ML062430390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Harris Inspection / Activity Plan 08/01/2006
{{#Wiki_filter:Page 1 of 1                                                                                      Harris 08/30/2006    14:24:48                                                                Inspection / Activity Plan Report 22 08/01/2006 - 07/31/2007 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                           2 1              IP 2515/169              Mitigating Systems Performance Index Verification                                                    08/01/2006 12/31/2006 Safety Issues EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                         6 1              IP 7111121              Component Design Bases Inspection                                                                    09/18/2006 09/22/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/02/2006 10/06/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/16/2006 10/20/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                                   10/30/2006 11/03/2006 Baseline Inspections PSB1-RP       - RP PUBLIC PRE - INSP VISIT                                                                               1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                  12/18/2006 12/20/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                         3 1              IP 7111111B              Licensed Operator Requalification Program                                                            03/19/2007 03/23/2007 Baseline Inspections PS2-EP         - EP EXERCISE                                                                                               3 1             IP 7111401               Exercise Evaluation                                                                                 04/09/2007 04/13/2007 Baseline Inspections 1             IP 7111404               Emergency Action Level and Emergency Plan Changes                                                   04/09/2007 04/13/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                   04/09/2007 04/13/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                                 3 1              IP 7111107B              Heat Sink Performance                                                                                06/04/2007 06/08/2007 Baseline Inspections PSB1-RP       - RP PUBLIC PRE-INSP. VISIT                                                                                 1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                  06/11/2007 06/13/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         4 1                 V23259               HARRIS/JULY 2007 EXAM AT POWER FACILIITES                                                           07/09/2007 07/13/2007 Not Applicable PSB1-RP        - RP PUBLIC BASELINE INSP                                                                                  4 1             IP 7112101               Access Control to Radiologically Significant Areas                                                   07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                       07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             07/09/2007 07/13/2007 Baseline Inspections 1             IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             07/09/2007 07/13/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                                   07/09/2007 07/13/2007 Baseline Inspections LIC RENE       - LICENSE RENEWAL INSPECTION                                                                               5 1              IP 71002                License Renewal Inspection                                                                          07/16/2007 07/27/2007 License Renewal Insp OL EXAM       - INITIAL EXAM                                                                                             4 1                V23259                HARRIS/JULY 2007 EXAM AT POWER FACILIITES                                                            07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities.                                                                                                 Enclosure This report shows only on-site and announced inspection procedures.}}
-07/31/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 1 08/30/2006 14:24:48 Report 22 2 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1    2515/169 IP Mitigating Systems Performance Index Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/18/2006 09/22/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/02/2006 10/06/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/16/2006 10/20/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 10/30/2006 11/03/2006 1    7111121 IP Component Design Bases Inspection 1 PSB1-RP-RP PUBLIC PRE - INSP VISIT Baseline Inspections 12/18/2006 12/20/2006 1    7112101 IP A ccess Control to Radiologically Significant Areas 3 OL RQ-REQUAL INSPECTION Baseline Inspections 03/19/2007 03/23/2007 1    7111111B IP Licensed Operator Requalification Program 3 PS2-EP-EP EXERCISE Baseline Inspections 04/09/2007 04/13/2007 1     7111401 IP Exercise Evaluation Baseline Inspections 04/09/2007 04/13/2007 1     7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/09/2007 04/13/2007 1     71151 IP Performance Indicator Verification 3 EB3-HS-HEAT SINK Baseline Inspections 06/04/2007 06/08/2007 1    7111107B IP Heat Sink Performance 1 PSB1-RP-RP PUBLIC PRE-INSP. VISIT Baseline Inspections 06/11/2007 06/13/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas 4 OL PREP-INITIAL EXAM PREP Not Applicable 07/09/2007 07/13/2007 1     V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 4 PSB1-RP-RP PUBLIC BASELINE INSP Baseline Inspections 07/09/2007 07/13/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/09/2007 07/13/2007 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/09/2007 07/13/2007 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/09/2007 07/13/2007 1     71151 IP Performance Indicator Verification 5 LIC RENE-LICENSE RENEWAL INSPECTION License Renewal Ins p 07/16/2007 07/27/2007 1    71002 IP License Renewal Inspection 4 OL EXAM-INITIAL EXAM Not Applicable 07/30/2007 08/10/2007 1    V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:33, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07
ML062430390
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Gannon C
Carolina Power & Light Co
Shared Package
ML062430386 List:
References
Download: ML062430390 (1)


Text

Page 1 of 1 Harris 08/30/2006 14:24:48 Inspection / Activity Plan Report 22 08/01/2006 - 07/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 2 1 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1 IP 7111121 Component Design Bases Inspection 09/18/2006 09/22/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/02/2006 10/06/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 10/30/2006 11/03/2006 Baseline Inspections PSB1-RP - RP PUBLIC PRE - INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/18/2006 12/20/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 3 1 IP 7111111B Licensed Operator Requalification Program 03/19/2007 03/23/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 1 IP 7111401 Exercise Evaluation 04/09/2007 04/13/2007 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/09/2007 04/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/09/2007 04/13/2007 Baseline Inspections EB3-HS - HEAT SINK 3 1 IP 7111107B Heat Sink Performance 06/04/2007 06/08/2007 Baseline Inspections PSB1-RP - RP PUBLIC PRE-INSP. VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/11/2007 06/13/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 4 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/09/2007 07/13/2007 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1 IP 7112101 Access Control to Radiologically Significant Areas 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/09/2007 07/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections LIC RENE - LICENSE RENEWAL INSPECTION 5 1 IP 71002 License Renewal Inspection 07/16/2007 07/27/2007 License Renewal Insp OL EXAM - INITIAL EXAM 4 1 V23259 HARRIS/JULY 2007 EXAM AT POWER FACILIITES 07/30/2007 08/10/2007 Not Applicable This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.