01/08
              *concurred via telecon                            OFFICIAL RECORD COPY


Public Attendees:
3 Distribution:
D. Clark N. Kieidrowski N. Ibarrola SUNSI Review Complete:          GTD                  (Reviewer
S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting)
=s Initials)                                ML080920406 DOCUMENT NAME:  T:\DRP\BRANCH1\ROP Assessment Process Documents\2008 ROP EOC stuff\Ginna EOC stuff + attachments\Ginna Meeting Summary.doc  After declaring this document AAn Official Agency Record
J. Lubinski, NRR D. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)}}
@ it will be released to the Public. To receive a copy of this document, indicate in the box: 
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy OFFICE  RI/DRP    RI/DRP                NAME  *BBickett/KMT FOR/
GDentel/GTD DATE  04/01/08  04/01/08 
  *concurred via telecon OFFICIAL RECORD COPY 3Distribution
: S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting) J. Lubinski, NRR D. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)}}

Latest revision as of 19:17, 14 November 2019

Summary of March 25, 2008, Annual Assessment and Regulatory Performance Meetings with Constellation Energy
ML080920406
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/01/2008
From: Glenn Dentel
Reactor Projects Branch 1
To:
Reactor Projects Branch 1
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML080920406 (5)


Text

April 1, 2008 MEETING

SUMMARY

LICENSEE: CONSTELLATION ENERGY, LLC FACILITY: R.E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF MARCH 25, 2008, ANNUAL ASSESSMENT AND REGULATORY PERFORMANCE MEETINGS WITH CONSTELLATION ENERGY On March 25, 2008, at 2:00 p.m., an Annual Assessment and Regulatory Performance Meetings were conducted at the Ontario Town Hall between the Nuclear Regulatory Commission (NRC) and Constellation Energy (Constellation). The NRC requested this meeting with Constellation management to discuss the NRCs Annual Assessment of the R.E. Ginna Nuclear Power Plant (Ginna) in 2007 and to discuss the NRCs review of the Yellow performance indicator (PI) associated with Emergency Preparedness in 2007.

The NRC presented and discussed its assessment of the safety performance of Ginna for the period between January1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, 2007 Ginna performance assessment results, and NRC supplemental inspection results for the Yellow Emergency Preparedness PI. As part of the meetings, Constellation presented an overview of their performance and initiatives in selected areas. Members of the public and local government officials observed the meeting and were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.

At the end of the meeting, the NRC answered questions from members of the public and local officials. NRC's assessment letter can be found in ADAMS with an Accession Number of ML080610014. The meeting notice with the agenda can be found with Accession Number ML080701189. The NRC slides of the meeting can be found with Accession Number ML080701191. Constellation's slides for the meeting can be found with Accession Number ML080880406.

Sincerely,

/RA/

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Enclosure:

Meeting Attendees

2 NRC Attendees:

D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:

M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation State/Local Government Attendees:

B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board Public Attendees:

D. Clark N. Kieidrowski N. Ibarrola Enclosure

2 Attachment NRC Attendees:

D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch I, DRP K. Kolaczyk, Senior Resident Inspector - Ginna M. Marshfield, Resident Inspector - Ginna B. Bickett, Senior Project Engineer, DRP D. Pickett, Project Manager, Nuclear Reactor Regulation S. Ibarrola, Reactor Engineer, DRP Constellation Attendees:

M. Heffley, Senior Vice President and Chief Nuclear Officer - Constellation J. Carlin, Site Vice President - Ginna D. Holm, Plant General Manager - Ginna J. Yoe, Manager Nuclear Operations - Ginna M. Korsnick, Vice President Operations Support - Constellation L. Larragoite, Vice President Technical Services - Constellation D. Blankenship, Constellation D. Joslin, Constellation G. Detter, Constellation J. Pacher, Constellation J. Sullivan, Constellation J. Kramer, Constellation E. Hedderman, Constellation A. Allen, Constellation E. Larson, Constellation J. Brown, Constellation J. Jones, Constellation L. Lundberg, Constellation State/Local Government Attendees:

B. Kelsch, Supervisor - Town of Ontario G. Bastedo, Director, Wayne County Emergency Management Office J. Switzer, Ontario Town Board Public Attendees:

D. Clark N. Kieidrowski N. Ibarrola SUNSI Review Complete: GTD (Reviewer=s Initials) ML080920406 DOCUMENT NAME: T:\DRP\BRANCH1\ROP Assessment Process Documents\2008 ROP EOC stuff\Ginna EOC stuff + attachments\Ginna Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME *BBickett/KMT FOR/ GDentel/GTD DATE 04/01/08 04/01/08

  • concurred via telecon OFFICIAL RECORD COPY

3 Distribution:

S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting)

J. Lubinski, NRR D. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)