ML13056A534

From kanterella
Jump to navigation Jump to search
Summary of Category 1 Meeting with Constellation Energy Nuclear Group - Pre-Application Meeting to Discuss Proposed License Amendment for Transition to National Fire Protection Association'S Standard (NFPA) 805, for R.E. Ginna Nuclear
ML13056A534
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/25/2013
From: Thadani M
Plant Licensing Branch 1
To:
Thadani M
References
Download: ML13056A534 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 25, 2013 LICENSEE: Constellation Energy Nuclear Group LLC R. E. Ginna Nuclear Power Plant LLC FACILITy: R. E. Ginna Nuclear Power Plant

SUBJECT:

SUMMARY

OF February 20, 2013, CATEGORY 1 MEETING WITH CONSTELLATION ENERGY NUCLEAR GROUP -PRE-APPLICATION MEETING TO DISCUSS PROPOSED LICENSE AMENDMENT FOR TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805, FOR R. E. GINNA NUCLEAR POWER PLANT.

On February 20,2013, the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting with representatives of Constellation Energy Nuclear Group LLC, the licensee for R. E.

Ginna Nuclear Power Plant (Ginna), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The purpose of the meeting was for the licensee to discuss its forthcoming submittal of proposed request for an amendment supporting tranSition of Ginna's current fire protection program licensing basis to National Fire Protection AssOCiation Standard (NFPA) 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants."

The meeting notice and the agenda for the meeting are publicly available at Agencywide Document Access and Management System (ADAMS) AcceSSion No. ML13037A270. The licensee's presentation slides are available in ADAMS at Accession No. ML13053A296. A fist of meeting attendees is enclosed.

The licensee discussed the Ginna's current fire protection licensing baSiS, and overview of its plans for transition to NFPA 805 standard. The licensee described its major Modifications credited to its transition to NFPA 805, and stated that it plans to submit a request for an amendment to support the transition to NFPA 805 by March 29, 2013.

~ 2 ~

Please direct any inquiries to me at (301) 415-1476 or email Mohan.Thadani@nrc.gov.

Mohan C. Thadani, Senior Project Manager Plant licensing Branch 1-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-244

Enclosure:

list of Attendees cc w/encl: Distribution via listserv

LIST OF MEETING A TIENDEES AND BRIDGE LINE PARTICIPANTS PUBLIC MEETING WITH CONSTELLATION ENERGY NUCLEAR GROUP LLC R. E. GINNA NUCLEAR POWER PLANT FEBRUARY 20, 2013 NAME AFFILIATION Mohan Thadani NRC/N RRIDO RlILPLI-1 Elliott Flick Constellation Energy Nuclear Group (CENG)

Jeff Stone CENG Michael Lilley CENG Jarred Jackson CENG Thomas Mogren CENG Jim McQuighan CENG Rob Cavzoe CENG Paul Amico Hughes Associates, Inc.

Suzanne Loyd Hughes Associates, Inc.

Sean Gillen CENG Donnie Harrison NRC/NRRlDRA/APLA Leslie C. Fields NRC/NRR/DRAIAFPB Joseph Gitter NRC/DRA Bernard Litkett NRC/NRR/DRA/AFPB Dan O'Neal NRC/NRRlDRAIAPLA Paul Lain NRC/NRR/DRA/AFPB Harry Barrett NRC/NRR/DRA/AFPB J. S. Hyslop NRC/NRRIDRAIAPLA Alex Klein NRC/NRR/DRAIAFPB Natividad Hernandez CFE - Laguna Verde (Mexico)

Enclosure

ML13056A534 OFFICE NRRlLPLI-1IPM NRRlLPLI-1/1.J\ NRRlAPWBC NRRlAFPB/BC NRRlLPLI-1/BC NRRlLPL4/PM NAME MThadani KGoldstein DHarrison AKlein SMeighan MThadani DATE 03/08/13 03/07/13 03111/13 03108/13 03/22/13 03125113