ML17355A223: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CATEGORY j.REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION~NBR:9902180283 DOC.DATE: 99/02/08 NOTARIZED:
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-;251 Turkey, Point'.Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION COLLINS,S.J.
 
==SUBJECT:==
Informs that in response to JA Zwolinskis ltr dtd 990129, FPL will comply with listed commitment with respect to Turkey Point Units 3&4.DISTRIBUTION CODE: A029D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier NOTES: RECIPIENT ID CODE/NAME PD2-3 LA JAB B~O INTERNAL: ER 01 NRR/DRPW/PD3-NRR/KUGLER,A EXTERNAL: NOAC COPIES LTTR ENCL 1 0 1 1 1.1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD NRR/DE/EELB NRR/DSSA/SPLB" RGN2 FILE NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1, 1 1 1 NOTE TO ALL"RIDS'!RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10 P.O.Box 14000, Juno Beach, FL 33408-0420 FEB-8>F99 L-99-031 Mr.Samuel J.Collins, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 33408-0420
 
==Subject:==
Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Consent to Confirmatory Order Modif in License.on Thermo-La Commitments In response to J.A.Zwolinski's letter dated January 29, 1999, Florida Power and Light Company (FPL)will comply with the following commitment with respect to Turkey Point Units 3 and 4 (reproduced in the attachment):
Florida Power and Light Company (FPL)shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Plant, Units 3 and 4, described in the FPL submittal to the U.S.Nuclear Regulatory Commission (NRC)dated December 9, 1998, by December 31, 2001.As discussed in FPL letter L-99-031, the following are issues pending resolution:
1.Thermo-Lag ampacity derating methodology issues are still under NRC review.2.The use of Safety Injection pumps as alternative shutdown equipment in lieu of the charging pumps is still under NRC review.', FPL review of the NRC Safety Evaluation issued in support of the December 22, 1998,"Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, for Turkey Point Units 3 and 4, Regarding Fire Barriers in the Turbine Building (TAC NOS.M99324 and M99325)," has not be completed.
4.FPL's request for exemption from certain technical requirements of 10 CFR 50, Appendix R, for the Control Building Roof, submitted by FPL letter L-98-259, dated November 2, 1998, is still under NRC review.Any further issues identified as a result of these pending NRC and FPL reviews and the schedules for implementation of any related corrective actions will be determined separately and are therefore not part of this order.Further, the resolution of any new Thermo-Lag corrective actions resulting from a potential Fire Protection Functional Inspection or the on-going Fire Protection Functional Inspection Self-Assessment at Turkey Point Units 3 and 4, are not considered part of this confirmatory order.'7902180223 990208 PDRi'tpDQCK 05000250 p,<,J PDR 6+l an FPL Group company J I" ri.i f$'y"y)'~III L-99-031 Page 2 The above properly reflects FPL's commitments to implement Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Units 3 and 4.The exceptions to the commitment proposed in Mr.Zwolinski's January 29, 1999 letter reflect issues which are pending resolution and therefore, are not part of this order.FPL agrees to the incorporation of the above commitment in a confirmatory order modifying the Turkey Point Unit 3 license (DPR-31)and the Turkey Point Unit 4 license (DPR-41)that will be effective immediately upon issuance.FPL also recognizes that by signing below, FPL consents to the issuance of an immediately effective confirmatory order for Turkey Point Units 3 and 4 and, by doing so, pursuant to 10 CFR 2.202(a)(3), FPL will not have a right to request a hearing on all or any part of the Turkey Point Units 3 and 4 Confirmatory Order.However, it is FPL',s position that this waiver of a right to a hearing is limited to the issuance of the specific Turkey Point Units 3 and 4 Order'nd does not extend to any future right to a hearing or to any other legal process that FPL might have concerning any other order, issuance or determination by the NRC, including, for example, any NRC determination that good cause has not been shown for the relaxation or rescission of the Turkey Point Units 3 and 4 Order.Moreover, it is FPL's position that, in the event FPL requests a hearing on the NRC's denial of a showing of good cause, the effectiveness of the above commitment will be suspended until the completion of the hearing.Additionally, consistent with the confirmatory order issued to Washington Public Power Supply System concerning Nuclear Project No.2 dated March 25, 1998, as well as confirmatory orders issued to other licensees, FPL's acceptance is based on the premise that the Confirmatory Order for Turkey Point Units 3 and 4 will expressly provide that"The Director, Office of Nuclear Reactor Regulation, may relax or rescind, in writing, any provisions of this Confirmatory Order upon a showing by the Licensee of good cause." By way of example, and not by way of limitation, FPL considers a showing of good cause to include delays or disruptions which directly affect FPL's ability to satisfy the Turkey Point Units 3 and 4 Order and which result from unforeseeable conditions beyond the control of FPL, including, but not limited to, acts of God, labor difficulty, unavailability of materials, embargoes, or acts of governmental authorities, including changes in laws, regulations, licenses, or orders.Further, FPL believes that a showing of good cause would include such matters as the need to revise the completion date of the above commitment in order to perform other work because FPL determines that the safety significance of such work takes precedence over the above-described Thermo-Lag 330-1 modifications due to budget, resource, or space constraints.
Should there be any questions about this consent letter, please contact us.Very truly yours, T.F.Plunkett President Nuclear Division OXH Attachment cc: Document Control Desk, Washington, D.C.Regional Administrator, Region II, USNRC Senior Resident Xnspector, USNRC, Turkey Point (4 Attachment to L-99-031 I, Thomas F.Plunkett, President, Nuclear Division, Florida Power and Light Company, hereby agree on behalf of Florida Power and Light Company that Florida Power and Light Company will comply with, the following commitment:
Florida Power and Light Company (FPL)shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Plant, Units 3 and 4, described in the FPL submittal to the U.S.Nuclear Regulatory Commission (NRC)dated December 9, 1998, by December 31, 2001.As discussed in FPL letter L-99-031, the following are issues pending resolution:
1.Thermo-Lag ampacity derating methodology issues are still under NRC review.1 2.The use of Safety Injection pumps as alternative shutdown equipment in lieu of the charging pumps is still under NRC review.FPL review of the NRC Safety Evaluation issued in support of the December 22, 1998,"Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, for Turkey Point Units 3 and 4, Regarding Fire Barriers in the Turbine Building (TAC NOS.M99324 and M99325)," has not be completed.
4.FPL's request for exemption from certain technical requirements of 10 CFR 50, Appendix R, for the Control Building Roof, submitted by FPL letter L-98-259, dated November 2, 1998, is still under NRC review.Any further issues identified as a result of these pending NRC and FPL reviews and the schedules for implementation of any related corrective actions will be determined separately and are therefore not part of this order.Further, the resolution of any new Thermo-Lag corrective actions resulting from a potential Fire Protection Functional Inspection or the on-going Fire Protection Functional Inspection Self-Assessment at Turkey Point Units 3 and 4, are not considered part of this confirmatory order.FPL also agrees to incorporate this commitment into a Confirmatory Order Modifying License (Order)that will be effective immediately upon issuance.I recognize that by signing below, FPL consents to the issuance of an immediately effective Order incorporating the above commitment and, by doing so, pursuant to 10 CFR 2.202(a)(3), FPL will not have the right to request a hearing on all or any part of this Order.homas F.Plunkett, President Nuclear Division Florida Power and Light Company Dat
~~~E~//}}

Revision as of 05:56, 11 September 2018

Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance
ML17355A223
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/08/1999
From: PLUNKETT T F
FLORIDA POWER & LIGHT CO.
To: COLLINS S J
NRC (Affiliation Not Assigned)
References
L-99-031, L-99-31, TAC-M99324, NUDOCS 9902180223
Download: ML17355A223 (6)


Text

CATEGORY j.REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION~NBR:9902180283 DOC.DATE: 99/02/08 NOTARIZED:

NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-;251 Turkey, Point'.Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION COLLINS,S.J.

SUBJECT:

Informs that in response to JA Zwolinskis ltr dtd 990129, FPL will comply with listed commitment with respect to Turkey Point Units 3&4.DISTRIBUTION CODE: A029D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Generic Letter 92-008 Thermo-Lag 330 Fire Barrier NOTES: RECIPIENT ID CODE/NAME PD2-3 LA JAB B~O INTERNAL: ER 01 NRR/DRPW/PD3-NRR/KUGLER,A EXTERNAL: NOAC COPIES LTTR ENCL 1 0 1 1 1.1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD NRR/DE/EELB NRR/DSSA/SPLB" RGN2 FILE NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1, 1 1 1 NOTE TO ALL"RIDS'!RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10 P.O.Box 14000, Juno Beach, FL 33408-0420 FEB-8>F99 L-99-031 Mr.Samuel J.Collins, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 33408-0420

Subject:

Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Consent to Confirmatory Order Modif in License.on Thermo-La Commitments In response to J.A.Zwolinski's letter dated January 29, 1999, Florida Power and Light Company (FPL)will comply with the following commitment with respect to Turkey Point Units 3 and 4 (reproduced in the attachment):

Florida Power and Light Company (FPL)shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Plant, Units 3 and 4, described in the FPL submittal to the U.S.Nuclear Regulatory Commission (NRC)dated December 9, 1998, by December 31, 2001.As discussed in FPL letter L-99-031, the following are issues pending resolution:

1.Thermo-Lag ampacity derating methodology issues are still under NRC review.2.The use of Safety Injection pumps as alternative shutdown equipment in lieu of the charging pumps is still under NRC review.', FPL review of the NRC Safety Evaluation issued in support of the December 22, 1998,"Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, for Turkey Point Units 3 and 4, Regarding Fire Barriers in the Turbine Building (TAC NOS.M99324 and M99325)," has not be completed.

4.FPL's request for exemption from certain technical requirements of 10 CFR 50, Appendix R, for the Control Building Roof, submitted by FPL letter L-98-259, dated November 2, 1998, is still under NRC review.Any further issues identified as a result of these pending NRC and FPL reviews and the schedules for implementation of any related corrective actions will be determined separately and are therefore not part of this order.Further, the resolution of any new Thermo-Lag corrective actions resulting from a potential Fire Protection Functional Inspection or the on-going Fire Protection Functional Inspection Self-Assessment at Turkey Point Units 3 and 4, are not considered part of this confirmatory order.'7902180223 990208 PDRi'tpDQCK 05000250 p,<,J PDR 6+l an FPL Group company J I" ri.i f$'y"y)'~III L-99-031 Page 2 The above properly reflects FPL's commitments to implement Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Units 3 and 4.The exceptions to the commitment proposed in Mr.Zwolinski's January 29, 1999 letter reflect issues which are pending resolution and therefore, are not part of this order.FPL agrees to the incorporation of the above commitment in a confirmatory order modifying the Turkey Point Unit 3 license (DPR-31)and the Turkey Point Unit 4 license (DPR-41)that will be effective immediately upon issuance.FPL also recognizes that by signing below, FPL consents to the issuance of an immediately effective confirmatory order for Turkey Point Units 3 and 4 and, by doing so, pursuant to 10 CFR 2.202(a)(3), FPL will not have a right to request a hearing on all or any part of the Turkey Point Units 3 and 4 Confirmatory Order.However, it is FPL',s position that this waiver of a right to a hearing is limited to the issuance of the specific Turkey Point Units 3 and 4 Order'nd does not extend to any future right to a hearing or to any other legal process that FPL might have concerning any other order, issuance or determination by the NRC, including, for example, any NRC determination that good cause has not been shown for the relaxation or rescission of the Turkey Point Units 3 and 4 Order.Moreover, it is FPL's position that, in the event FPL requests a hearing on the NRC's denial of a showing of good cause, the effectiveness of the above commitment will be suspended until the completion of the hearing.Additionally, consistent with the confirmatory order issued to Washington Public Power Supply System concerning Nuclear Project No.2 dated March 25, 1998, as well as confirmatory orders issued to other licensees, FPL's acceptance is based on the premise that the Confirmatory Order for Turkey Point Units 3 and 4 will expressly provide that"The Director, Office of Nuclear Reactor Regulation, may relax or rescind, in writing, any provisions of this Confirmatory Order upon a showing by the Licensee of good cause." By way of example, and not by way of limitation, FPL considers a showing of good cause to include delays or disruptions which directly affect FPL's ability to satisfy the Turkey Point Units 3 and 4 Order and which result from unforeseeable conditions beyond the control of FPL, including, but not limited to, acts of God, labor difficulty, unavailability of materials, embargoes, or acts of governmental authorities, including changes in laws, regulations, licenses, or orders.Further, FPL believes that a showing of good cause would include such matters as the need to revise the completion date of the above commitment in order to perform other work because FPL determines that the safety significance of such work takes precedence over the above-described Thermo-Lag 330-1 modifications due to budget, resource, or space constraints.

Should there be any questions about this consent letter, please contact us.Very truly yours, T.F.Plunkett President Nuclear Division OXH Attachment cc: Document Control Desk, Washington, D.C.Regional Administrator, Region II, USNRC Senior Resident Xnspector, USNRC, Turkey Point (4 Attachment to L-99-031 I, Thomas F.Plunkett, President, Nuclear Division, Florida Power and Light Company, hereby agree on behalf of Florida Power and Light Company that Florida Power and Light Company will comply with, the following commitment:

Florida Power and Light Company (FPL)shall complete final implementation of Thermo-Lag 330-1 fire barrier corrective actions at Turkey Point Plant, Units 3 and 4, described in the FPL submittal to the U.S.Nuclear Regulatory Commission (NRC)dated December 9, 1998, by December 31, 2001.As discussed in FPL letter L-99-031, the following are issues pending resolution:

1.Thermo-Lag ampacity derating methodology issues are still under NRC review.1 2.The use of Safety Injection pumps as alternative shutdown equipment in lieu of the charging pumps is still under NRC review.FPL review of the NRC Safety Evaluation issued in support of the December 22, 1998,"Exemption from Certain Requirements of 10 CFR Part 50, Appendix R, for Turkey Point Units 3 and 4, Regarding Fire Barriers in the Turbine Building (TAC NOS.M99324 and M99325)," has not be completed.

4.FPL's request for exemption from certain technical requirements of 10 CFR 50, Appendix R, for the Control Building Roof, submitted by FPL letter L-98-259, dated November 2, 1998, is still under NRC review.Any further issues identified as a result of these pending NRC and FPL reviews and the schedules for implementation of any related corrective actions will be determined separately and are therefore not part of this order.Further, the resolution of any new Thermo-Lag corrective actions resulting from a potential Fire Protection Functional Inspection or the on-going Fire Protection Functional Inspection Self-Assessment at Turkey Point Units 3 and 4, are not considered part of this confirmatory order.FPL also agrees to incorporate this commitment into a Confirmatory Order Modifying License (Order)that will be effective immediately upon issuance.I recognize that by signing below, FPL consents to the issuance of an immediately effective Order incorporating the above commitment and, by doing so, pursuant to 10 CFR 2.202(a)(3), FPL will not have the right to request a hearing on all or any part of this Order.homas F.Plunkett, President Nuclear Division Florida Power and Light Company Dat

~~~E~//