ML17284A795: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17284A795
| number = ML17284A795
| issue date = 10/23/1998
| issue date = 10/23/1998
| title = Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & Iii
| title = Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & III
| author name = COLEMAN D W
| author name = COLEMAN D W
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM

Revision as of 01:16, 20 April 2019

Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & III
ML17284A795
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/23/1998
From: COLEMAN D W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17284A796 List:
References
GO2-98-181, NUDOCS 9811040075
Download: ML17284A795 (5)


Text

CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)A CCESSION NBR:9811040075 DOC.DATE: 98/10/23 NOTARIZED:

NO DOCKET~~~FACIE:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION OLEMAN,D.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 28 E proposed rev 29 to"Operational QA Program Description," WPPSS-QA-004.Rev 28 has minor change to C Section 1.3.3.1.1 to restructure quality svcs group.Proposed rev 29 modifies Sections 1, 2, 4, 6, 12, 15, 18 E App I, II 6 III.j DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL SIZE: TITLE: QA Topical Report, Change, Amendment, or Correspondence (Docket/Utile NOTES: RECIPIENT ID CODE/NAME POSLUSNY,C INTERNAL: AC IL R DRCH/HQMB OC/LFDCB F TERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1'1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME DRS/RGN.~NRR/DXSP/PIMB NUDOCS-ABSTRACT RGN4 FILE IHS COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D C NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP'US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12 1

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 October 23, 1998 G02-98-181 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPI<'-21 REVISION 28 AND PROPOSED REVISION 29 TO THE OPERATIONAL QUALIIY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

In accordance with-10 CFR 50.54(a)(3), the Supply System is revising the U.S.Nuclear Regulatory Commission (NRC)approved topical report,"Operational Quality Assurance Program Description (OQAPD)(WPPSS-QA-004)." This submittal contains two changes;Revision 28 which does not contain any reduction of commitments, and proposed Revision 29 which contains changes which reduce commitments and requires NRC approval prior to implementation.

Revision 28 consisted of a minor change to Section 1.3.3.1.1 to restructure the Quality Services group into functional areas and added a second supervisor.

Appendix I, Qualification Requirements was changed to show two Quality Services Supervisors.

The proposed Revision 29 modifies Sections 1, 2, 4, 6, 12, 15, and 18, Appendix I, Appendix II, and Appendix III.A description and justification for the Revision 29 changes to the OQAPD is provided in Attachment 1.Vertical lines have been placed in the right-hand margin of Attachment 2 to identify text changes, additions, and deletions.

Attachment 3 is Revision 28 of the OQAPD which has been implemented.

Changes to text are identified by vertical lines.incorporation of ths r The proposed Revision 29 has been evaluated in accordance with 10 CFR 50.59.The Supply System has concluded that the proposed changes to the OQAPD do not create any unreviewed safety questions.

This proposed revision has been reviewed and approved by the WNP-2 Plant Operations Committee.

The provisions of 10 CFR 50, Appendix B will continue to be met by evision.~ppt~Q 9'Bi i040075 9'Bi023 PDR ADOCK 050003'P7 l PDR QP 0

I~~t t RkVISION 28 AND PROPOSED REVISION 29 TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

Page 2 Pursuant to the requirements of 10 CFR 50.54(a)(3)(iv), should no comments be received from the NRC within sixty days after submittal of this proposed change, the Supply System will consider the revision accepted by the NRC and it will be implemented accordingly.

Should you have any questions or desire additional information regarding this matter, please call me or DK Atkinson at (509)377-4302.Respectfully, DW Coleman Manager, Regulatory Affairs Mail Drop PE20 Attachments cc: EW Merschoff-NRC-RIV GA Pick-NRC-RIV C Poslusny, Jr.,-NRC-NRR NRC Sr.Resident Inspector-927N DL Williams-BPA/1399 PD Robinson-Winston 8c Strawn