{{#Wiki_filter:The following pages are proposed changes to the Unit 2 Technical Specifications:
{{#Wiki_filter:The following pages are proposed changes to the Unit 2 Technical Specifications:
1----Vice Presid!lit  
 
-ruel SUWlY General ruel suwty Gmeral Manaqer -Corporate C)illli ty Assunuce "51'1aqer  
1----
-Qi\ Servi .... Manooer-a>
Scnlor Vice f'rnAident -
Aaditl!I and Tralninq Gereral K!riaqer -Prob:t.im  
Dlel"9Y suwly ard Erqineerinq Gmeral Manaqer -                                                                                                                              General HaMqer -
$1.sJDort Plant Fnu*. Asst. Vice Preeident
Vice Presid!lit -                                 Corporate                                                                            Vice President- ro.aJuctioo                          IJ.oenai..ng !Ind ruel SUWlY                               C)illli ty Assunuce                                                                                                                               Envirament r--------
-Production -Per9alnel Mfaira
1 On-Site r---                                                                1-------'  I    Safety Reviev IL ______
* ldninistratiml Training Manaqer ft:fr. -M.icle&r (l11e1". support rt.X"lenrf\Jel Cyr.le DYJr. Health l'hy!llr.bt Scnlor Vice f'rnAident
Group    **
-Dlel"9Y suwly ard Erqineerinq Vice President-ro.aJuctioo r---
_
-!b:'lear Prcxluctioo Jltrrq. rlamirq ' Security Frqr.
General ~r                        "51'1aqer - Qi\         Manooer-a>
* Fire Protection SUJvirt General HaMqer -IJ.oenai..ng
ruel suwty                        Servi ....               Aaditl!I and Tralninq Asst. Vice Preeident -
!Ind Envirament r--------1 On-Site I Safety 1-------'
Production
Reviev I Group **
                                                                                                  ~.    - Per9alnel Mfaira
Gererat..irq Statim L ______ _ *
* ldninistratiml Training Manaqer Gereral K!riaqer -                                                                                                         General~          -
* I.hit 2 Aoqui1:"'11!1lt  
Prob:t.im $1.sJDort                                                                                                       !b:'lear Prcxluctioo
# Dl.n!ct """""" !or,__ _....,..._.
* ft:fr. - M.icle&r                                                                   ~-SalSTI (l11e1". support                                                                   Gererat..irq Statim
FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT ------------------------  
                                                                                                                                                                                                                        **   I.hit 2 Aoqui1:"'11!1lt
** w l ' ' '
                                                                                                                                                                                                                          #   Dl.n!ct """"""   !or,__ _....,..._.
* I I I I Ol'fo-4m .. _.I STATION DUALITY I ASSISTANT TO MANAGER ASSURANCE  
rt.X"lenrf\Jel                            Jltrrq. rlamirq
*  
                                                                            ~r.. Plant Fnu*.                      Health l'hy!llr.bt Cyr.le DYJr.                            ' Security Frqr.        Fire Protection SUJvirt FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT
-...,If. I SECURITY SAFETY SUl'E RVISOR SRO -lf.llllOR REACTOfl Of'ERATOR RO -REACTOR OPERATOR t 1..-... i:.-1_ ..... 1u1-a.-_1
                                                                                                                                                                                                                                                  ------- --- ---- --- - ------
 
l
                                        *                                                                                                                                                                                   .
    ''
                                                                                                                                                                                                                  <
I                                                                                  MANAGER-I                                                                                   SALEM                                                          I I       .
    '                                                                                                                                                                                                                  "
GENERATING I
                                                                                                                                                                                                                            .
I Ol'fo-4m I                                                                                  STATION
* 11 ft._,__          r    I      .I
                      ~ .. _.I
                                                                                                                                                                ,_____ ,__
I Ot:&deg;F S1rE. 1          I I        -*
I I
ASSISTANT TO MANAGER CHIEF ENGINEER I t-----              - - - - I -- - --
T I
MAINTENANCE EHGINEER I
I I
l STATION                                                                                                                                              I            I OFFICE~
DUALITY                                                                                                          STATION                  STATION REACTOR                                                                          RADIATION ASSURANCE
* OPERATING                PUUOHMANCE                l'ROTECTION                      ADMIM
          ~1111muA -           ...,If.                                                       ENGINEER ENGINEER t                ENGINEER                  ENGINEER                        TRAJOR
**w                                              I                                                              I                                                I SHIFT                      SENIOR              SENIOR                    "--"'1>*
IENIOR ~OT.
SECURITY               SAFETY TECHNICAL SENIOR SHIFT
:r ... c.        e>1~1~nty                          SENIOR SUl'E RVISOR           su.&#xa3;RV~
ADVISORS SUPERVISOR-SRO          ..,._
SUl'ERVISOR-        SUPERVISOR -
QHiMlli'JA&#xa5; SUPERVISOR -
ftAB. PROT.
MAIN TE NANCE SUI'&#xa3; RVISOR I
SHIFT                  ..c                                            MAINTENANCE    OFFICE STAFF                      SUPERVISOR-                                                          SUPERVISOR    IUl'ERVISOR IUl'ERVISOR        CHEMISTRI'      RAD. PROT.
SRO I  SVP~          StJPt'*
SRO -     lf.llllOR REACTOfl Of'ERATOR I
a.----- . . __,.._____ _
RO - REACTOR OPERATOR BOILER REl'AIR t 1..- ... i : . - 1 _ ..... 1u1-a.-_1 _ _                                                                        CONTROL 16C                CHEMISTRY      RAD. l'ROT.      W:CHANIC oPERATORS-                                                                              STAFF
                              .._.., ____ ... __
          -*--~--~-----*IANs.1911111.                  I t*J1t*rtll.....- ..                                                              TECHNICIANS        TECHNICIAN&    TECHNICIANS RO
__
__
I t*J1t*rtll.....-
          ............ _.._ *
.. a.-----... _ _,.._ ____ _ ............
* ii.ow.
_.._ ** ii.ow. s........  
                        ..
... 05191 .... * *.........  
s........ ...~
.............  
          ................ .... .... .....
,_.......  
_..._
.-.......** .,...,(19  
05191 . . . .* * . . . . . . . . .
......... . _.,._,,_,_.  
          ............. ,_....... . - ....... ** .,...,(19 ......... .
........ .._.,._, .... __ a ----...........  
_.,._,,_,_. ........ .._.,._, .... __ a
----. .... y ..... ,._ ......... . __ .. , ... .._.., ____ ... _., __ ................
                          ,...                                    _.,
_..._ .... ...,._ .... .....
          - - - - . . . . . . . . . . .- - - - . .... y . . . . . , . _ . . . . . . . . . .
* R-IM lor Ille F .. l'1ollc-Protr*m ........ .c.. ... ____
                                                  ...,._                                                                   EOUll'MfNT    lllrC I
'#.f!. . S "'* ftON REACTOR ENGINEER STAFF I SHIFT TECHNICAL ADVISORS SALEM GENERATING STATION
CHEMISTRY        RAO.l'ROT.
* CHIEF ENGINEER I STATION OPERATING ENGINEER t SENIOR SHIFT SRO SHIFT SUPERVISOR-SRO CONTROL oPERATORS-RO EOUll'MfNT OPERATOR I UTILITY OPERATORS I . I I I I 11 ft._,__ r I Ot:&deg;F S1rE. 1 , _____ , __ -* t------T --I I l I STATION PUUOHMANCE ENGINEER SENIOR :r ... c.  
ELECTRICIANS MACHINISTS STATION OPERATOR      ASSIST ANTI        ASSISTANT&        ASSISTANTS MECHANICS
..,._ .. c IUl'ERVISOR 16C TECHNICIANS lllrC ASSIST ANTI I I SENIOR SUPERVISOR
* R - I M lor Ille F .. l'1ollc- Protr*m
-QHiMlli'JA&#xa5; I CHEMISTRI' I CHEMISTRY TECHNICIAN&
          ........ .c.....                                                                                                       I                                1                              UTILITY MECHANICS
I CHEMISTRY ASSISTANT&
____ Sp11r1~1*s                                                                                                      UTILITY OPERATORS TECH. HEU'ER - NUCLEAR RAOl'ROT.
1 TECH. HEU'ER -NUCLEAR -I I I I I I -----RADIATION l'ROTECTION ENGINEER "--"'1>* IENIOR SUPERVISOR
HELl'ER
-ftAB. PROT. RAD. PROT. StJPt'* RAD. l'ROT. TECHNICIANS RAO.l'ROT.
                  .-"1~e,. o.~J
ASSISTANTS RAOl'ROT.
                    '#.f!. .S ftON  "'*                                                              FIGURE 6.2.2  FACILITY ORGANIZATION - SALEM GENERATING STATION
HELl'ER FIGURE 6.2.2 FACILITY ORGANIZATION
 
-SALEM GENERATING STATION I . MAINTENANCE EHGINEER SENIOR MAIN TE NANCE SUI'&#xa3; RVISOR MAINTENANCE SUPERVISOR BOILER REl'AIR W:CHANIC ELECTRICIANS MACHINISTS STATION MECHANICS UTILITY MECHANICS
  '
< . " .
ADMINISTRATIVE        CONTROLS
ADMIM TRAJOR OFFICE IUl'ERVISOR STAFF r-... -' ADMINISTRATIVE CONTROLS ' 6.3 FACILITY STAFF QUALIFICATIONS 6.3. 1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18. 1-1971 for comparable positions.
                            '
except for the Radiation Protection who shall meet or exceed tne qualifications of Regulatory Guide 1.8, September 1975. 6. 4 TRAINING r; fllcA rVJJC.T/oAJllL IC ( DE.P/llR.l1t1E.AJT
6.3    FACILITY STAFF QUALIFICATIONS 6.3. 1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18. 1-1971 for comparable positions. except for the Radiation Protection Enginee~ who shall meet or exceed tne qualifications of Regulatory Guide 1.8, September 1975.
'1 T TH&#xa3;. r-Ho11.t'ry 6.4. l A retraining and replacement training program for the facility staff shal 1 be coordinated by istant to Maftager and mafntained under the direction of the shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8. 1-1971 and Appendix 11 A 11 of 10 CFR Part 55. 6.5 REVIEW AND AUDIT 6.5. 1 STATION OPERATIONS REVIEW COMMITTEE (SORC) FUNCTION 6.5. 1. 1 The Station Operations Review Committee shall function to advise the Station Manager on all matters related to nuclear safety. COMPOSITION 6.5. 1.2 The Station Operations Review Committee shall be composed of the: Chairman:
: 6. 4  TRAINING                      r;    fllcA rVJJC.T/oAJllL l.'~1/&#xa3;.L h1II.A/~6e IC (
Vice Chairman:
                                            #c~l>) '1 T TH&#xa3;. r-Ho11.t'ry 6.4. l A retraining and replacement training program for the facility staff DE.P/llR.l1t1E.AJT shal 1 be coordinated by ~ss istant to Maftager and mafntained under the direction of the Training~~a~~~nd shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8. 1-1971 and Appendix 11 A11 of 10 CFR Part 55.
Member: -Membet: v.*.::..e..
6.5 REVIEW AND AUDIT 6.5. 1 STATION OPERATIONS REVIEW COMMITTEE (SORC)
C.J..a..;rPJAJ!):
FUNCTION 6.5. 1. 1 The Station Operations Review Committee shall function to advise the Station Manager on all matters related to nuclear safety.
Member: Member: Member: Member: Member: Member: :Memher:
COMPOSITION 6.5. 1.2 The Station Operations Review Committee shall be composed of the:
: ALTERNATES Chief Engineer Assistant to Manager Station Operating Engineer Station Performance Engineer Reactor Engineer Senior Senior Supervisor
Chairman:                                Chief Engineer Vice Chairman:                            Assistant to Manager Member:                                  Station Operating Engineer
-i&i"" Senior Supervisor
      -Membet: v.*.::..e.. C.J..a..;rPJAJ!):    Station Performance Engineer Member:                                  Reactor Engineer Member:                                  Senior Shlf~;:;visor Member:                                   Senior ~f              Supervisor - i&i""
-
Member:                                  Senior ~~e Supervisor - CAemi~try Member:                                  Radiation i>'ro1eciion Engineer Member:                                  Senior Maintenance ~upervisor
Radiation i>'ro1eciion Engineer Senior Maintenance Maintenance Engineer 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; *however, no more than two alternates shall participate as voting members in SORC activities at any one time. MEETING FREQUENCY 6.5. 1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
:Memher: V*ce.C~a.;r-,,.A-i :              Maintenance Engineer                                          I ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; *however, no more than two alternates shall participate as voting members in SORC activities at any one time.
SALEM -UNIT Z 6-6 AMENDMENT NO. I I ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
MEETING FREQUENCY 6.5. 1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
RESPONSIBI LIT! ES &#xa3;.5. 1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix 11 A 11 Technical Specifications.
SALEM - UNIT Z                                              6-6                      AMENDMENT NO.       I
* d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety. e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering tion and recommendations to prevent recurrence to the General Manager -Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue .. f. Review of events requiring 24 hour written notification to the Commission.
 
: g. Review of facility operations to detect potential nuclear safety hazards. h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board. i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board. SALEM -UNIT 2 6-7
ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
* ADMINISTRATIVE CONTROLS AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall: a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above. b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
RESPONSIBI LIT! ES
: c. Provide written notification within 24 hours to the General Manager-fl '1 Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such ments pursuant to 6. 1. 1 above. RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications.
&#xa3;.5. 1.6 The Station Operations Review Committee shall be responsible for:
Copies shall be provided to the General Manager-il;;1r*c Production and Chairman of the Nuclear Review Board. 6.5.2 NUCLEAR REVIEW BOARD (NRB) FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of: a. nuclear power _plant operations
: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety.
: b. Review of all proposed tests and experiments that affect nuclear safety.
: c. Review of all proposed changes to Appendix 11 A11 Technical Specifications.               *
: d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.
: e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence to the General Manager - ~ Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue..
: f. Review of events requiring 24 hour written notification to the Commission.
: g. Review of facility operations to detect potential nuclear safety hazards.
: h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board.
: i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.
: j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.
SALEM - UNIT 2                      6-7
 
ADMINISTRATIVE CONTROLS
* AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall:
: a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above.
: b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
: c. Provide written notification within 24 hours to the General Manager-
  .A/lie~~ fl  ' 1Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such disagree-ments pursuant to 6. 1. 1 above.
RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications. Copies shall be provided to the General Manager-il;;1r*c )JvelE.14~
Production and Chairman of the Nuclear Review Board.                               )
6.5.2    NUCLEAR REVIEW BOARD (NRB)
FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of:
: a. nuclear power _plant operations
: b. nuclear engineering
: b. nuclear engineering
: c. chemistry and radiochemistry
: c. chemistry and radiochemistry
: d. meta 11 urgy e. instrumentation and control f. radiological safety g. mechanical and electrical engineering
: d. meta 11 urgy
: h. quality assurance practices SALEM -UNIT 2. 6-8
: e. instrumentation and control
** ..
: f. radiological safety
* ADMINISTRATIVE CONTROLS COMPOSITION 6.5.2.2 The NRB Chairman:
: g. mechanical and electrical engineering
shall be composed of the: . * /1SS1Sl"1>.1I Vic.&#xa3; PR.e.S1D&#xa3;>Jr-Ftco1uc.r10A/
: h. quality assurance practices SALEM - UNIT 2.                       6-8
Vice Chairman:
 
H1111a9e1 fhi,L1 i& PPedw*ti'C>n Assistant to General Manager-Fuel Supply General Manager-Licensing and Environment Member: Member: Member: Member: Member: Member: Member: ALTERNATES Manager-Nuclear Ope rat ions S'v PPoR. r Qbtalit, Ass1.11 at'lee GEJ1&#xa3;ML  
**
-
  ..
r;:>A P-rajeet Mn11ege1 f:tgpe 8PeekG&#xa3;NEML 111llJl/AGU2. -fl}tJc.UAR.
ADMINISTRATIVE CONTROLS
Manager-Salem Generating Station Principal Engineer Manager-Hope Creek Generating Station 6.5.2.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NRB activities at any one time. CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB. MEETING FREQUENCY 6.5.2.5 The NRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.
* COMPOSITION 6.5.2.2 The NRB shall be composed of the:                     .
QUORUM 6.5.2.6 minimum quorum of NRB necessary for the performance of the NRB review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 NRB members including alternates.
                              * /1SS1Sl"1>.1I Vic.&#xa3; PR.e.S1D&#xa3;>Jr-Ftco1uc.r10A/                             l Chairman:             S@~e11l H1111a9e1 fhi,L1 i& PPedw*ti'C>n ~
No more than a minority of the quorum shall have line bility for operation of the facility.
Vice Chairman:        Assistant to General Manager-Fuel Supply Member:              General Manager-Licensing and Environment Member:               Manager-Nuclear Ope rat ions S'v PPoR. r Member:              Mana~e&#xa5;' Qbtalit, Ass1.11 at'lee GEJ1&#xa3;ML Ml9~A6m - Co~fbe.ATL r;:>A Member:              P-rajeet Mn11ege1 f:tgpe 8PeekG&#xa3;NEML 111llJl/AGU2. -fl}tJc.UAR. P~ouc:noN Member:              Manager-Salem Generating Station Member:              Principal Engineer Member:              Manager-Hope Creek Generating Station ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NRB activities at any one time.
REVIEW 6.5.2.7 The NRB shall review: a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB.
SALEM .;, UNIT 2 6-9 l I I ADMINISTRATIVE.CONTROLS
MEETING FREQUENCY 6.5.2.5 The NRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.
QUORUM 6.5.2.6 T~e minimum quorum of NRB necessary for the performance of the NRB review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 NRB members including alternates. No more than a minority of the quorum shall have line responsi-bility for operation of the facility.
REVIEW 6.5.2.7 The NRB shall review:
: a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
SALEM .;, UNIT 2                             6-9
 
ADMINISTRATIVE.CONTROLS
: g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
: g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
: h. The Facility Fire Protection Program and implementing procedures at least once per 24 months. i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm. j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months. AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8. RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below: a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting. b. Reports of reviews encompassed by Section above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review. c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit. 6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:
: h. The Facility Fire Protection Program and implementing procedures at least once per 24 months.
: a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9. b. Each REPORTABLE OCCURRENCE requiring 24 hour notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Production.
: i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
NVe.iEl4R., SALEM -UNIT 2 6-11
: j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months.
* L. ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated: a. The unit shall be placed in at least HOT STANDBY within one hour. b. The Safety Limit violation shall be reported to the Commission, the General Production and to the NRB within 24 hours. )J uc.LLAe. . c. A Safety Limit Violation Report shall be prepared.
AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.
The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.
RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below:
: d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. .
: a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting.
6.8 PROCEDURES 6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix 11 A 11 of Regulatory Guide 1.33, Revision 2, February 1978. b. Refueling operations.
: b. Reports of reviews encompassed by Section 6.5.2~7 above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review.
: c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit.
6.6   REPORTABLE OCCURRENCE ACTION 6.6. l   The following actions shall be taken for REPORTABLE OCCURRENCES:
: a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9.
: b. Each REPORTABLE OCCURRENCE requiring 24 hour notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Manager-~teet14c Production.
NVe.iEl4R.,
SALEM - UNIT 2                       6-11
 
L. ADMINISTRATIVE CONTROLS
* 6.7   SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated:
: a. The unit shall be placed in at least HOT STANDBY within one hour.
: b. The Safety Limit violation shall be reported to the Commission, the General Manager-iiheti:~c Production and to the NRB within 24 hours.
                                )Juc.LLAe.         .
: c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.
: d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation.          .      }IJuc.l..M~
6.8   PROCEDURES 6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below:
: a. The applicable procedures recommended in Appendix 11 A11 of Regulatory Guide 1.33, Revision 2, February 1978.
: b. Refueling operations.
: c. Surveillance and test activities of safety related equipment.
: c. Surveillance and test activities of safety related equipment.
: d. Security Plan implementation.
: d. Security Plan implementation.
: e. Emergency Plan implementation.
: e. Emergency Plan implementation.
: f. F_ire Protection Program implementation.
: f. F_ire Protection Program implementation.
6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures.  
6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures. *
*
* 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
* 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
: a. The intent of the original procedure is not altered. b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
: a. The intent of the original procedure is not altered.
SALEM -UNIT 2. 6-12}}
: b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.
SALEM - UNIT 2.                         6-12}}

Revision as of 14:57, 21 October 2019

Proposed Changes to Tech Specs,Section 6 Re Administrative Controls
ML18085A281
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/20/1980
From:
Public Service Enterprise Group
To:
Shared Package
ML18085A273 List:
References
NUDOCS 8011250698
Download: ML18085A281 (9)


Text

The following pages are proposed changes to the Unit 2 Technical Specifications:

1----

Scnlor Vice f'rnAident -

Dlel"9Y suwly ard Erqineerinq Gmeral Manaqer - General HaMqer -

Vice Presid!lit - Corporate Vice President- ro.aJuctioo IJ.oenai..ng !Ind ruel SUWlY C)illli ty Assunuce Envirament r--------

1 On-Site r--- 1-------' I Safety Reviev IL ______

Group **

_

General ~r "51'1aqer - Qi\ Manooer-a>

ruel suwty Servi .... Aaditl!I and Tralninq Asst. Vice Preeident -

Production

~. - Per9alnel Mfaira

  • ldninistratiml Training Manaqer Gereral K!riaqer - General~ -

Prob:t.im $1.sJDort !b:'lear Prcxluctioo

  • ft:fr. - M.icle&r ~-SalSTI (l11e1". support Gererat..irq Statim
    • I.hit 2 Aoqui1:"'11!1lt
  1. Dl.n!ct """""" !or,__ _....,..._.

rt.X"lenrf\Jel Jltrrq. rlamirq

~r.. Plant Fnu*. Health l'hy!llr.bt Cyr.le DYJr. ' Security Frqr. Fire Protection SUJvirt FIGURE 6.2-1 OFFSITE ORGANIZATION FOR FACILITY MANAGEMENT AND TECHNICAL SUPPORT


--- ---- --- - ------

l

  • .

<

I MANAGER-I SALEM I I .

' "

GENERATING I

.

I Ol'fo-4m I STATION

  • 11 ft._,__ r I .I

~ .. _.I

,_____ ,__

I Ot:°F S1rE. 1 I I -*

I I

ASSISTANT TO MANAGER CHIEF ENGINEER I t----- - - - - I -- - --

T I

MAINTENANCE EHGINEER I

I I

l STATION I I OFFICE~

DUALITY STATION STATION REACTOR RADIATION ASSURANCE

  • OPERATING PUUOHMANCE l'ROTECTION ADMIM

~1111muA - ...,If. ENGINEER ENGINEER t ENGINEER ENGINEER TRAJOR

    • w I I I SHIFT SENIOR SENIOR "--"'1>*

IENIOR ~OT.

SECURITY SAFETY TECHNICAL SENIOR SHIFT

r ... c. e>1~1~nty SENIOR SUl'E RVISOR su.£RV~

ADVISORS SUPERVISOR-SRO ..,._

SUl'ERVISOR- SUPERVISOR -

QHiMlli'JA¥ SUPERVISOR -

ftAB. PROT.

MAIN TE NANCE SUI'£ RVISOR I

SHIFT ..c MAINTENANCE OFFICE STAFF SUPERVISOR- SUPERVISOR IUl'ERVISOR IUl'ERVISOR CHEMISTRI' RAD. PROT.

SRO I SVP~ StJPt'*

SRO - lf.llllOR REACTOfl Of'ERATOR I

a.----- . . __,.._____ _

RO - REACTOR OPERATOR BOILER REl'AIR t 1..- ... i : . - 1 _ ..... 1u1-a.-_1 _ _ CONTROL 16C CHEMISTRY RAD. l'ROT. W:CHANIC oPERATORS- STAFF

.._.., ____ ... __

-*--~--~-----*IANs.1911111. I t*J1t*rtll.....- .. TECHNICIANS TECHNICIAN& TECHNICIANS RO

__

............ _.._ *

  • ii.ow.

..

s........ ...~

................ .... .... .....

_..._

05191 . . . .* * . . . . . . . . .

............. ,_....... . - ....... ** .,...,(19 ......... .

_.,._,,_,_. ........ .._.,._, .... __ a

,... _.,

- - - - . . . . . . . . . . .- - - - . .... y . . . . . , . _ . . . . . . . . . .

...,._ EOUll'MfNT lllrC I

CHEMISTRY RAO.l'ROT.

ELECTRICIANS MACHINISTS STATION OPERATOR ASSIST ANTI ASSISTANT& ASSISTANTS MECHANICS

  • R - I M lor Ille F .. l'1ollc- Protr*m

........ .c..... I 1 UTILITY MECHANICS

____ Sp11r1~1*s UTILITY OPERATORS TECH. HEU'ER - NUCLEAR RAOl'ROT.

HELl'ER

.-"1~e,. o.~J

'#.f!. .S ftON "'* FIGURE 6.2.2 FACILITY ORGANIZATION - SALEM GENERATING STATION

'

ADMINISTRATIVE CONTROLS

'

6.3 FACILITY STAFF QUALIFICATIONS 6.3. 1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18. 1-1971 for comparable positions. except for the Radiation Protection Enginee~ who shall meet or exceed tne qualifications of Regulatory Guide 1.8, September 1975.

6. 4 TRAINING r; fllcA rVJJC.T/oAJllL l.'~1/£.L h1II.A/~6e IC (
  1. c~l>) '1 T TH£. r-Ho11.t'ry 6.4. l A retraining and replacement training program for the facility staff DE.P/llR.l1t1E.AJT shal 1 be coordinated by ~ss istant to Maftager and mafntained under the direction of the Training~~a~~~nd shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI Nl8. 1-1971 and Appendix 11 A11 of 10 CFR Part 55.

6.5 REVIEW AND AUDIT 6.5. 1 STATION OPERATIONS REVIEW COMMITTEE (SORC)

FUNCTION 6.5. 1. 1 The Station Operations Review Committee shall function to advise the Station Manager on all matters related to nuclear safety.

COMPOSITION 6.5. 1.2 The Station Operations Review Committee shall be composed of the:

Chairman: Chief Engineer Vice Chairman: Assistant to Manager Member: Station Operating Engineer

-Membet: v.*.::..e.. C.J..a..;rPJAJ!): Station Performance Engineer Member: Reactor Engineer Member: Senior Shlf~;:;visor Member: Senior ~f Supervisor - i&i""

Member: Senior ~~e Supervisor - CAemi~try Member: Radiation i>'ro1eciion Engineer Member: Senior Maintenance ~upervisor

Memher: V*ce.C~a.;r-,,.A-i : Maintenance Engineer I ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; *however, no more than two alternates shall participate as voting members in SORC activities at any one time.

MEETING FREQUENCY 6.5. 1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.

SALEM - UNIT Z 6-6 AMENDMENT NO. I

ADMINISTRATIVE CONTROLS QUORUM 6."S. 1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBI LIT! ES

£.5. 1.6 The Station Operations Review Committee shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Station Manager to affect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix 11 A11 Technical Specifications. *
d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.
e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evalua-tion and recommendations to prevent recurrence to the General Manager - ~ Production and to the Chairman of the Nuclear Review Boa rd. NUcJ.uue..
f. Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
g. Review of facility operations to detect potential nuclear safety hazards.
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Nuclear Review Board.
i. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.
j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Nuclear Review Board.

SALEM - UNIT 2 6-7

ADMINISTRATIVE CONTROLS

  • AUTHORITY 6.5. 1.7 The Station Operations Review Committee shall:
a. Recommend to the Station Manager written approval or disapproval of items considered under 6.5. l.6(a) through (d) above.
b. Render determinations in writing with regard to whether or not each item considered under 6.5. 1.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the General Manager-

.A/lie~~ fl ' 1Ttc Production and the Nuclear Review Board of disagreement between the SORC and the Station Manager; however, the Station Manager shall have responsibility for resolution of such disagree-ments pursuant to 6. 1. 1 above.

RECORDS 6.5. 1.8 The Station Operations Review Committee shall maintain written minutes of each meeting that, at a minimum, documrnt the results of all SORC activities performed under the responsibility and authority provisions of these technical specifications. Copies shall be provided to the General Manager-il;;1r*c )JvelE.14~

Production and Chairman of the Nuclear Review Board. )

6.5.2 NUCLEAR REVIEW BOARD (NRB)

FUNCTION 6.5.2. l The Nuclear Review Board shall function to provide independent review and audit of designated activities in the areas of:

a. nuclear power _plant operations
b. nuclear engineering
c. chemistry and radiochemistry
d. meta 11 urgy
e. instrumentation and control
f. radiological safety
g. mechanical and electrical engineering
h. quality assurance practices SALEM - UNIT 2. 6-8

..

ADMINISTRATIVE CONTROLS

  • COMPOSITION 6.5.2.2 The NRB shall be composed of the: .
  • /1SS1Sl"1>.1I Vic.£ PR.e.S1D£>Jr-Ftco1uc.r10A/ l Chairman: S@~e11l H1111a9e1 fhi,L1 i& PPedw*ti'C>n ~

Vice Chairman: Assistant to General Manager-Fuel Supply Member: General Manager-Licensing and Environment Member: Manager-Nuclear Ope rat ions S'v PPoR. r Member: Mana~e¥' Qbtalit, Ass1.11 at'lee GEJ1£ML Ml9~A6m - Co~fbe.ATL r;:>A Member: P-rajeet Mn11ege1 f:tgpe 8PeekG£NEML 111llJl/AGU2. -fl}tJc.UAR. P~ouc:noN Member: Manager-Salem Generating Station Member: Principal Engineer Member: Manager-Hope Creek Generating Station ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the NRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NRB activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB.

MEETING FREQUENCY 6.5.2.5 The NRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.

QUORUM 6.5.2.6 T~e minimum quorum of NRB necessary for the performance of the NRB review and audit functions of these technical specifications shall consist of the Chairman or his designated alternate and at least 4 NRB members including alternates. No more than a minority of the quorum shall have line responsi-bility for operation of the facility.

REVIEW 6.5.2.7 The NRB shall review:

a. The safety evaluations for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of Section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

SALEM .;, UNIT 2 6-9

ADMINISTRATIVE.CONTROLS

g. Any other area of facility operation considered appropriate by the NRB or the Vice President-Production.
h. The Facility Fire Protection Program and implementing procedures at least once per 24 months.
i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
j. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outs.ide fire consultant at least once per 36 months.

AUTHORITY 6.5.2.9 The NRB shall report to and advise the Vice President-Production on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2. 10 Records of NRB activities shall be prepared, approved and distributed as indicated below:

a. Minutes of each NRB meeting shall be prepared, approved and forwarded to the Vice President-Production within 14 days following each meeting.
b. Reports of reviews encompassed by Section 6.5.2~7 above, shall be prepared, approved and forwarded to the Vice President-Production within 14 days following completion of the review.
c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Vice President-Production and to the management positions responsible for the areas audited within 30 days after completion of the audit.

6.6 REPORTABLE OCCURRENCE ACTION 6.6. l The following actions shall be taken for REPORTABLE OCCURRENCES:

a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9.
b. Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by* the SORC and submitted to the NRB and the General Manager-~teet14c Production.

NVe.iEl4R.,

SALEM - UNIT 2 6-11

L. ADMINISTRATIVE CONTROLS

  • 6.7 SAFETY LIMIT VIOLATION 6.7. l The following actions. shall be taken in the event a Safety Limit is vio*l ated:
a. The unit shall be placed in at least HOT STANDBY within one hour.
b. The Safety Limit violation shall be reported to the Commission, the General Manager-iiheti:~c Production and to the NRB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

)Juc.LLAe. .

c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the SORC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility*components, systems or structures, and (3) corrective action taken to prevent recurrence.
d. The Safety Limit Violation Report shall be submitted to the Commission, the NRB and the General Manager-Ele=tcic Production within 14 days of the violation. . }IJuc.l..M~

6.8 PROCEDURES 6.8. l Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix 11 A11 of Regulatory Guide 1.33, Revision 2, February 1978.
b. Refueling operations.
c. Surveillance and test activities of safety related equipment.
d. Security Plan implementation.
e. Emergency Plan implementation.
f. F_ire Protection Program implementation.

6.8.2 Each procedure and administrative policy of 6.8. l above, and changes thereto, shall be reviewed by the SORC and approved by the Station Manager prior to implementation and reviewed periodically as set forth in adminis-trative procedures. *

  • 6.8.3 Temporary changes to procedures of 6.8. 1 above may be made provided:
a. The intent of the original procedure is not altered.
b. The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected.

SALEM - UNIT 2. 6-12