{{#Wiki_filter:" " March 16, 2015  
{{#Wiki_filter:UNITED STATES rch 16, 2015


Mr. Dennis President and CEO/CNO STP Nuclear Operating Company
==SUBJECT:==
 
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND 05000499/2015403
P.O. Box 289 Wadsworth, TX 77483
 
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND  
 
05000499/2015403


==Dear Mr. Koehl:==
==Dear Mr. Koehl:==
On February 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the South Texas Project Electric Generating Station, Units 1 and 2. An NRC inspector discussed the results of this inspection wi th you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
On February 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the South Texas Project Electric Generating Station, Units 1 and 2. An NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.


The NRC inspector documented one finding of very low security significance (Green) in this report. This finding involved a vio lation of NRC requirements.
The NRC inspector documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements.


If you contest the violation or the significance of this Non-Cited Violation (NCV), you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the South Texas Project Electric Generating Station.
If you contest the violation or the significance of this Non-Cited Violation (NCV), you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the South Texas Project Electric Generating Station.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronic ally for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Line 43: Line 36:
Sincerely,
Sincerely,
/RA/
/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety  
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Nonpublic Enclosure:
 
NRC Inspection Report 05000498/2015403; 05000499/2015403 w/Attachment:
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80  
Supplemental Information cc w/enclosure:
 
Mr. John Milliff Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 cc w/o enclosure:
Nonpublic Enclosure:
Electronic Distribution for South Texas Project Electric Generating Station ML15075A168 Entire Report: Non-Sensitive Publicly Available Keyword:
NRC Inspection Report 05000498/2015403; 05000499/2015403 w/Attachment:  
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Rollins    NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
 
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Rollins    NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JRollins/dch DHolman MHaire NOKeefe MHaire SIGNATURE /RA/ /RA/ MSH for /RA/ /RA/ /RA/
Supplemental Information  
DATE 3/11/15 3/11/15 3/11/15 3/13/15 3/16/15 Letter to Dennis from Mark S. Haire, dated March 16, 2015 SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND 05000499/2015403 Electronic distribution by RIV w/enclosure:
 
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
cc w/enclosure: Mr. John Milliff Manager, Security STP Nuclear Operating Company  
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
 
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
P.O. Box 289  
 
Wadsworth, TX 77483 cc w/o enclosure:
Electronic Distribution for South Texas Project Electric Generating Station  
 
ML15075A168 Entire Report: SUNSI Review Complete By: J. Rollins Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only: SUNSI Review Complete By: J. Rollins Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JRollins/dch DHolman MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ MSH for /RA/ /RA/ /RA/ DATE 3/11/15 3/11/15 3/11/15 3/13/15 3/16/15 Letter to Dennis from Mark S. Haire, dated March 16, 2015  
 
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND 05000499/2015403  
 
Electronic distribution by RIV w/enclosure
: Security Specialist/NSIR (Eric.Wharton@nrc.gov) Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov)  
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
 
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Electronic distribution by RIV w/o enclosure
STP Administrative Assistant (Lynn.Wright@nrc.gov)
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Nicholas.Hernandez@nrc.gov) Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
STP Administrative Assistant (Lynn.Wright@nrc.gov)
 
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 15:14, 31 October 2019

IR 05000498/2015403 and 05000499/2015403, on 02/26/15, South Texas Project Electric Generating Station, Units 1 & 2, NRC Security Inspection Report
ML15075A168
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/16/2015
From: Mark Haire
Plant Support Branch-1
To: Koehl D
South Texas
References
IR 2015403
Download: ML15075A168 (4)


Text

UNITED STATES rch 16, 2015

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND 05000499/2015403

Dear Mr. Koehl:

On February 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the South Texas Project Electric Generating Station, Units 1 and 2. An NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspector documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements.

If you contest the violation or the significance of this Non-Cited Violation (NCV), you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the South Texas Project Electric Generating Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Nonpublic Enclosure:

NRC Inspection Report 05000498/2015403; 05000499/2015403 w/Attachment:

Supplemental Information cc w/enclosure:

Mr. John Milliff Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 cc w/o enclosure:

Electronic Distribution for South Texas Project Electric Generating Station ML15075A168 Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Rollins NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Rollins NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JRollins/dch DHolman MHaire NOKeefe MHaire SIGNATURE /RA/ /RA/ MSH for /RA/ /RA/ /RA/

DATE 3/11/15 3/11/15 3/11/15 3/13/15 3/16/15 Letter to Dennis from Mark S. Haire, dated March 16, 2015 SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000498/2015403 AND 05000499/2015403 Electronic distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Electronic distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)