IR 05000263/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Riemer K
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Company, Minnesota
| addressee affiliation = Northern States Power Company, Minnesota
| docket = 05000263
| docket = 05000263
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:September 14, 2017
-4352 September 14, 2017 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362
 
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT  
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT  
- NRC SECURITY BASELINE INSPECTION REPORT 0500026 3/201740 5
- NRC SECURITY BASELINE INSPECTION REPORT 0500026 3/201740 5


Line 27: Line 28:
. The NRC inspectors did not identify any finding or violation of more than minor significance.
. The NRC inspectors did not identify any finding or violation of more than minor significance.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR)
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR)
2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 1 0 CFR 2.390" Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security
-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security
-Related Information, please mark your entire response "Security
-Related Information
-Withhold from public disclosure under 1 0 CFR 2.390" Enclosure contains Sensitive Unclassified Non
-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Should you have any questions concerning this inspection, we will be please to discuss this with you.
Should you have any questions concerning this inspection, we will be please to discuss this with you.
Line 43: Line 38:
/RA/ Kenneth Riemer , Acting Chief Plant Support Branch Division of Reactor Safety
/RA/ Kenneth Riemer , Acting Chief Plant Support Branch Division of Reactor Safety


Docket No. 50
Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure:
-263 License No. DPR
-22 Nonpublic Enclosure:
Inspection Report 05000 26 3/201 7 40 5 cc w/o encl:
Inspection Report 05000 26 3/201 7 40 5 cc w/o encl:
Distribution via LISTSERV
Distribution via LISTSERV
}}
}}

Revision as of 04:35, 19 June 2019

NRC Security Baseline Inspection Report 05000263/2017405 (Cover Letter Only) (Mez)
ML17257A325
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/14/2017
From: Kenneth Riemer
Plant Support Branch II
To: Gardner P
Northern States Power Company, Minnesota
References
IR 2017405
Download: ML17257A325 (3)


Text

September 14, 2017

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT

- NRC SECURITY BASELINE INSPECTION REPORT 0500026 3/201740 5

Dear Mr. Gardner:

On August 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Monticello Nuclear Plant and the inspector s discussed the results of this inspection with Mr. Dieckmann and other members of your staff. The results of this inspection are documented in the enclosed report

. The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR)

2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 1 0 CFR 2.390" Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Should you have any questions concerning this inspection, we will be please to discuss this with you.

Should you have any questions concerning this inspection, we will be please to discuss this with you.

Sincerely,

/RA/ Kenneth Riemer , Acting Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure:

Inspection Report 05000 26 3/201 7 40 5 cc w/o encl:

Distribution via LISTSERV