{{#Wiki_filter:WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION  
{{#Wiki_filter:~~
-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
WAmeren                                                                                       Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)
10 CFR 50. 54(f) DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50. 54(hb)(2).
Ladies and Gentlemen:
Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011. The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).
FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section
: 50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).
In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.
The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).
The Enclosure to this letter contains sensitive information.
The Enclosure to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390. Upon removal of the Enclosure, this letter is uncontrolled.
Withhold from public disclosure under 10 CFR 2.390.
SECURITY-RELATED INFORMATION  
Upon removal of the Enclosure, this letter is uncontrolled.
-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620     Fulton, MO 65251 AmerenMissouri.com
I declare under penalty of perjury that the foregoing and attached are true and correct. Executed on: JuJ j I \ ) AD II KRNnls  
 
ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.
I declare under penalty of perjury that the foregoing and attached are true and correct.
Sincerely, Executed on:   JuJ j I \ ) AD II                           ~t?
Cleveland o. Reasoner III Vice President Engineering KRNnls


==Enclosure:==
==Enclosure:==
60-Day Response to Bulletin 2011-01


60-Day Response to Bulletin 2011-01 Sincerely, Cleveland
ULNRC-05807 July 11, 2011 Page 3 cc:
: o. Reasoner III Vice President Engineering ULNRC-05807 July 11, 2011 Page 3 cc: (copy w/out Enclosure except as noted with asterisk*)
(copy w/out Enclosure except as noted with asterisk*)
Mr. Elmo E. Collins, Jr.
Mr. Elmo E. Collins, Jr.
* Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)* Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*
* Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738 ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738
 
ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution: (electronic copy w/out Enclosure)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher Secretary Mr. Paul Parmenter, Director (SEMA) Mr. Thomas Mohr, Senior REP Planner (SEMA) Mr. John Campbell, REP Planner (SEMA) Ms. Diane M. Hooper Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (pG&E) Mr. Wayne Harrison Ms. Linda Conklin (SCE) Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP) Mr. Dru Buntin (DNR)}}
(electronic copy w/out Enclosure)
A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher
      ~SRB Secretary Mr. Paul Parmenter, Director (SEMA)
Mr. Thomas Mohr, Senior REP Planner (SEMA)
Mr. John Campbell, REP Planner (SEMA)
Ms. Diane M. Hooper (WC~OC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (pG&E)
Mr. Wayne Harrison (STP~OC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)
Mr. Dru Buntin (DNR)}}


=Text=
=Text=
{{#Wiki_filter:WAmeren MISSOURI Callaway Plant SECURITY-RELATED INFORMATION  
{{#Wiki_filter:~~
-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
WAmeren                                                                                       Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)
10 CFR 50. 54(f) DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50. 54(hb)(2).
Ladies and Gentlemen:
Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011. The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).
FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section
: 50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).
In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.
The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).
The Enclosure to this letter contains sensitive information.
The Enclosure to this letter contains sensitive information.
Withhold from public disclosure under 10 CFR 2.390. Upon removal of the Enclosure, this letter is uncontrolled.
Withhold from public disclosure under 10 CFR 2.390.
SECURITY-RELATED INFORMATION  
Upon removal of the Enclosure, this letter is uncontrolled.
-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620     Fulton, MO 65251 AmerenMissouri.com
I declare under penalty of perjury that the foregoing and attached are true and correct. Executed on: JuJ j I \ ) AD II KRNnls  
 
ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.
I declare under penalty of perjury that the foregoing and attached are true and correct.
Sincerely, Executed on:   JuJ j I \ ) AD II                           ~t?
Cleveland o. Reasoner III Vice President Engineering KRNnls


==Enclosure:==
==Enclosure:==
60-Day Response to Bulletin 2011-01


60-Day Response to Bulletin 2011-01 Sincerely, Cleveland
ULNRC-05807 July 11, 2011 Page 3 cc:
: o. Reasoner III Vice President Engineering ULNRC-05807 July 11, 2011 Page 3 cc: (copy w/out Enclosure except as noted with asterisk*)
(copy w/out Enclosure except as noted with asterisk*)
Mr. Elmo E. Collins, Jr.
Mr. Elmo E. Collins, Jr.
* Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)* Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*
* Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738 ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*
Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738
 
ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)
Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution: (electronic copy w/out Enclosure)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher Secretary Mr. Paul Parmenter, Director (SEMA) Mr. Thomas Mohr, Senior REP Planner (SEMA) Mr. John Campbell, REP Planner (SEMA) Ms. Diane M. Hooper Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (pG&E) Mr. Wayne Harrison Ms. Linda Conklin (SCE) Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP) Mr. Dru Buntin (DNR)}}
(electronic copy w/out Enclosure)
A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher
      ~SRB Secretary Mr. Paul Parmenter, Director (SEMA)
Mr. Thomas Mohr, Senior REP Planner (SEMA)
Mr. John Campbell, REP Planner (SEMA)
Ms. Diane M. Hooper (WC~OC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (pG&E)
Mr. Wayne Harrison (STP~OC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)
Mr. Dru Buntin (DNR)}}

Latest revision as of 18:34, 12 November 2019

60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML111930161
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/11/2011
From: Reasoner C
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML111930160 List:
References
BL-11-001, ULNRC-05807
Download: ML111930161 (4)


Text

~~

WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section

50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.

The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of the Enclosure, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.

I declare under penalty of perjury that the foregoing and attached are true and correct.

Sincerely, Executed on: JuJ j I \ ) AD II ~t?

Cleveland o. Reasoner III Vice President Engineering KRNnls

Enclosure:

60-Day Response to Bulletin 2011-01

ULNRC-05807 July 11, 2011 Page 3 cc:

(copy w/out Enclosure except as noted with asterisk*)

Mr. Elmo E. Collins, Jr.

  • Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738

ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

(electronic copy w/out Enclosure)

A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher

~SRB Secretary Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WC~OC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STP~OC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)

Text

~~

WAmeren Callaway Plant MISSOURI SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 11, 2011 ULNRC-05807 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. 54(f)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 60-DAY RESPONSE TO NRC BULLETIN 2011-01, "MITIGATING STRATEGIES" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section

50. 54(hb)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the Bulletin, which was provided for Callaway Plant on June 10, 2011.

The Enclosure to this letter forwards the response requested within 60 days of the date of the Bulletin to provide information for Callaway Plant regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The Enclosure to this letter contains sensitive information.

Withhold from public disclosure under 10 CFR 2.390.

Upon removal of the Enclosure, this letter is uncontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05807 July 11, 2011 Page 2 The Enclosure includes information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Steve Hogan, Assistant Manager Protective Services, at 573-544-5881.

I declare under penalty of perjury that the foregoing and attached are true and correct.

Sincerely, Executed on: JuJ j I \ ) AD II ~t?

Cleveland o. Reasoner III Vice President Engineering KRNnls

Enclosure:

60-Day Response to Bulletin 2011-01

ULNRC-05807 July 11, 2011 Page 3 cc:

(copy w/out Enclosure except as noted with asterisk*)

Mr. Elmo E. Collins, Jr.

  • Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)*

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. James Polickoski*

Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8BIA Washington, DC 20555-2738

ULNRC-05807 July 11, 2011 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attaclunents as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

(electronic copy w/out Enclosure)

A. C. Heflin F. M. Diya C. O. Reasoner ill L. H. Graessle S. P. Banker S. P. Hogan S.M.Maglio T. B. Elwood S. L. Gallagher

~SRB Secretary Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. John Campbell, REP Planner (SEMA)

Ms. Diane M. Hooper (WC~OC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (pG&E)

Mr. Wayne Harrison (STP~OC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)