ML17292A388: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/30/1996
| issue date = 07/30/1996
| title = Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996
| title = Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996
| author name = SWANK D A
| author name = Swank D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = CALLAN L J
| addressee name = Callan L
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000397
| docket = 05000397

Revision as of 22:09, 18 June 2019

Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996
ML17292A388
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/30/1996
From: Swank D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17292A389 List:
References
GO2-96-149, NUDOCS 9608060296
Download: ML17292A388 (3)


Text

REGULM INFORMATION DISTRZBUTIOZQYSTEM (RIDE)ACCESSION NBR:9608060296 DOC.DATE: 96/07/30 NOTARIZED:

NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 t AUTH.NAME AUTHOR AFFILIATION SWANK,D.A.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION CALLAN,L.J.

Region 4 (Post 820201)

SUBJECT:

Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Revision 3,June 1996.DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep T NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ILE CENTER~DRPM/PERB RGN4 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURNFT NRR/DISP/PIPB OE DIR NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 0 e Cl e~"

iiWASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968

~(509)372-5000 July 30, 1996 G02-96-149 Docket No.50-397 Mr.L.J.Callan Regional Administrator U.S.Nuclear Regulatory Commission Region IV 611 Ryan Plaza'Drive, Suite 400 Arlington, TX 7011-8064 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 WNP-2 TEN MILE EPZ EVACUATION TIME ESTIMATE STUDY REVISION 3, JUNE 1996 Enclosed are two copies of the WNP-2 Ten Mile EPZ Evacuation Time Estimate (ETE)Study, Revision 3, dated June 1996.Please call me or George Reed (509)377-8568 if you have any questions or require further information.

Respectfully, D.A.Swank Manager, Regulatory Affairs Mail Drop PE20 Enclosure CC: TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO (w/o)NS Reynolds-Winston&Strawn (w/o)DL Williams-BPA/399 (w/o)Document Control Desk NRC Resident Inspector-927N FEMA Region X-2 Copies t 9b080b029b 9b0730 PDR ADOCK 05000397 F PDR qr>/,