Line 1: Line 1:
{{Adams
{{Adams
| number = ML18351A428
| number = ML18197A371
| issue date = 12/17/2018
| issue date = 07/16/2018
| title = Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| title = NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| author name = Holman D
| author name = Groom J
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Powell G
| addressee name = Powell G
Line 12: Line 12:
| document report number = IR 2018403
| document report number = IR 2018403
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
| page count = 10
| page count = 7
}}
}}


Line 21: Line 21:


==SUBJECT:==
==SUBJECT:==
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018 40 3; 05000499/201 8 40 3
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403


==Dear Mr. Powell:==
==Dear Mr. Powell:==
On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.
On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility.


The NRC inspector did not identify any finding or violation of more than minor significance.
The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.


In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response "Security-Related Information  
The NRC inspectors did not identify any finding or violation of more than minor significance.
 
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS)
. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response "Security-Related Information  
- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,
Sincerely,
/RA/ David A. Holman
/RA/ Jeremy R. Groom, Chief Plant Support Branch 1 Division Reactor Safety Docket No s. 50-4 98 , 50-4 99 License No s. NPF-76 and NPF-80 Enclosures:
, Chief Plant Support Branch 1 Division Reactor Safety Docket No s.: 50-4 98 , 50-4 99 License No s.: NPF-76 and NPF-80 Enclosure: NRC Inspection Report 050004 98/201840 3 , 050004 99/201840 3 Enclosure U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket No s.: 050004 98, 050004 99 License No s.: NPF-76 , NPF-8 0 Report No s.: 05000445/201840 3; 05000446/201840 3 Enterprise Identifier:
Inspection Report 050004 98/201840 3 , 050004 99/201840 3 Enclosure U.S. NUCLEAR REGULATORY COMMISSION
I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas 77483 Dates: June 18, 2018 to J une 2 1 , 2018 Inspector:
 
==Inspection Report==
Docket Nos.:
050004 98, 050004 99 License No s.: NPF-76 , NPF-8 0 Report No.: 05000445/201840 5; 05000446/201840 5 Enterprise Identifier:
I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas Dates: June 18 to J une 2 1 , 2018 Inspector:
A. Meyen, Physical Security Inspector Approved By:
A. Meyen, Physical Security Inspector Approved By:
David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety 2
Jeremy R. Groom Chief, Plant Support Branch 1 Division of Reactor Safety


=SUMMARY=
2
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at


South Texas Project Electric Generating Station, Units 1 and 2
=EXECUTIVE SUMMARY=
, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2


List of Findings and Violations No Findings Additional Tracking Items No Additional Items
, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors.


3
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
 
List of Findings and Violations No Findings Additional Tracking Items No Additional Items 3 Report Details


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors."  The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors."  The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==SAFEGUARDS==
==SAFEGUARDS==
 
IP 71130.0 2 - Access Control (1 Sample)  The inspector evaluated the security program. The following elements were evaluated:
===71130.0 2 - Access Control (1 Sample)  The inspector evaluated the security program. The following elements were evaluated:
Tier I:  all 19 requirements Tier II:  all 7 requirements Tier III:  all 1 requirement
Tier I:  a ll 19 requirements Tier II:  all 7 requirements Tier III:  all 1 requirement 71151 - Performance Indicator Verification
===
{{IP sample|IP=IP 71130|count=1}}
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.
: (1) Protected Area Security Equipment Performance Index


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 64: Line 69:


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
On June 2 1, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report
The inspector verified no proprietary information was retained or documented in this report.
 
On June 2 1, 2018, the inspectors presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report. The inspector confirmed that proprietary information was controlled to protect from public disclosure
.
.
4  
4  
Line 70: Line 77:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71130.02 - Access Control
Procedure
Procedure Type Designation
Type             Designation               Description or Title                           Revision
Description or Title
71130.0 2 Procedure     Security Instructions
Revision 71130.02 Procedure OPGP03-ZS-0001 Vehicle, Material and Personnel 50  Access Control
Security Logs    Audit s OPGP03-ZS-0001 Vehicle, Material and Personnel Access Control
OPGP03-ZS-0005 Control of Keys, Locks, Cores, 22  Keycards and Passwords
OPGP03-ZS-0005 Control of Keys, Locks, Cores, Keycards and Passwords
OPGO-ZA-0001 Plant Access Authorization
OPGO-ZA-0001 Plant Access Authorization Program 34 1005 Security Incidents
Program Security 1005 Security Incidents
1006 Security Performance Indicator Calculation
Instructions
1006 Security Performance Indicator
Calculation
2101 Access Control
2101 Access Control
2402 Alarm Station Operator
2402 Alarm Station Operator
3701 Security Equipment Operability
3701 Security Equipment Operability Test 37 3702 Explosive Detector Operability Test 4 3001 Security Force Communications
Test   3702 Explosive Detector Operability
Test   3001 Security Force Communications
Misc. Designated Vehicle List 5
Misc. Designated Vehicle List 5
-30-18 N/A Security Logs SEL Security Event Logs Dates, 10-03-17 to 5-31-18 N/A Logs Security Daily Logs(CAS)
-30-18 N/A SEL Security Event Logs
N/A  Dates, 6/1/18  
Dates, 10-03-17 to 5-31-18 N/A Logs Security Daily Logs(CAS)
- 6/20/18   Self-Assessment
Dates, 6/1/18  
- 6/20/18 N/A Self-Assessment
Access Control Self
Access Control Self
-Assessment
-Assessment
N/A Audits  5-10-18   Audit 17-02 Physical Security Quality Audit
5-10-18 N/A Audit 17-02 Physical Security Quality Audit Report N/A Condition Reports
N/A   Report  Condition Reports
17-21674 17-21675 17-21680 17-21728 17-21742 17-21678 17-21714 17-21717 17-21720 17-21740 17-21741 17-15288 17-02145 17-17882 17-22663 17-21346 18-542 18-818 18-233 18-1620      
17-21674 17-21675 17-21680 17-21728 17-21742 17-21678 17-21714 17-21717 17-21720 17-21740 17-21741 17-15288 17-02145 17-17882 17-22663 17-21346 18-542 18-818 18-233 18-1620
: [[contact::G. Powell SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION]], UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
G.T. Powell
- DATED JULY 16, 2018
ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY
DISTRIBUTION
INSPECTION REPORT
: KKennedy, RA
05000498/2018
SMorris, DRA
3; 05000499/201
AVegel, DRP
40 3 DATED DECEMBER 17, 2018
MShaffer, DRS
Distribution w/enclosure
RLantz, DRP
: EWharton, NSIR
JClark, DRS
NSimonian, NSIR
DCylkowski, RC
DGarner, NSIR
NTaylor, DRP
DHuyck, NSIR
DProulx, DRP
DJohnson, NSIR RMcKinley, RI DRS
JMelfi, DRP
BDesai, RII DRS
ECombs, DRP
SOrth, RIII DRS
FSanchez, DRP
KKennedy, ORA
JChoate, DRP
SMorris, ORA
LReyna, DRP JBowen, RIV/OEDO
AVegel DRP
VDricks, ORA
MHay, DRP MShaffer, DRS
JWeil, OCA
RLantz, DRS
LRenger, NRR
DHolman, DRS
AMoreno, RIV/CAO
BTharakan, DRP  LReyna, DRP ASanchez, DRP NTaylor, DRP JChoate, DRP JMelfi, DRP ECombs, DRP Distribution w/o enclosure
BMaier, RSLO
: VDricks, ORA
GGeorge, IPAT
LRegner,NRR MHerrera, FRMB
EUribe, IPAT
DCylkowski , ORA GMiller, DRS
R4Enforcement
PJayroe, DRS
JWeil, RIV/OCA
AMoreno, RIV/OCA
CCook, RIV/OEDO
ACES  GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
NUMBER: ML18351A428
Cover Letter
ADAMS:  Non-Publicly Available
Non-Sensitive Keyword:  SUNSI Review By: ADM  Yes    No  Publicly Available
Sensitive
OFFICE PSI:PSB1 C:PSB1 C:RPB C:PSB1  NAME AMeyen DHolman NTaylor DHolman  SIGNATURE /RA/ /RA/ /RA/ /RA/  DATE 12/13/18 12/13/18 12/13/18 12/17/18  OFFICIAL RECORD COPY
 
G. T. Powell 3  SOUTH TEXAS PROJECT
ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
- DATED DECEMBER 17, 2018  Distribution w/enclosure
: EWharton, NSIR
NSimonian, NSIR
DGarner, NSIR
DHuyck, NSIR
DJohnson, NSIR RMcKinley, RI DRS
BDesai, RII DRS
SOrth, RIII DRS
KKennedy, ORA
SMorris, ORA
AVegel DRP
MHay, DRP MShaffer, DRS
RLantz, DRS
DHolman, DRS
BTharakan, DRP  LReyna, DRP ASanchez, DRP NTaylor, DRP JChoate, DRP JMelfi, DRP ECombs, DRP  Distribution w/o enclosure
: VDricks, ORA
LRegner,NRR MHerrera, FRMB
DCylkowski , ORA GMiller, DRS
PJayroe, DRS
JWeil, RIV/OCA
AMoreno, RIV/OCA
CCook, RIV/OEDO
ACES  GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
ADAMS ACCESSION
NUMBER: ML18351A428 Entire Report:
NUMBER:ML18197A371
Entire Report:
ADAMS:  Non-Publicly Available
ADAMS:  Non-Publicly Available
Non-Sensitive Keyword:  SUNSI Review By: ADM  Yes    No  Publicly Available
Non-Sensitive Keyword:  SUNSI Review
Sensitive NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBB C:PSB1 1 NAME AMeyen DHolman NTaylor DHolman  SIGNATURE /RA/ /RA/ /RA/ /RA/   DATE 12/12/18 12/14/18 12/15/18 12/17/18   OFFICIAL RECORD COPY
By: ADM  Yes    No  Publicly Available
Sensitive ______  OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:RPB C:PSB1  NAME AMeyen RLanfear JGroom NTaylor JGroom  SIGNATURE /RA/ /RA/ /RA/ /RA DProulx Acting For/
/RA/ DATE 6/26/18 6/26/18 7/05/18 07/16/18 07/16/18 OFFICIAL RECORD COPY
}}
}}

Revision as of 00:09, 17 June 2019

NRC Security Inspection Report 05000498/2018403; 05000499/2018403
ML18197A371
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/16/2018
From: Jeremy Groom
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2018403
Download: ML18197A371 (7)


Text

July 16, 2018

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

Dear Mr. Powell:

On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility.

The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS)

. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response "Security-Related Information

- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/ Jeremy R. Groom, Chief Plant Support Branch 1 Division Reactor Safety Docket No s. 50-4 98 , 50-4 99 License No s. NPF-76 and NPF-80 Enclosures:

Inspection Report 050004 98/201840 3 , 050004 99/201840 3 Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Nos.:

050004 98, 050004 99 License No s.: NPF-76 , NPF-8 0 Report No.: 05000445/201840 5; 05000446/201840 5 Enterprise Identifier:

I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas Dates: June 18 to J une 2 1 , 2018 Inspector:

A. Meyen, Physical Security Inspector Approved By:

Jeremy R. Groom Chief, Plant Support Branch 1 Division of Reactor Safety

2

EXECUTIVE SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2

, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations No Findings Additional Tracking Items No Additional Items 3 Report Details

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

IP 71130.0 2 - Access Control (1 Sample) The inspector evaluated the security program. The following elements were evaluated:

Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

On June 2 1, 2018, the inspectors presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report. The inspector confirmed that proprietary information was controlled to protect from public disclosure

.

4

DOCUMENTS REVIEWED

Procedure

Type Designation Description or Title Revision

71130.0 2 Procedure Security Instructions

Security Logs Audit s OPGP03-ZS-0001 Vehicle, Material and Personnel Access Control

OPGP03-ZS-0005 Control of Keys, Locks, Cores, Keycards and Passwords

OPGO-ZA-0001 Plant Access Authorization Program 34 1005 Security Incidents

1006 Security Performance Indicator Calculation

2101 Access Control

2402 Alarm Station Operator

3701 Security Equipment Operability Test 37 3702 Explosive Detector Operability Test 4 3001 Security Force Communications

Misc. Designated Vehicle List 5

-30-18 N/A SEL Security Event Logs

Dates, 10-03-17 to 5-31-18 N/A Logs Security Daily Logs(CAS)

Dates, 6/1/18

- 6/20/18 N/A Self-Assessment

Access Control Self

-Assessment

5-10-18 N/A Audit 17-02 Physical Security Quality Audit Report N/A Condition Reports

17-21674 17-21675 17-21680 17-21728 17-21742 17-21678 17-21714 17-21717 17-21720 17-21740 17-21741 17-15288 17-02145 17-17882 17-22663 17-21346 18-542 18-818 18-233 18-1620

G. Powell 3 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

- DATED JULY 16, 2018

DISTRIBUTION

KKennedy, RA

SMorris, DRA

AVegel, DRP

MShaffer, DRS

RLantz, DRP

JClark, DRS

DCylkowski, RC

NTaylor, DRP

DProulx, DRP

JMelfi, DRP

ECombs, DRP

FSanchez, DRP

JChoate, DRP

LReyna, DRP JBowen, RIV/OEDO

VDricks, ORA

JWeil, OCA

LRenger, NRR

AMoreno, RIV/CAO

BMaier, RSLO

GGeorge, IPAT

EUribe, IPAT

R4Enforcement

ADAMS ACCESSION

NUMBER:ML18197A371

Entire Report:

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: SUNSI Review

By: ADM Yes No Publicly Available

Sensitive ______ OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:RPB C:PSB1 NAME AMeyen RLanfear JGroom NTaylor JGroom SIGNATURE /RA/ /RA/ /RA/ /RA DProulx Acting For/

/RA/ DATE 6/26/18 6/26/18 7/05/18 07/16/18 07/16/18 OFFICIAL RECORD COPY