ML080701189

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Constellation Management to Discuss the Nrc'S Annual Assessment of the R.E. Ginna Plant in 2007 and to Discuss the Nrc'S Review of the Yellow Performance Indicator Associated with Emergency Preparedness in 2007
ML080701189
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/10/2008
From:
NRC Region 1
To:
Dentel, G RGN-I/DRP/BR1/610-337-5233
Shared Package
ML080660659 List:
References
MN 08-005
Download: ML080701189 (4)


Text

{{#Wiki_filter:March 10, 2008 MN No. 08-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Constellation Energy, LLC Facility: R.E. Ginna Nuclear Power Plant Docket No: 50-244 Date/Time: March 25, 2008, at 2:00 p.m. Location: Ontario Town Hall 1850 Ridge Road Ontario, New York, 14519

Purpose:

The NRC requested this meeting with Constellation management to discuss the NRCs Annual Assessment of the R.E. Ginna Nuclear Power Plant in 2007 and to discuss the NRCs review of the Yellow performance indicator (PI) associated with Emergency Preparedness in 2007. Attendees*: NRC: D. Lew, Director, Division of Reactor Projects (DRP), Region I G. Dentel, Chief, Projects Branch 1, DRP K. Kolaczyk, Senior Resident Inspector, R.E. Ginna M. Marshfield, Resident Inspector, R.E. Ginna T. Walker, Senior Project Engineer, DRP B. Bickett, Senior Project Engineer, DRP Licensee: M. Heffley, Senior Vice President and Chief Nuclear Officer J. Carlin, Site Vice President, R.E. Ginna D. Holm, Plant General Manager, R.E. Ginna J. Yoe, Manager Nuclear Operations, R.E. Ginna Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. NRCs assessment letter can be found in ADAMS with an Accession Number of ML080610014. This meeting notice with the enclosed meeting agenda is located in ADAMS with Accession Number ML080701189. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of R.E. Ginna Nuclear Power Plant can be found on the NRC web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: GTD@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by via telephone to the NRC meeting contact.

____/RA/________ Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects cc w/encl: M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc. B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network

3 Agenda NRCs Annual Assessment Meeting And Regulatory Performance Meeting R.E. Ginna Nuclear Power Plant Introduction .......................................................................................................NRC (3 minutes) Review of Reactor Oversight Process ................................................................NRC (5 minutes) National Summary of Plant Performance............................................................NRC (7 minutes) Discussion of Ginna's Performance and NRCs Review of the Yellow PI ..........NRC (20 minutes) Constellation's Response and Remarks .............................................. Constellation (20 minutes) Closing Remarks ................................................................................................NRC (5 minutes) Short Break ................................................................................................................ (5 minutes) NRC to address public questions ..................................NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting And Regulatory Performance Meeting R.E. Ginna Nuclear Power Plant Introduction .............................................................................................................................................................. NRC (3 minutes) Review of Reactor Oversight Process ....................................................................................................................... NRC (5 minutes) National Summary of Plant Performance ................................................................................................................... NRC (7 minutes) Discussion of R.E. Ginna's Performance and NRCs Review of the Yellow PI.......................................................... NRC (20 minutes) Constellation's Response and Remarks ......................................................................................................Constellation (20 minutes) Closing Remarks ....................................................................................................................................................... NRC (5 minutes) Short Break ........................................................................................................................................................................ (5 minutes) NRC to address public questions ......................................................................................... NRC/Members of the Public (as needed) J. Lubinski, NRR Distribution w/encl: (VIA E-MAIL) M. Kowal, NRR Executive Director for Operations, OEDO D. Pickett, PM, NRR (RIDSEDOMAILCENTER RESOURCES) B. Vaidya, PM, NRR Deputy Executive Director for Reactor Programs, OEDO G. Dentel, DRP (RIDSEDOMAILCENTER RESOURCES) B. Bickett, DRP Director, Office of Nuclear Reactor Regulation, NRR K. Kolaczyk, DRP, Senior Resident Inspector (RIDSNRROD) M. Marshfield, DRP, Resident Inspector Deputy Director, Office of Nuclear Reactor Regulation, M. Rose, Resident OA NRR/ADPR (RIDSNRROD) D. Roberts, DRS Director, Division of Regulatory Improvement Programs, M. Gamberoni, DRS NRR (RIDSNRRDRIP) D. Screnci, PAO Director, Division of Inspection Program Management, NRR N. Sheehan, PAO (RIDSNRRDIPM) N. McNamara, SLO Director, Division of Licensing Project Management, NRR M. McLaughlin, SLO (RIDSNRRDLPM) Region I Docket Room (w/concurrences) Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI) Regional Administrator Secretary, RI Asst. General Counsel Materials Litigation and Enforcement, Deputy Regional Administrator Secretary, RI OGC (RIDSOGCMAILCENTER) DRP Division Secretary, RI S. Collins, RA DRS Division Secretary, RI M. Dapas, DRA DNMS Division Secretary, RI G. West, RI OEDO DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: T:\DRP\BRANCH1\ROP Assessment Process Documents\2008 ROP EOC stuff\Ginna EOC stuff + attachments\Ginna Meeting notice and agenda.wpd SUNSI Review Complete: BAB (Reviewers Initials) After declaring this document An Official Agency Record it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB GDentel/BAB for DATE 03/10/08 03/10/08 OFFICIAL RECORD COPY}}