{{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued) | {{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued) | ||
C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on | C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on *ignal. n . | ||
*ignal. n . | : 7. ...------------~ | ||
: 7. Verifying the dieael generator opera tea :for at leaat 24 houra*. During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator | Verifying the dieael generator opera tea :for at leaat 24 houra*. | ||
*hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency | During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency *hall be maintained at ~ 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat. | ||
*hall be maintained at 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat. 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw. 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override* | : 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw. | ||
the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power. e. At leaat once per 10 year* or attar any modificati.ona which could diesel generator interdependence by atarti.ng all di.***l generator* | : 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override* the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power. | ||
simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* | : e. At leaat once per 10 year* or attar any modificati.ona which could ~feet diesel generator interdependence by atarti.ng all di.***l generator* | ||
accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: Veri:fyinq th* di***l generator atarta and achiev.a 3910 volt* and > 58.8 Hz 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ '\ J o:f 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. | simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. | ||
: t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: | |||
: a. At l ... t once per 31 day* by: 1. Veri:fyi.nq th* level in each the above required :fuel atorage tank*. 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer | Veri:fyinq th* di***l generator atarta and achiev.a ~ 3910 volt* and | ||
:fuel :froa the :fuel atoraqe tank* to the day tank*. SALKM -UNIT 2 | > 58.8 Hz in~ 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ | ||
'j.::ttJSl:.(l\ | |||
the d.;i.eeal operate* for at leaat 24 hours*. During th* ti:st 2 hour* t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During-the | \ A J o:f ~ 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. | ||
*hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato: | ~ | ||
do not e.c.ed the tvo bou: ratinq of 2860 kv. 51. V*ri:tying that *i th th* diaael qezie::at:or in a teet aode (connected ta it* bus),* sillNiatad safety injection | 4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S: | ||
*iqnal override* | : a. At l . . . t once per 31 day* by: | ||
th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey with ottait. power. e. At l-*t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. 9enerator* | : 1. Veri:fyi.nq th* level in each o~ the above required :fuel atorage tank*. | ||
acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda. | : 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer :fuel :froa the :fuel atoraqe tank* to the day tank*. | ||
: f. At leaet once ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. . | SALKM - UNIT 2 3/4 8-5 Amendment No. 200 | ||
* El&'S'llRISAL PgWE! SYS'l'!iMS | ,/ 9907300106 990723 PDR ADOCK 05000272 p PDR | ||
----- | |||
* suiple of cb.enl fu*l :!rma each o:! the above requj.red | . il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS | ||
:!uel *toi:a9e i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 AS'l'M D!J7S-77 when for visco*ity, water and *ediment. | --:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus diff'e~tial and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a *~*tl" injection actuation signal.. | ||
4.8.1.1.4 R!p9rt1 -NOT USl:D | 7.***ver~:fyin9 the d.;i.eeal ~&tor operate* for at leaat 24 hours*. | ||
* Sur.r.illance te* ti.119 may be conductec:l iii | During th* ti:st 2 hour* o~ t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During- the :cmai.~9 22 hour* ot this te*t, th* di***l generator *hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at ~ 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi | ||
*i th th* manufacturer'* | : 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato: do not e.c.ed the tvo bou: ratinq of 2860 kv. | ||
;c-*commendatioftl | : 51. V*ri:tying that *i th th* diaael qezie::at:or opera~ in a teet aode (connected ta it* bus),* sillNiatad safety injection *iqnal override* th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby o~atiol'l and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey l~ with ottait. power. | ||
:eq&Z"ding-anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ... Atl). 0 Thie bmid is meant aa CJUidAnce to rautine o:! th* di**el g911erator aaziufac:turer'* | : e. At l - | ||
design ratinqa. Loma in uceas of thi* .band :!or apecj,aJ. | * t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator int.:d~ce by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. | ||
teetinq oz-moanta:y due to c:han11inljJ bu1 loada shall not invalidate th* t.st. | 9enerator* acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda. | ||
* A one-ti.me eate1Uion to thi* aurveillanc. | : f. At leaet once ~ ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: | ||
requirement is dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation* | Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in ~ 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ ~ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. | ||
to continue to th* thirteenth refu.liftlJ outaq* (1Jll13). | @tJ.S~il\ ~4 . a.1~l. 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t- *hall b9 demonstrated ODMllLI: | ||
'l'h* surveillomce i1 to be completed ae the app;c-opriate time during-th* 1R13 outage, prio;c-to the unit to )lode 4 upon outage complet.:i.on. | : a. At least once per 31 day* by: | ||
SALEM -UNI'!' 1 3/4 8-!a Aamidmen t No. 222 | : 1. Vuif'yinq the l.v.l in Neb o~ the above reqgired tuel *torage t.mka. | ||
: 2. Ve:ifyin11 that: bo~ :fu.l uan.f'e&- pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks. | |||
SALEM - UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222 | |||
* El&'S'llRISAL PgWE! SYS'l'!iMS b. | |||
----- | |||
At l***t onc:e pez- 92 daya by v*z-i~yin'iJ that | |||
* suiple of cb.enl fu*l | |||
:!rma each o:! the above requj.red :!uel *toi:a9e ~ i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 o~ AS'l'M D!J7S-77 when che~ed for visco*ity, water and *ediment. | |||
4.8.1.1.4 R!p9rt1 - NOT USl:D | |||
* Sur.r.illance te* ti.119 may be conductec:l iii acco~ee *i th th* | |||
manufacturer'* ;c-*commendatioftl :eq&Z"ding- anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ~r...Atl). | |||
0 Thie bmid is meant aa CJUidAnce to ~clwie rautine e~c** o:! th* | |||
di**el g911erator aaziufac:turer'* design ratinqa. Loma in uceas of thi* | |||
.band :!or apecj,aJ. teetinq oz- moanta:y v~ialion1 due to c:han11inljJ bu1 loada shall not invalidate th* t.st. | |||
* A one-ti.me eate1Uion to thi* aurveillanc. requirement is ~ant:ad dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation* to continue to th* | |||
thirteenth refu.liftlJ outaq* (1Jll13). 'l'h* surveillomce i1 to be completed ae the app;c-opriate time during- th* 1R13 outage, prio;c- to the unit retu~inq to )lode 4 upon outage complet.:i.on. | |||
SALEM - UNI'!' 1 3/4 8-!a Aamidmen t No. 222}} |
Revision as of 08:40, 21 October 2019
ML18107A460 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 07/23/1999 |
From: | TENNESSEE VALLEY AUTHORITY |
To: | |
Shared Package | |
ML18107A459 | List: |
References | |
NUDOCS 9907300106 | |
Download: ML18107A460 (3) | |
Text
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued)
C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on *ignal. n .
- 7. ...------------~
Verifying the dieael generator opera tea :for at leaat 24 houra*.
During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency *hall be maintained at ~ 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat.
- 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw.
- 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override* the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power.
- e. At leaat once per 10 year* or attar any modificati.ona which could ~feet diesel generator interdependence by atarti.ng all di.***l generator*
simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda.
- t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**:
Veri:fyinq th* di***l generator atarta and achiev.a ~ 3910 volt* and
> 58.8 Hz in~ 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@
'j.::ttJSl:.(l\
\ A J o:f ~ 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz.
~
4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S:
- a. At l . . . t once per 31 day* by:
- 1. Veri:fyi.nq th* level in each o~ the above required :fuel atorage tank*.
- 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer :fuel :froa the :fuel atoraqe tank* to the day tank*.
SALKM - UNIT 2 3/4 8-5 Amendment No. 200
,/ 9907300106 990723 PDR ADOCK 05000272 p PDR
. il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS
--:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus diff'e~tial and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a *~*tl" injection actuation signal..
7.***ver~:fyin9 the d.;i.eeal ~&tor operate* for at leaat 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*.
During th* ti:st 2 hour* o~ t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During- the :cmai.~9 22 hour* ot this te*t, th* di***l generator *hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at ~ 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi
- 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato: do not e.c.ed the tvo bou: ratinq of 2860 kv.
- 51. V*ri:tying that *i th th* diaael qezie::at:or opera~ in a teet aode (connected ta it* bus),* sillNiatad safety injection *iqnal override* th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby o~atiol'l and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey l~ with ottait. power.
- e. At l -
- t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator int.:d~ce by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel.
9enerator* acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda.
- f. At leaet once ~ ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**:
Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in ~ 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ ~ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz.
@tJ.S~il\ ~4 . a.1~l. 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t- *hall b9 demonstrated ODMllLI:
- a. At least once per 31 day* by:
- 1. Vuif'yinq the l.v.l in Neb o~ the above reqgired tuel *torage t.mka.
- 2. Ve:ifyin11 that: bo~ :fu.l uan.f'e&- pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks.
SALEM - UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222
- El&'S'llRISAL PgWE! SYS'l'!iMS b.
At l***t onc:e pez- 92 daya by v*z-i~yin'iJ that
- suiple of cb.enl fu*l
- !rma each o:! the above requj.red :!uel *toi:a9e ~ i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 o~ AS'l'M D!J7S-77 when che~ed for visco*ity, water and *ediment.
4.8.1.1.4 R!p9rt1 - NOT USl:D
- Sur.r.illance te* ti.119 may be conductec:l iii acco~ee *i th th*
manufacturer'* ;c-*commendatioftl :eq&Z"ding- anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ~r...Atl).
0 Thie bmid is meant aa CJUidAnce to ~clwie rautine e~c** o:! th*
di**el g911erator aaziufac:turer'* design ratinqa. Loma in uceas of thi*
.band :!or apecj,aJ. teetinq oz- moanta:y v~ialion1 due to c:han11inljJ bu1 loada shall not invalidate th* t.st.
- A one-ti.me eate1Uion to thi* aurveillanc. requirement is ~ant:ad dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation* to continue to th*
thirteenth refu.liftlJ outaq* (1Jll13). 'l'h* surveillomce i1 to be completed ae the app;c-opriate time during- th* 1R13 outage, prio;c- to the unit retu~inq to )lode 4 upon outage complet.:i.on.
SALEM - UNI'!' 1 3/4 8-!a Aamidmen t No. 222