Text

NRC Annual Performance Assessment of Ginna 2007 Reactor Oversight Program

Purpose of Todays Meeting Discuss Constellations Plant Performance for 2007 Discuss the NRCs inspection review for the supplemental inspection associated with the 2007 Yellow performance indicator in the Emergency Preparedness cornerstone Provide Constellation the opportunity to respond to the NRCs Annual Performance Assessment and identify new or existing programs to maintain or improve their performance Provide stakeholders the opportunity to engage the NRC staff on plant performance issues and our role in ensuring safe plant operations

Agenda Introduction NRC Organization and Performance Goals Reactor Oversight Process (ROP)

National Summary of Plant Performance Ginnas Plant Performance Assessment NRCs Supplemental Inspection Review Constellation Response and Remarks NRC Closing Remarks Break NRC available to address public questions

Region I Organization Samuel J. Collins Regional Administrator Marc J. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director Marsha K. Gamberoni Director Division of Reactor Safety Darrell J. Roberts Deputy Director Glenn T. Dentel Branch Chief Regional Specialists Ginna Resident Inspectors Ken Kolaczyk Mark Marshfield Project Engineers Brice Bickett Justin Hawkins

NRC Strategic Plan Goals 3/4 Safety: Ensure adequate protection of public health and safety and the environment 3/4 Security: Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process 3 Strategic Areas & 7 Cornerstones Reactor Safety Radiation Safety Safeguards Initiating Events Mitigating Systems Barrier Integrity Emergency Preparedness Occupational Radiation Safety Public Radiation Safety Physical Protection

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspection Areas Equipment Alignment Maintenance Fire Protection Operator Response Emergency Preparedness Radiological and Environmental Monitoring Worker Radiation Protection Corrective Action Program Corrective Action Case Reviews

Significance Threshold Performance Indicators 3/4 Green Baseline Inspection 3/4 White Increases NRC oversight 3/4 Yellow Requires more NRC oversight 3/4 Red Requires most NRC oversight Inspection Findings 3/4 Green Very low safety issue 3/4 White Low to moderate safety issue 3/4 Yellow Substantial safety issue 3/4 Red High safety issue

Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance

National Summary of Plant Performance Status at End of 2007 Licensee Response 87 Regulatory Response 8

Degraded Cornerstone 8

Multiple/Repetitive Degraded Cornerstone 1

Unacceptable 0

Total 104

National Summary of Plant Performance Status at End of 2007 Performance Indicator Results 3/4 Green 1954 3/4 White 8

3/4 Yellow 2

3/4 Red 0

Total Inspection Findings 3/4 Green 918 3/4 White 9

3/4 Yellow 2

3/4 Red 0

NRC Inspection Activities at Ginna 3/4 5500 hours0.0637 days <br />1.528 hours <br />0.00909 weeks <br />0.00209 months <br /> of inspection and related activities 3/4 2 resident inspectors on-site 3/4 7 regional inspections 3/4 4 major team inspections:

Physical Security Inspection Component Design Bases Inspection Emergency Preparedness Exercise Licensed Operator Requalification Inspection

2007 Ginna PIs / Findings One Yellow Performance Indicator (PI) in the Emergency Preparedness cornerstone during the 1st quarter of 2007 All other PIs were Green Seven Green inspection findings Examples include Inadvertent Main Steam Isolation Valve Closure Repeat Standby Auxiliary Feedwater Gasket Leakage

NRC Annual Assessment Summary Constellation operated the plant safely and in a manner that preserved public health and safety and protected the environment Ginna was in the Licensee Response column of the NRCs Action Matrix for the last three quarters of 2007 and the Degraded Cornerstone column in the 1st quarter of 2007 All cornerstone objectives were fully met NRC plans baseline inspections for the remainder of 2008

Regulatory Performance Meeting and Supplemental Inspection Review 1st Quarter 2007 Yellow PI in the Emergency Preparedness Cornerstone

Purpose of Regulatory Performance Meeting Discuss the NRCs supplemental inspection results (IP 95002) in a public forum Provide opportunity for Constellation management to inform NRC of programs and corrective actions to improve performance

Yellow Performance Indicator (PI) -

Emergency Response Organization (ERO) Drill Participation During the 1st quarter of 2007, Constellation identified that the ERO Drill Participation PI had transitioned to Yellow due to control room communicators not receiving a post-qualification drill Constellation initiated immediate corrective measures and commenced a root cause evaluation team ERO Drill Participation PI returned to Green in the 2nd quarter of 2007

Supplemental Inspection Summary Overall, Constellation identified the broad organizational issues that contributed to the Yellow PI Constellation has addressed the Emergency Preparedness performance issues Constellations review identified an apparent violation associated with Ginna Emergency Plan changes that occurred between 1996 and 2001

Constellation was slow to recognize the extent of the organizational issues within the Emergency Preparedness organization Constellations review did not fully consider the potential impact of the organizational issues on other processes and programs Subsequently, Constellation has appropriate corrective actions identified or implemented to address all identified performance issues NRC Observations

Constellation Response and Remarks Mr. John Carlin Site Vice President -

Ginna Constellation Energy

End of the Presentation Nuclear Regulatory Commission -

Region I King of Prussia, Pennsylvania March 25, 2008

NRC Representatives David C. Lew, Division Director, DRP 3/4 (610) 337-5229 Glenn T. Dentel, Branch Chief 3/4 (610) 337-5233 Kenneth Kolaczyk, Senior Resident Inspector 3/4 (315) 524-6935 Mark Marshfield, Resident Inspector 3/4 (315) 524-6935 Brice Bickett, Senior Project Engineer 3/4 (610) 337-6959 Douglas Pickett, Project Manager, NRR 3/4 (301) 415-1364

Contacting the NRC Report an emergency (301) 816-5100 (call collect)

Report a safety concern:

(800) 695-7403 Allegation@nrc.gov General information or questions www.nrc.gov Select About NRC

- Select How We Regulate

Reference Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html Public Document Room 1-800-397-4209 (Toll Free)